MONTHYEARML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML23109A1862023-04-19019 April 2023 And Turkey Point – Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML22067A0922022-03-0303 March 2022 State Consultation - Duane Arnold ISFSI-Only EP License Amendment ML22040A1162022-02-0808 February 2022 Email to G. Van Noordennen Zion and La Crosse Review Schedule Changes ML22027A3582022-01-26026 January 2022 DAEC: CY2022 Inspection Plan, Docket No: 05000331, License No: DPR-49 ML22007A3102022-01-0505 January 2022 State Consultation - Draft No Significant Hazards Determination Regarding a LAR for NextEra Energy Duane Arnold, LLC, Duane Arnold Energy Center ISFSI in Palo, Iowa ML22005A0992022-01-0404 January 2022 Email from a Snyder to a Leek Re State Consultation - Draft No Significant Hazards Determination - License Amend. Req. for NextEra Energy, LLC, DAEC ISFSI in Palo, Iowa ML22005A0862022-01-0404 January 2022 1-4-2022 Email Communication to Duane Arnold Regarding Its ISFSI Related Exemption Request on Supplemental Information Needed ML22005A1012022-01-0404 January 2022 Email from a Leek to a Snyder Re State Consultation - Draft No Significant Hazards Determination - License Amend. Req. for NextEra Energy, LLC, DAEC ISFSI in Palo Iowa ML22004A0122022-01-0303 January 2022 E-mail from M. Davis, NextEra, to A. Snyder, NRC, - Duane Arnold Energy Center - Supplement Information to Technical Specification Amendment Application ML21354A6722021-12-17017 December 2021 Email to State of Iowa - Draft EA on Duane Arnold Exemption ML21214A0502021-08-0101 August 2021 Acceptance of License Amendment Request to Adopt an ISFSI-Only Physical Security Plan ML21214A0482021-08-0101 August 2021 Acceptance of License Amendment Request to Adopt an ISFSI-Only Emergency Plan ML21165A1212021-06-10010 June 2021 E-mail from M. Davis, Duane Arnold, to M. Doell and R. Edwards, NRC - Duane Arnold Defueled Emergency Plan Implementation Confirmation ML21117A2752021-04-26026 April 2021 Acceptance of Updated Spent Fuel Management Plan ML21089A2092021-03-19019 March 2021 Spent Fuel Pattern Procedure ML21068A3352021-03-0707 March 2021 Acceptance of License Amendment Request to Adopt ISFSI-Only Technical Specifications ML21056A2172021-02-17017 February 2021 Acceptance of License Amendment Request to Revise the Physical Security Plan Requirements ML21032A1852021-02-0101 February 2021 Daec_ CY2021 Inspection Plan ML21006A4052021-01-0606 January 2021 NRR E-mail Capture - Final RAI - Duane Arnold - Post-Shutdown Decommissioning Activities Report ML20338A0032020-12-0101 December 2020 Letter from EPRI to Mr. Scott Wall, BWRVIP 2020-100, 288 Surveillance Capsule Test Results Report ML20316A0212020-11-10010 November 2020 NRR E-mail Capture - Final RAI - Duane Arnold - Duane Arnold Amendment for Proposed Defueled EP and EAL Scheme ML20289A3522020-10-14014 October 2020 NRR E-mail Capture - Duane Arnold Energy Center -Acceptance of Requested Licensing Action, One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic (EPID No. L-2020-LLE-01 ML20153A3772020-05-28028 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center Quality Assurance Topical Report (FPL-3) - EPID L-2020-LLQ-0002) ML20154K6202020-05-27027 May 2020 COVID-19 Preparedness Assessments for FEMA Region VII Duane Arnold Energy Center (DAEC) and Quad Cities Generating Station (Qcgs) ML20141L8132020-05-19019 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center (DAEC) - Exemption Request for Security Training Requirements Due to COVID-19 Pandemic - EPID L-2020-LLE-0042 to 45, L-2020-LLE-0051 ML20129J8282020-05-0606 May 2020 NRR E-mail Capture - LIC-109 Acceptance Review of Duane Arnold Request for Exemption from Portions of 10 CFR 50.47 and Appendix E - EPID L-2020-LLE-0023 ML20127H8662020-05-0505 May 2020 NRR E-mail Capture - Duane Arnold Energy Center (DAEC) - Request for Additional Information (RAI) - Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 1O CFR 50.75(h)(1)(iv) - EPID L-2020-LLE-0011 ML20122A1152020-04-30030 April 2020 NRR E-mail Capture - Duane Arnold Energy Center -Acceptance of Post-Shutdown Decommissioning Activities Report ML20087F2872020-03-26026 March 2020 NRR E-mail Capture - LIC-109 Acceptance Review of Duane Arnold Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 1O CFR 50.75(h)(1)(iv) - EPID L-2020-LLE-0011 ML20129J8322020-03-19019 March 2020 NRR E-mail Capture - (External_Sender) Teleconference with Nextra Energy - Duane Arnold Physical Security Plan LIC-109 Review Status ML20022A3602020-01-22022 January 2020 NRR E-mail Capture - Duane Arnold Energy Center - Acceptance of Requested Licensing Action, Proposed Partial Exemption from Record Retention Requirements ML19352G6872019-12-11011 December 2019 12-11-19 Email to FEMA: Response to FEMA Questions on Proposed DAEC Emergency Plan ML19302G9732019-10-29029 October 2019 NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR- 186): Removal of License Condition 2.C.(3), Fire Protection Program - EPID L-2019-LLA-0211 ML19302G3212019-10-29029 October 2019 LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR- 186) - Removal of License Condition 2.C.(3), Fire Protection Program - EPID L-2019-LLA-0211 ML19280A0352019-10-0404 October 2019 NRR E-mail Capture - Final - RAI Related to License Amendment Request (TSCR-182) for Proposed Changes to the Emergency Plan for Permanently Defueled Conditions at Duane Arnold Energy Center (DAEC) - L-2019-LLA-0075 ML19206A2182019-07-25025 July 2019 NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-183) - Application to Revise Operating License and TS for Permanently Defueled Condition - EPID L-2019-LLA-0130 ML19183A0172019-06-26026 June 2019 NRR E-mail Capture - LIC-109 Acceptance of Request for Change in the BWRVIP Integrated Surveillance Program Test Schedule to Accommodate Early Closure of the Duane Arnold Energy Center - EPID L-2019-LRO-0042 ML19122A4882019-04-29029 April 2019 NRR E-mail Capture - LIC-109 Acceptance of License Amendment Request (TSCR-182) for Duane Arnold Energy Center (DAEC) - Proposed Changes to the Emergency Plan for Permanently Defueled Condition - EPID L-2019-LLA-0075 ML19086A3502019-03-27027 March 2019 NRR E-mail Capture - LIC-109 Acceptance of the Request for Exemption from 10 CFR 73.55(p)(1)(I) and 10 CFR 73.55(p)(1)(ii) for Duane Arnold Energy Center - EPID L-2019-LLE-0003 ML19064A2032019-03-0404 March 2019 NRR E-mail Capture - Results of LIC-109 Acceptance Review - Duane Arnold Energy Center - Request for Approval of Certified Fuel Handler Training Program, EPID L-2019-LLL-0003 ML18283B0522018-10-0909 October 2018 NRR E-mail Capture - Final Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18255A2922018-09-11011 September 2018 NRR E-mail Capture - Draft Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18166A2982018-06-15015 June 2018 NRR E-mail Capture - Draft Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18108A3102018-04-12012 April 2018 NRR E-mail Capture - Audit at NextEra Headquarters, Juno Beach, Florida - April 24, 2018 Through April 26, 2018 - 50.69 LARs for Duane Arnold Energy Center (Daec), and Point Beach Nuclear Plant (Pbnp), Units 1 and 2 - EPIDs L-2017-LLA-0283/ ML18088A0102018-03-28028 March 2018 NRR E-mail Capture - Final RAI for Duane Arnold (DAEC) 5th-10 Year ISI (RR-05) ML18037B0032018-02-0606 February 2018 NRR E-mail Capture - Draft Request for Additional Information - Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating - EPID L-2017-LLA-0288 ML18025A2362018-01-24024 January 2018 NRR E-mail Capture - Resent - LIC-109 Acceptance - Duane Arnold LAR (TSCR-166) - Adoption of Emergency Action Level (EAL) Scheme Pursuant to NEI 99-01, Revision 6, Development of EALs for Non-Passive Reactors ML18023A0752018-01-22022 January 2018 NRR E-mail Capture - LIC-109 Acceptance - Duane Arnold License Amendment Request (LAR) (TSCR-179) - Application to Add Technical Specification 3.2.3, Linear Heat Generation Rate - EPID: L-2017-LLA-0436 2024-09-04
[Table view] |
Text
From: Feintuch, Karl Sent: Tuesday, January 19, 2010 5:30 PM To: 'Doreen.Barta@nexteraenergy.com';
'Steve.Catron@nexteraenergy.com' Cc: Pittiglio, Clayton; Pascarelli, