ME2810, Revised RAIs from Cptb LAR to Delete SR3.4.3.2 and SR3.5.1.13
ML100321662
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/01/2010
From: Bhalchandra Vaidya
Plant Licensing Branch 1
To: Eugene Dorman, Joseph Pechacek
FitzPatrick
vaidya B, NRR/Dorl/lpl1-1, 415-3308
References
TAC ME2810
Download: ML100321662 (2)


Text

From:

Vaidya, Bhalchandra Sent:

Monday, February 01, 2010 4:31 PM To:

'Dorman, Eugene'; 'Pechacek, Joseph' Cc:

Salgado, Nancy; Tingen, Steve; McMurtray, Anthony; Hamm, Matthew; Elliott, Robert

Subject:

FitzPatrick - ME2810 - RAIs from CPTB The e-mail dated December 30 2009, Agencywide Documents Access and Management System (ADAMS)

Accession No. ML100060430, transmitted Draft Request for Additional Information (RAIs) from the NRC Component performance and Testing Branch (CPTB), Division of Component Integrity (DCI) staff and a Concern from NRC Technical Specifications Branch (ITSB), Division of Inspection & Regional Support (DIRS) staff Regarding your License Amendment Request dated November 23, 2009, ADAMS Accession No. ML093310431.

The NRC staff from DORL, CPTB and ITSB held a telephone discussion on January 7, 2010. The revised RAIs clarifying the Draft RAIs, from CPTB are provided below:

=========================================================
1. Current TS Surveillance Requirements (SRs) 3.4.3.2 and 3.5.1.13 require that the two solenoid operated valves (SOVs) for each S/RV be tested every 24 months on a staggered basis. Attachment 1 to the license amendment request states that SOV functional tests will be performed once per operating cycle. What license condition will require the SOVs be tested once per operating cycle after TS SRs 3.4.3.2 and 3.5.1.13 are deleted?
2. Current TS SRs 3.4.3.2 and 3.5.1.13 require that each S/RV be manually actuated on a 24 month interval. What license condition or series of overlapping license conditions will require that the S/RV main stage and pilot assemblies be capable of manual actuation after TS SRs 3.4.3.2 and 3.5.1.13 are deleted and at what intervals will this be performed?
==================================================

Please review these RAIs. As you requested in your e-mail dated January 28, 2010, I am arranging a teleconference. We will discuss them during our next tele-conference.

Bhalchandra K. Vaidya Licensing Project Manager NRC/NRR/DORL/LPL1-1 (301)-415-3308 (O) bhalchandra.vaidya@nrc.gov E-mail Properties Mail Envelope Properties ()

Subject:

FitzPatrick - ME2810 - RAIs from CPTB Sent Date: 02/01/2010 4:06:38 PM Received Date: 02/01/2010 4:30:00 PM From: Vaidya, Bhalchandra

Created By: Bhalchandra.Vaidya@nrc.gov Recipients:

EDorman@entergy.com ('Dorman, Eugene')

Tracking Status: None JPechac@entergy.com ('Pechacek, Joseph')

Tracking Status: None Nancy.Salgado@nrc.gov (Salgado, Nancy)

Tracking Status: None Steve.Tingen@nrc.gov (Tingen, Steve)

Tracking Status: None Anthony.McMurtray@nrc.gov (McMurtray, Anthony)

Tracking Status: None Matthew.Hamm@nrc.gov (Hamm, Matthew)

Tracking Status: None Robert.Elliott@nrc.gov (Elliott, Robert)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 15125 02/01/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: