|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217B3331999-10-0707 October 1999 Responds to 990825 Telephone Call Re Presense of Polychlorinated Biphenyl Wastes at Plant,Unit 1 ML20212F4481999-09-17017 September 1999 Forwards NRC Form 536 Containing Currently Proposed Site Specific Operator Licensing Exam Schedule & Estimates of Number of Applicants for Generic Fundamentals Exams Through Cy 2003 ML20212F7051999-09-14014 September 1999 Forwards Rev 19 to Ipn,Units 1 & 2 Physical Security Plan. Plan Withheld,Per 10CFR2.790(d) & 73.21 ML20211N0681999-09-0202 September 1999 Informs That Commission Requested Publication of Notice of Consideration of Issuance of Amend to Fol,Proposed NSHC Determination & Opportunity for Hearing. Amend Changes Senior Reactor License Requirement for Operations Manager ML20211H6291999-08-26026 August 1999 Forwards NPDES Discharge Monitoring Rept for July 1999 for Indian Point,Units 1,2 & 3. Rept of Noncompliance Is Attached for Noncompliance Which Occurred at Unit 3 ML20211E1531999-08-18018 August 1999 Forwards Semi Annual fitness-for-duty Program Performance Data for 990101-990630,IAW 10CFR26.71(d) ML20211H6051999-08-18018 August 1999 Forwards Rev 8 to Security Force Training & Qualification Plan, for Indian Point 3 Nuclear Power Plant.Rev Facilitates Transition of Duty Weapons Carried by Security Force Members from Revolvers to Semiautomatic Pistols ML20211A9241999-08-11011 August 1999 Informs That IPS Currently Estimates,That Approx Two Licensing Actions Will Be Submitted to NRC During Remainder of 1999 NRC Fiscal Yr & Approx Ten Will Be Submitted During 2000 NRC Fiscal Yr ML20210M7251999-07-26026 July 1999 Forwards Projection of Ability to Pay Retrospective Premium Adjustment for Period of Aug 1999 to 000731, Which Demonstrates That Ceny Will Have Sufficient Cash Flow &/Or Cash Reserve Available Throughout Period to Pay Premium ML20210G8911999-07-20020 July 1999 Forwards Application for Amend to License DPR-5 for Proposed New TS 3.2.1.i,revising Senior Reactor License Requirement for Operations Manager ML20209B6611999-06-29029 June 1999 Returns Recently Submitted Renewal Applications,Nrc Form 398,for Three Reactor Operators,As They Are Not Completed Properly.List of Docket Numbers & Block Numbers That Contain Incorrect Info & Block Numbers Not Completed.Without Encls ML20196A6371999-06-15015 June 1999 Forwards Rev 19 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(d) & 73.21 ML20207D1861999-05-27027 May 1999 Informs That Effective 990328,NRC Office of NRR Underwent Reorganization.Mt Masnik Section Chief for Indian Point Station,Unit 1.JL Minns Remains Primary Contact for All Routine Licensing & Administrative Matters.Chart Encl ML20205R1981999-04-15015 April 1999 Requests That Dept of Environ Conservation Modify SPDES Permit for IPS IAW Proposed Rev Attached & Described as Listed ML20205R2961999-04-15015 April 1999 Forwards Copy of Proposed Change to Indian Point SPDES Permit NY0004472.Proposed Change Requests Permission to Add Permitted Outfall to Plant as Well as Change Character of Existing Outfall.Without Encl ML20196K8111999-03-31031 March 1999 Forwards Decommissioning Funding Status Rept for Indian Point,Units 1 & 2 Through 981231 ML20205F9711999-03-25025 March 1999 Informs That Under Separate Cover,Licensee Transmitted to Ofc of Nuclear Regulatory Research Annual Rept of Results of Individual Monitoring at Indian Point,Units 1 & 2,for CY98 ML20204F7931999-03-17017 March 1999 Forwards Table Outlining Nuclear Property Insurance Which Has Been Placed on Behalf of Consolidated Edison Co of Ny, Inc.Insurance Covers Indian Point,Units 1 & 2 ML20204J9971999-03-0909 March 1999 Forwards Insp Rept 50-003/98-19 on 981130-990222.No Violations Noted ML20203B9001999-02-0808 February 1999 First Partial Response to FOIA Request for Documents. Forwards Documents Listed in App a Already Available in PDR, Documents in App B Released in Entirety & Documents in App C Being Withheld in Part (Ref Exemption 6) ML20202J6171999-02-0505 February 1999 Forwards Transcript from 990120 Public Meeting Held in Peekskill,Ny Re Decommissioning ML20199H3731999-01-11011 January 1999 Informs That T Schmeiser,Con Ed Plant Manager for Plant Is Retiring,Effective 990111.AA Blind Will Assume Duties & Responsibilities of Plant Manager Until Replacement Named ML20198E9561998-12-21021 December 1998 Forwards Order Prohibiting Involvement in NRC Licensed Activities Re Deliberate Misconduct in Violation of Regulation When False Info Was Provided to Two NRC Licensees ML20198C2371998-12-15015 December 1998 Ltr Contract:Task Order 237, Review & Evaluation of Indian Point 3 Nuclear Power Plant Application for Conversion to Improved TS, Under Contract NRC-03-95-026 ML20198C4911998-12-11011 December 1998 Forwards Rev 18 to Physical Security Plan,Reflecting Organizational Changes & Incorporating Administrative Corrections & Clarifications.Encl Withheld ML20198C3251998-12-11011 December 1998 Responds to ,Responding to NRC Ltr Re Concerns Raised About Potential Chilling Effect from Temp Denial of Site Access to Employee Raising Safety Issues to Util Senior Mgt ML20155H2901998-11-0303 November 1998 Responds to to Lj Callan Expressing Concern About Continued Operation of Indian Point Nuclear Generating Station.Explanation Why NRC Do Not Think Revoking OLs for Indian Point Units 2 & 3 Justified,Provided ML20155F9181998-10-28028 October 1998 Forwards Changes to SPDES Permit,Removing Requirement to Monitor Svc Boiler Blowdown for Phosphates,Eliminate Redundant Sampling of Oil or Grease Entering Flow Tributary to Floor Drains,Per Ts,App B,Section 3.2 ML20155D2791998-10-23023 October 1998 Forwards Corrected Pages for Indian Point Annual Radiological Environ Operating Rept for 1997 ML20154Q1761998-10-21021 October 1998 Second Final Response to FOIA Request for Documents. Documents Listed in App C Being Withheld in Part (Ref FOIA Exemption 7) ML20154L8031998-10-16016 October 1998 Ack Receipt of & Payment in Amount of $55,000 in Electronic Funds for Civil Penalty Proposed by NRC in .Corrective Actions Will Be Examined During Future Insp ML20155H3021998-09-24024 September 1998 Urges NRC to Revoke Operating Licenses for Indian Point Nuclear Generating Station,Units 2 & 3 & Not Renew OL for Unit 1 ML20154A1391998-09-22022 September 1998 Informs That Effective 980724,AA Blind Assumed Position of Vice President,Nuclear Power & Ja Baumstark Assumed Position of Vice President,Nuclear Power Engineering,Effective 980813 ML20153F0661998-09-18018 September 1998 Provides Response to Violations Noted in Insp Rept 50-286/98-05 & Proposed Imposition of Civil Penalty Dtd 980819.Corrective Actions:Existing Drawings for Spare Switchgear Cubicles Have Been Revised ML20151W4871998-09-10010 September 1998 Informs That as Part of NRC Probabilistic Risk Assessment Implementation Plan,Commission Assigned Two Senior Reactor Analysts (Sras) to Each Regional Ofc.T Shedlosky & J Trapp Has Been Assigned as SRAs for Region I ML20151W9511998-09-10010 September 1998 Informs That as Part of NRC PRA Implementation Plan, Commission Has Assigned Two Senior Reactor Analysts (Sras) to Regional Ofc.T Shedlosky & J Trapp Has Been Assigned SRAs Duties for Region I ML20155F4391998-08-26026 August 1998 Forwards Demand for Info,Being Issued to Enable NRC to Fully Understand Recipient Views on Facts & Circumstances Surrounding Allegedly False Info Provided to Two NRC-licensed Activities ML20238F5151998-08-26026 August 1998 First Partial Response to FOIA Request for Documents. Documents Listed in App a Being Released in Entirety. Documents Listed in App B Being Withheld in Part (Ref FOIA Exemption 6) IR 05000286/19980051998-08-19019 August 1998 Discusses Insp Rept 50-286/98-05 on 980528-0612 & Forwards NOV & Proposed Imposition of Civil Penalty in Amount of $55,000.Most Significant Violation Involved Failure, Following Design Mod in Oct 1997 ML20237B1001998-08-0505 August 1998 Responds to NRC Re Violations Noted in Insp Repts 50-247/97-13,50-247/97-15,50-247/98-02 & Investigation Rept 1-97-038,respectively.Corrective Actions:Acted Promptly to Assure Conforming to Testing Requirements ML20236X8511998-07-31031 July 1998 Forwards Rept Re Projection of Ability to Pay Retrospective Premium Adjustment for Period 980801-990731,per 10CFR140.21 ML20236V4211998-07-13013 July 1998 Forwards SER Approving Topical Repts WCAP-14333P & WCAP-14334NP (Proprietary & non-propiretary, PRA of RPS & ESFAS Test Times & Completion Times ML20236Q1431998-07-0808 July 1998 Responds to Administrative Ltr 98-03 Re Operating Reactor Licensing Action Estimates IR 05000247/19970131998-07-0606 July 1998 Discusses Insp Repts 50-247/97-13,50-247/97-15 & 50-247/98-02 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $110,000 ML20238F5231998-06-29029 June 1998 FOIA Request for Documents Re NRC Office of Investigation Rept 1-97-038,meeting Minutes of Summary of Enforcement Conference on 980506 & Meeting Minutes or Summary of 980520 Predecisional Enforcement Conference ML20154Q1831998-06-29029 June 1998 FOIA Request for Documents Re NRC OI Rept 1-97-038,meeting Minutes of Summary of Enforcement Conference on 980506 & Meeting Minutes or Summary of 980520 Predecisional Enforcement Conference ML20236J9871998-06-24024 June 1998 First Final Response to FOIA Request for Documents.Documents Listed in App a Already Available in Pdr.Documents Listed in App B Being Released in Entirety ML20248F2891998-05-26026 May 1998 Ltr Contract:Task Order 8, Indian Point 2,A/E Follow-up Insp, Under Contract NRC-03-98-021 ML20248L9861998-05-21021 May 1998 Forwards Rev 7 to Security Force Training & Qualification Plan.Review to Verify Receipt of Revised Plan & Sign & Return Receipt Ack Form Provided ML20247M6951998-05-20020 May 1998 Forwards RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, for Plant,Unit 2 1999-09-02
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20212F4481999-09-17017 September 1999 Forwards NRC Form 536 Containing Currently Proposed Site Specific Operator Licensing Exam Schedule & Estimates of Number of Applicants for Generic Fundamentals Exams Through Cy 2003 ML20212F7051999-09-14014 September 1999 Forwards Rev 19 to Ipn,Units 1 & 2 Physical Security Plan. Plan Withheld,Per 10CFR2.790(d) & 73.21 ML20211H6051999-08-18018 August 1999 Forwards Rev 8 to Security Force Training & Qualification Plan, for Indian Point 3 Nuclear Power Plant.Rev Facilitates Transition of Duty Weapons Carried by Security Force Members from Revolvers to Semiautomatic Pistols ML20211E1531999-08-18018 August 1999 Forwards Semi Annual fitness-for-duty Program Performance Data for 990101-990630,IAW 10CFR26.71(d) ML20211A9241999-08-11011 August 1999 Informs That IPS Currently Estimates,That Approx Two Licensing Actions Will Be Submitted to NRC During Remainder of 1999 NRC Fiscal Yr & Approx Ten Will Be Submitted During 2000 NRC Fiscal Yr ML20210M7251999-07-26026 July 1999 Forwards Projection of Ability to Pay Retrospective Premium Adjustment for Period of Aug 1999 to 000731, Which Demonstrates That Ceny Will Have Sufficient Cash Flow &/Or Cash Reserve Available Throughout Period to Pay Premium ML20210G8911999-07-20020 July 1999 Forwards Application for Amend to License DPR-5 for Proposed New TS 3.2.1.i,revising Senior Reactor License Requirement for Operations Manager ML20196A6371999-06-15015 June 1999 Forwards Rev 19 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(d) & 73.21 ML20205R2961999-04-15015 April 1999 Forwards Copy of Proposed Change to Indian Point SPDES Permit NY0004472.Proposed Change Requests Permission to Add Permitted Outfall to Plant as Well as Change Character of Existing Outfall.Without Encl ML20196K8111999-03-31031 March 1999 Forwards Decommissioning Funding Status Rept for Indian Point,Units 1 & 2 Through 981231 ML20205F9711999-03-25025 March 1999 Informs That Under Separate Cover,Licensee Transmitted to Ofc of Nuclear Regulatory Research Annual Rept of Results of Individual Monitoring at Indian Point,Units 1 & 2,for CY98 ML20204F7931999-03-17017 March 1999 Forwards Table Outlining Nuclear Property Insurance Which Has Been Placed on Behalf of Consolidated Edison Co of Ny, Inc.Insurance Covers Indian Point,Units 1 & 2 ML20199H3731999-01-11011 January 1999 Informs That T Schmeiser,Con Ed Plant Manager for Plant Is Retiring,Effective 990111.AA Blind Will Assume Duties & Responsibilities of Plant Manager Until Replacement Named ML20198C4911998-12-11011 December 1998 Forwards Rev 18 to Physical Security Plan,Reflecting Organizational Changes & Incorporating Administrative Corrections & Clarifications.Encl Withheld ML20155F9181998-10-28028 October 1998 Forwards Changes to SPDES Permit,Removing Requirement to Monitor Svc Boiler Blowdown for Phosphates,Eliminate Redundant Sampling of Oil or Grease Entering Flow Tributary to Floor Drains,Per Ts,App B,Section 3.2 ML20155D2791998-10-23023 October 1998 Forwards Corrected Pages for Indian Point Annual Radiological Environ Operating Rept for 1997 ML20155H3021998-09-24024 September 1998 Urges NRC to Revoke Operating Licenses for Indian Point Nuclear Generating Station,Units 2 & 3 & Not Renew OL for Unit 1 ML20154A1391998-09-22022 September 1998 Informs That Effective 980724,AA Blind Assumed Position of Vice President,Nuclear Power & Ja Baumstark Assumed Position of Vice President,Nuclear Power Engineering,Effective 980813 ML20153F0661998-09-18018 September 1998 Provides Response to Violations Noted in Insp Rept 50-286/98-05 & Proposed Imposition of Civil Penalty Dtd 980819.Corrective Actions:Existing Drawings for Spare Switchgear Cubicles Have Been Revised ML20237B1001998-08-0505 August 1998 Responds to NRC Re Violations Noted in Insp Repts 50-247/97-13,50-247/97-15,50-247/98-02 & Investigation Rept 1-97-038,respectively.Corrective Actions:Acted Promptly to Assure Conforming to Testing Requirements ML20236X8511998-07-31031 July 1998 Forwards Rept Re Projection of Ability to Pay Retrospective Premium Adjustment for Period 980801-990731,per 10CFR140.21 ML20236Q1431998-07-0808 July 1998 Responds to Administrative Ltr 98-03 Re Operating Reactor Licensing Action Estimates ML20238F5231998-06-29029 June 1998 FOIA Request for Documents Re NRC Office of Investigation Rept 1-97-038,meeting Minutes of Summary of Enforcement Conference on 980506 & Meeting Minutes or Summary of 980520 Predecisional Enforcement Conference ML20154Q1831998-06-29029 June 1998 FOIA Request for Documents Re NRC OI Rept 1-97-038,meeting Minutes of Summary of Enforcement Conference on 980506 & Meeting Minutes or Summary of 980520 Predecisional Enforcement Conference ML20248L9861998-05-21021 May 1998 Forwards Rev 7 to Security Force Training & Qualification Plan.Review to Verify Receipt of Revised Plan & Sign & Return Receipt Ack Form Provided ML20217F8501998-03-20020 March 1998 Forwards Table Which Outlines Nuclear Property Insurance That Has Been Placed on Behalf of Util,Per 10CFR50.54(w)(3) ML20199L9531998-01-26026 January 1998 Forwards Addl Info on Rev 6 to Security Force Training & Qualification Plan,Per 980113 Telcon Request of G Smith.Encl Withheld ML20199F7541998-01-21021 January 1998 Forwards Rev 17 to Physical Security Plan,Per Requirements of 10CFR50.54(p).Rev 17 Contains Summary of Changes, Detailing Changes Incorporated.Encl Withheld ML20198N1151998-01-20020 January 1998 Submits Status of Response to NRC Request for Addl Info, for Licenses TR-3 & R-93.Request for Commitment to Complete Decommissioning Activities by 2007 Has Been Persued Up Through Nasa Mgt ML20202F8281997-11-26026 November 1997 Reports Mod to Indian Point SPDES Permit as Required in Ts. Copy of New York State Dept of Environ Conservation Ltr That Modifies Permit Is Encl ML20198P7901997-10-31031 October 1997 Forwards Rev 6 to Physical Security Plan,Per 10CFR50.4(b)(4) to Meet Requirements of 10CFR50.54(p).Rev 16 Contains Summary of Changes, Detailing Changes Incorporated. Encl Withheld ML20198P3181997-10-30030 October 1997 Forwards Corrected Pages to Annual Radiological Environ Operating Rept for 1996 ML20211H7771997-10-0202 October 1997 Forwards Responses to RAIs 650.1 Through 650.8 Re Generic Issues & Generic Communications on Valve Testing & Valve Qualification.Westinghouse Status for Subject Issues Will Be Confirm W Pending Rev to Ssar & WCAP-13559 ML20211B4241997-09-19019 September 1997 Requests Withdrawal of Revs 16 & 18 to Physical Security Plan.Rev 16 re-submitted Per Provisions of 10CFR50.54(p)(2) & Deals W/Specific Operational Criteria of New Sys.Plan Withheld ML20211A9411997-09-18018 September 1997 Responds to NRC Re Violations Noted in Insp Rept 50-286/97-80.Corrective Actions:Revised Administrative Procedure AP-3 to Establish Responsibility for Engineering Review & Revised EOP ES-1.3 ML20149J2491997-07-16016 July 1997 Forwards Environ Ts/Nonroutine Event Rept for Units 1 & 2. Appropriate Ny State Agency Notified ML20148S5731997-06-26026 June 1997 Forwards Response to NRC Re Violations Noted in Insp Repts 50-247/96-80;96-07;96-08;97-03 & Imposition of Civil Penalties on 961027-970405.Corrective Actions:Unique Tag Numbers for Louvers Were Generated ML20148J1431997-06-0404 June 1997 Forwards Rev 15A to Ipn Units 1 & 2 Physical Security Plan, Per 10CFR50.54(p)(2).Plan Withheld ML20137M8371997-04-0101 April 1997 Provides Supplemental Response to RAI Re TS Change Request 96-01 on Conversion to Framatome Cogema Fuel.Tech Specs, Encl ML20137A8301997-03-13013 March 1997 Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-286/96-80 on 961213.Corrective Actions:Expert Panel Has Agreed to Include Turbine Bldg & Power Conversion Equipment Bldg in Scope of IP3 Maint Rule Program JPN-97-008, Forwards Comments on Draft NUREG-1560, IPE Program: Persprctives on Reactor Safety & Plant Performance1997-03-0404 March 1997 Forwards Comments on Draft NUREG-1560, IPE Program: Persprctives on Reactor Safety & Plant Performance ML1004713451997-02-26026 February 1997 Forwards Proprietary & non-proprietary Versions of W Rept Entitled, Conditional Extension of Rod Misalignment TS for Indian Point 3. Authorization Ltr & Affidavit,Encl. Proprietary Encl Withheld Per 10CFR2.790 ML20135C7121997-02-21021 February 1997 Forwards Table That Outlines Nuclear Property Insurance on Behalf of Util Covering Units 1 & 2 ML1004713471997-02-18018 February 1997 Authorizes Utilization of Encl Affidavit by Util Re WCAP-14669,Rev 1, Conditional Extension of Rod Misalignment TS for Indian Point 3. Rept Should Be Withheld Per 10CFR2.790(b)(4) ML20134N6481996-12-24024 December 1996 Provides Further Details Re Corporate Reorganization of Consolidated Edison Co of Ny for Indian Point Units 1 & 2 ML20132C8071996-12-12012 December 1996 Forwards Check for $100 for Payment of NRC Invoice 7I0053 for Indemnity Fee on License DPR-5 for One Year Period 961204-971203.W/o Check ML20129D9611996-10-11011 October 1996 Forwards Controlled Copy of Plant Physical Security Plan,Rev 18,re Access Control Upgrade Which Adopts Biometric Hand Geometry.W/O Encl ML20117P6151996-09-11011 September 1996 Forwards Rev 9 to Security Training & Qualification Plan.W/O Encl ML20117E3891996-08-21021 August 1996 Forwards Four Copies of IP3 Security Contingency Plan,Rev 4. W/O Encl JPN-96-035, Informs NRC That Boraflex Not Used as Neutron Absorber in Either Util or Plant Spent Fuel Pool Storage Racks,Per GL 96-041996-08-0606 August 1996 Informs NRC That Boraflex Not Used as Neutron Absorber in Either Util or Plant Spent Fuel Pool Storage Racks,Per GL 96-04 1999-09-17
[Table view] Category:VENDOR/MANUFACTURER TO NRC
MONTHYEARML1003314881990-08-10010 August 1990 Requests That Proprietary WCAP-12687, Indian Point Unit 2 Steam Generator Tube Fatigue Reevaluation, Rev 2 Be Withheld Per 10CFR2.790(b)(4) ML1003314931990-07-31031 July 1990 Requests That Proprietary Rept WCAP-12670, Indian Point Unit 2 - Final Rept on Steam Generator Insp,Repair & Restoration Efforts During 1990 Midcycle Insp, Be Withheld (Ref 10CFR2.790(b)(4)).Affidavit Encl ML1003314481990-06-15015 June 1990 Requests Withholding of WCAP-12625 & WCAP-12627 Per 10CFR2.790(b)(4) ML1003312281990-05-14014 May 1990 Requests Withholding of Proprietary WCAP 12573, Indian Point Unit 2 Steam Generator Insp,Repair & Restoration Program, from Public Disclosure (Ref 10CFR2.790) ML19332B9341989-11-10010 November 1989 Requests That Proprietary WCAP-12442, Info Presented to NRC Concerning Indian Point Unit 2 Steam Generator Loose Objects, Be Withheld (Ref 10CFR2.790) ML19332D6611989-10-30030 October 1989 Requests That Proprietary Rev 2 to WCAP-12293, Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept, Spring,1989 Outage Be Withheld from Public Disclosure (Ref 10CFR2.790) ML20248B3081989-06-0505 June 1989 Requests That Proprietary Rev 1 to WCAP-12293, Steam Generator Girth Weld/Feedwater Nozzles Rept,Spring 1989 Outage Be Withheld from Public Disclosure (Ref 10CFR2.790) ML20006B4891988-05-0909 May 1988 Requests That Proprietary WCAP-11811, Indian Point Unit 2 Tube Fatigue Evaluation, Be Withheld from Public Disclosure (Ref 10CFR2.790).Affidavit Encl NRC-85-3061, Submits Internal Review Results Concluding That Safety Deficiencies,Intimidation & Retaliation Alleged by Ja Segletes Did Not Occur,Confirming 850712 Preliminary Assessment.Related Info Encl1985-09-13013 