ML100261047

From kanterella
Jump to navigation Jump to search
Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection
ML100261047
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/26/2010
From: Daniel Merzke
Reactor Projects Branch 7
To: Franke J
Progress Energy Florida
References
Download: ML100261047 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 January 26, 2010 Mr. Jon A. Franke, Vice President Crystal River Nuclear Plant (NA1B)

Supervisor, Licensing &

Regulatory Programs 15760 West Power Line Street Crystal River, FL 34428-6708

SUBJECT:

CRYSTAL RIVER UNIT 3 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION

Dear Mr. Franke:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Crystal River Unit 3 during the weeks of April 5 - 9 and April 19 - 23, 2010. The inspection team will be led by Daniel Merzke, a Senior Project Engineer from the NRCs Region II office. This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71152, Identification and Resolution of Problems Inspection, issued January 10, 2008.

The biennial PI&R inspection and assessment of the licensees Corrective Action Program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.

On January 22, 2010, Mr. Merzke confirmed with Mr. Dennis Herrin of your staff, arrangements for an information gathering site visit and the two-week onsite inspection. The schedule is as follows:

  • Information gathering visit: February 18 - 19, 2010
  • Onsite weeks: April 5 - 9 and April 19 - 23, 2010 The purpose of the information gathering visit is to meet with members of your staff to define the scope of the inspection. Information and documentation needed to support the inspection will also be identified and reviewed.

The enclosure lists documents that will be needed prior to the information gathering visit.

Please have the referenced information available prior to February 18, 2010. Contact Mr.

Merzke with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.

FPC 2 Additional documents will be requested during the information gathering visit. The additional information will need to be made available to the team in the Region II office prior to the inspection teams preparation week of March 29, 2010. Mr. Merzke will also discuss the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; access to licensee computers; working space; arrangements for site access; and other applicable information.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Daniel Merzke at (404) 562-4421.

Sincerely,

/RA/

Daniel J. Merzke, Acting Chief Reactor Projects Branch 7 Division of Reactor Projects Docket No.: 50-302 License No.: DPR-72

Enclosure:

INFORMATION REQUEST FOR CRYSTAL RIVER UNIT 3 PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION cc w/encl: (See page 3)

PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.

PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

_ML100261047 X SUNSI REVIEW COMPLETE (D. Merzke)

OFFICE RII:DRP SIGNATURE DXM2 NAME DMerzke DATE 01/26/2010 1/ /2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO FPC 3 cc w/encls: Daniel R. Westcott, Supervisor R. J. Duncan, II, Vice President Licensing & Regulatory Programs Nuclear Operations Crystal River Nuclear Plant (NA1B)

Carolina Power & Light Company Electronic Mail Distribution Electronic Mail Distribution Joseph W. Donahue Brian C. McCabe Vice President Manager, Nuclear Regulatory Affairs Nuclear Oversight Progress Energy Carolinas, Inc. Carolina Power and Light Company Electronic Mail Distribution Electronic Mail Distribution James W. Holt, Plant General Manager Jack E. Huegel Crystal River Nuclear Plant (NA2C) Manager, Nuclear Oversight Electronic Mail Distribution Crystal River Nuclear Plant Electronic Mail Distribution Stephen J. Cahill Engineering Manager Mark Rigsby Crystal River Nuclear Plant (NA2C) Manager, Support Services - Nuclear Electronic Mail Distribution Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution R. Alexander Glenn Associate General Counsel Senior Resident Inspector (MAC - BT15A) U.S. Nuclear Regulatory Commission Florida Power Corporation Crystal River Nuclear Generating Plant Electronic Mail Distribution U.S. NRC 6745 N Tallahassee Rd Steven R. Carr, Associate General Counsel Crystal River, FL 34428 Legal Department Progress Energy Service Company, LLC Attorney General P.O. Box 1551 Department of Legal Affairs Raleigh, NC 27602-1551 The Capitol PL-01 Tallahassee, FL 32399-1050 Christos Kamilaris, Director Fleet Support Services Ruben D. Almaguer Carolina Power & Light Company Director Electronic Mail Distribution Division of Emergency Preparedness Department of Community Affairs William A. Passetti, Chief Electronic Mail Distribution Florida Bureau of Radiation Control Department of Health Chairman Electronic Mail Distribution Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250

FPC 4 Letter to Jon A. Franke from Daniel J. Merzke dated January 26, 2010

SUBJECT:

CRYSTAL RIVER UNIT 3 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION Distribution w/encl:

C. Evans, RII EICS L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPM Crystal River Resource

INFORMATION REQUEST FOR CRYSTAL RIVER UNIT 3 PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (APRIL 5-9 AND APRIL 19-23, 2010)

A. Documents Needed Prior to the Information Gathering Visit Note: Unless otherwise noted, the information requested below corresponds to documents generated since April 1, 2008. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate how the information will be provided.

1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to: a) corrective action process, b) cause evaluation, c) operating experience program, d) employee concerns program, e) self-assessment program, f) maintenance rule program and implementing procedures, g) operability determination process, h) degraded/non-conforming condition process (e.g., RIS 2005-20), i) system health process, or equivalent equipment reliability improvement programs, and j) preventive maintenance deferral and nuclear condition report (NCR) extension process. If any of the procedures requested above were revised after April 1, 2008, please provide copies of all revisions.
2. List of top ten risk significant systems, components, and operator manual actions.
3. List of all NCRs initiated, sorted by priority and system, with the following information: a)

NCR #, b) system, c) priority, and d) NCR title and short description.

4. List of all NCRs initiated, sorted by the following responsible plant departments. In each department grouping, please provide the NCRs sorted by priority, with the following information: a) NCR #, b) priority, and c) NCR title and short description.

a) Emergency Preparedness; b) Health Physics; c) Chemistry; and, d) Security.

5. List of outstanding corrective actions with a brief description, priority level, initiation date, and due date.
6. List of control room deficiencies with a brief description and corresponding NCR and/or work order (WO) number.
7. List of operator workarounds and operator burdens with a brief description and corresponding NCR number
8. List of all currently extended NCRs or overdue, sorted by initiation date, with the following information: a) NCR #, b) priority, and c) NCR title and short description.
9. List of all NCRs that have been voided or cancelled. Please sort by NCR #, with title or description of problem, and reason voided or cancelled.

Enclosure

2

10. List of all structures, systems, and components (SSC) which were classified as (a)(1) in accordance with the Maintenance Rule since April 1, 2008. Please include applicable procedures for classifying systems or components as (a)(1), date and reason for being placed in (a)(1), and actions completed and current status. Also, provide copy of any self-assessment of the Maintenance Rule program conducted.
11. List of Maintenance Preventable Functional Failures (MPFF) of risk significant systems.

Please include actions completed and current status.

12. List of corrective maintenance work orders, sorted by system and component, to include:

WO number, title or description, date of initiation, and date of completion (if completed).

13. Corrective action closeout packages, including NCRs with description of corrective actions, for all NRC findings and Licensee identified violations.
14. Corrective action closeout packages, including NCRs with description of corrective actions, for all licensee event reports (LERs) issued.
15. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.)

and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.,) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., NCR #) for the documents that evaluated the aforementioned OE information.

16. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the corrective action program. Also, any self-assessment of the site safety culture conducted should be provided.
17. Copies of all department self-assessments.
18. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends.
19. Copy of the latest Corrective Action Program statistics (if exists) such as the number of NCRs initiated by department, human performance errors by department, and others as may be available.
20. Copies of any minutes of meetings by the offsite safety review boards/groups. In addition, please provide a list of routine meetings involving the CAP to be held while team is onsite.
21. List of NCRs related to equipment aging issues in the top ten risk significant systems since April 1, 2005 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.;

environmental qualification). Please sort by NCR # with the following information: a)

NCR #, b) priority, and c) NCR title and short description.

Enclosure

3

22. If performed, provide the results from the latest safety culture survey.
23. Copies of corrective action program documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods.
24. List of all root cause evaluations with a brief description.
25. Copy of Probabilistic Risk Assessment importance measures report, if available.

B. Documents Needed during or after the Information Gathering Visit, but prior to the Inspection Preparation Week (March 29, 2010)

1. For the risk significant systems selected by the team leader during the information gathering visit, please provide copies of the latest System Health Reports, system design basis documents, system description information, and P&IDs.

Enclosure