ML100261521

From kanterella
Jump to navigation Jump to search
Supplement to License Amendment Request - Transition from Westinghouse Nuclear Fuel to Areva Nuclear Fuel
ML100261521
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/26/2010
From: George Gellrich
Calvert Cliffs, Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML100261541 List:
References
Download: ML100261521 (2)


Text

Georg e H. Gellrich Calvert Cliffs Nuclear Power Plant, LLC Vice President 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410.495 .5200 410 .495.3500 Fax a joint ventureof---------,

CALVERT CLIFFS UCLEAR POWER PLANT January 26, 2010

u. S. Nuclear Regulatory Commission Washington, DC 20555 TTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs N uclear Power Plant Unit Nos . 1 & 2; Docket Nos . 50-3 17 & 50-3 18 Supplement to License Amendment Request - Tran sition from Westinghouse Nu clear Fuel to AREVA Nuclear Fuel EFERENCES: (a) Letter from Mr. T.E. Trepan ier (CCNPP) to Document Control Desk (NRC), dated Nov ember 23, 2009, License Amendment Request -

Transition from Westinghouse Nuclear Fuel to AREVA Nuclear Fuel (b) Letter from Mr.D. V. Picket (NRC) to Mr. G.H. Gellrich (CCNPP), dated January 11, 201 0, Acceptance Review for License Amendment Request to Tran sition to AREVA Fuel Reference (a) submitted a license ame ndment request that wou ld modify the licensing basis and the Technical Specifications to allow the use of AREVA Advanced CE-14 High Thermal Performance fuel in the Calvert Cliffs reactors. The Nuclear Regulatory Comm ission provided the preliminary results of their acceptance review in Reference (b) . The N uclear Regulatory Commission staff determined that the license amendment request needed to be supp lemented in orde r for the staff to make an independent assessment regarding the acceptability of the proposed request. Specifically, the staff requested that a listing of the safety evaluation conditions, limitat ions and restrictions be provided, and document how compliance with each is attai ned and confirmed for each new method ology proposed for reference in the Core Operating Limits Report.

Attachment (1) provides the requested information. The information in this attachment supersedes any similar information contained in Reference (a) . Th is supp lemental information does not impact the No Significant Hazards Determination discus sion in Reference (a) .

Document Control Desk January 26, 20 10 Page 2 Should you have questions regarding this matter, please contact Mr . Douglas E. Lauver at (410) 49 5-5219 .

Very truly yours,

//<2~Ac$:~/

George H. Gellrich Vice President STATE OF MARYLAND TO WIT:

COUNTY OF CALVERT I, George H. Gellrich, be ing du ly sworn, state that I am Vice Pres ident - Calvert Cliffs Nu clear Power Plant, LLC (CCNPP), and that I am duly authorized to execute and file this Licen se Amendment Request on behalf of CCNPP. "[0 the best of my knowledge and belief, the statem ents contained in th is document are true and correct. To the extent that these statements are not based on my per sonal knowledge, they are based upon information provided by other CCNPP employees and/or consultants . Such information has been revie wed in accordance with company practice and I believe it to be rel iabl e.

and sworn before me, a Notary State of Maryland and County of

___,--,,--_~~----,r=------_ _ , th is ~ day 0 ~~;""';::::;--:~T---

  • IT"N[=3 my .~ . and and Notarial Sea l:

My Commission Expires: ~GJ. / 6 ate;;01/

GHG/PSF/bjd

Attachment:

( 1) SERRestr ict ion s for Calvert Cliffs cc: D. V . Pickett, NRC Resident Inspecto r, NRC S. J . Collins, N"RC S. Gray, Dl\JR