September 1985 Submits Internal Review Results Concluding That Safety Deficiencies,Intimidation & Retaliation Alleged by Ja Segletes Did Not Occur,Confirming 850712 Preliminary Assessment.Related Info Encl ML0934310651982-10-20020 October 1982 Authorizes Utilization of Previously Furnished Affidavit in Support of Facility.Info Re Proprietary Aspects of Application for Withholding or Affidavit Should Ref CAW-82-62 & Be Addressed to Author.W/O Encl Affidavit ML0934310161982-09-28028 September 1982 Authorizes Utilization of Encl Application for Withholding AW-80-53 ML19289F3661979-04-26026 April 1979 Requests Withholding from Public Disclosure of Util Response to NRC Request for Info Re Fracture Toughness & Potential for Tearing of Steam Generator & Reactor Coolant Pump Support Matl 1990-08-10
[Table view] |
Text
PROP Z)*
Westinghouse Energy Systems Box 355 Electric Corporation PittsburRh Pennsylvania 15230-0355 August 10, 1990 CAW-90-061 Document Control Desk US Nuclear Regulatory Commission Washington, DC 20555 Attention: Dr. Thomas Murley, Director APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE
Subject:
WCAP-12687 (Proprietary) and WCAP-12688 (Non-Proprietary) titled "Indian Point Unit 2 - Steam Generator Tube Fatigue Re-Evaluation"
Dear Dr. Murley:
The proprietary information for which withholding is being requested in the above-referenced letter is further identified in Affidavit CAW-90-061 signed by the owner of the proprietary information, Westinghouse Electric Corporation.
-The affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR Section 2.790 of the Commission's regulations.
Accordingly, this letter authorizes the utilization of the accompanying Affidavit by Consolidated Edison.
Correspondence with respect to the proprietary aspects of the application for withholding or the Westinghouse affidavit should reference this letter, CAW-90-061, and should be addressed to the undersigned.
Verytruly yours, Robert A. Wiesemann, Manager Endlosures Regulatory & Legislative Affairs cc: C. M. Holzle, Esq.
Office of the General Counsel, NRC AUG I 10
.)1k ' 5- pC NUWMUMfcm
PROPRIETARY INFORMATION NOTICE TRANSMITTED HEREWITH ARE PROPRIETARY AND/OR NON-PROPRIETARY VERSIONS OF DOCUMENTS FURNISHED TO THE NRC IN CONNECTION WITH REQUESTS FOR GENERIC AND/OR PLANT SPECIFIC REVIEW AND APPROVAL.
IN ORDER TO CONFORM TO THE REQUIREMENTS OF 10CFR 2.790 OF THE COMMISSION'S REGULATIONS CONCERNING THE PROTECTION OF PROPRIETARY INFORMATION SO SUBMITTED TO THE NRC, THE INFORMATION WHICH IS PROPRIETARY IN THE PROPRIETARY VERSIONS IS CONTAINED WITHIN BRACKETS AND WHERE THE PROPRIETARY INFORMATION HAS BEEN DELETED IN THE NON-PROPRIETARY VERSIONS ON THE BRACKETS REMAIN, THE INFORMATION THAT WAS CONTAINED WITHIN BRACKETS AND WHERE THE PROPRIETARY INFORMATION HAS BEEN DELETED IN THE NON-PROPRIETARY VERSIONS ONLY THE BRACKETS REMAIN, THE INFORMATION THAT WAS CONTAINED WITHIN THE.BRACKETS IN THE PROPRIETARY VERSIONS HAVING BEEN DELETED. THE JUSTIFICATION FOR CLAIMING THE INFORMATION SO DESIGNATED AS PROPRIETARY IS INDICATED IN BOTH VERSIONS BY MEANS OF LOWER CASE LETTERS (a) THROUGH (g) CONTAINED WITHIN PARENTHESES LOCATED AS A SUPERSCRIPT IMMEDIATELY FOLLOWING THE BRACKETS ENCLOSING EACH ITEM OF INFORMATION BEING IDENTIFIED AS PROPRIETARY OR IN THE MARGIN OPPOSITE SUCH INFORMATION. THESE LOWER CASE LETTERS REFER TO THE TYPES OF INFORMATION WESTINGHOUSE CUSTOMARILY HOLDS IN CONFIDENCE IDENTIFIED IN SECTIONS (4)(ii)(a) THROUGH (4)(ii)(g) OF THE AFFIDAVIT ACCOMPANYING THIS TRANSMITTAL PURSUANT TO 10CFR2.790(b)(1).
Copyright Notice The reports transmitted herewith each bear a Westinghouse copyright notice.
The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.790 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection not withstanding. With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. The NRC is not authorized to make copies for the personal use of members of the public who make use of the NRC public document rooms. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.
CAW-90-061 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:
ss COUNTY OF ALLEGHENY:
Before me, the undersigned authority, personally appeared Robert A. Wiesemann, who, being by me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Westinghouse Electric Corporation ("Westinghouse") and that the averments of fact set forth in this Affidavit are true and correct to the best of his knowledge, information, and belief:
Robert A. Wiesemann, Manager Regulatory and Legislative Affairs Sworn to and subscribed before me this 7 day of 1990.
Notary Public NOTARIAL SEAL LORRAINE M. PIPLICA, NOTARY PUBLIC MONROEVILLE BORO, ALLEGHENY COUNTY MY COMMISSION EXPIRES DEC. 14, 1991 Member, Pennsylvania Association of Notaries
CAW-90-061 (1) 1 am Manager, Regulatory and Legislative Affairs, in the Nuclear and Advanced Technology Division, of the Westinghouse Electric Corporation and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rulemaking proceedings, and am authorized to apply for its withholding on behalf of the Westinghouse Energy Systems Business Unit.
(2) I am making this Affidavit in conformance with the provisions of 10CFR Section 2.790 of the Commission's regulations and in conjunction with the Westinghouse application for withholding accompanying this Affidavit.
(3) 1 have personal knowledge of the criteria and procedures utilized by the Westinghouse Energy Systems Business Unit in designating information as a trade secret, privileg ed or as confidential commercial or financial information.
(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.790 of the Commission' s regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.
3- CAW-90-061 (ii)The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public.
Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitutes Westinghouse policy and provides the rational basis required.
Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
CAW-90-061 (c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.
(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
(f) It contains patentable ideas, for which patent protection may be desirable.
(g) It is not the property of Westinghouse, but must be treated as proprietary by Westinghouse according to agreements with the owner.
There are sound policy reasons behind the Westinghouse system which include the following:
(a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.
CAW-90-061 (b) It is information which is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.
(c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.
(d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a.
competitive advantage.
(e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.
(f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.
CAW-90-061 (iii) The information is being transmitted to the Commission in confidence and, under the provisions of 10CFR Section 2.790, it is to be received in confidence by the Commission.
(iv) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.
(v) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in "Indian Point Unit 2 - Steam Generator Tube Fatigue Re-Evaluation", WCAP-12687, (Proprietary), being transmitted by Consolidated Edison Company letter and Application for Withholding Proprietary Information from Public Disclosure, S. Bram to the Document Control Desk, Attention Dr. Thomas Murley, August, 1990. The proprietary information as submitted for Consolidated Edison, Indian Point 2 use is expected to be applicable in other licensee and applicant submittals in response to certain NRC requirements for justification of steam generator girth weld repair.
0 CAW-90-061 This information is part of that which will enable Westinghouse to:
(a) Provide documentation of the analysis, method and testing for determining plugging margin.
(b) Establish the minimum wall thickness in compliance with Regulatory Guide 1.121.
(c) Establish the stress limits versus thinning of the remaining tube wall.
(d) Establish the maximum allowable leakage in support of the leak-before-break criteria.
(e) Assist the customer to obtain NRC approval.
Further this information has substantial commercial value as follows:
(a) Westinghouse plans to sell the use of similar information to its customers for purposes of meeting NRC requirements for licensing documentation.
CAW-90-061 (b) Westinghouse can sell support and defense of the technology to its customer in the regulatory review.
Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar analytical documentation and licensing defense services-for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet Commis sion requirements for licensing documentation without purchasing the right to use the information.
The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.
In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended for system design software development.
Further the deponent sayeth not.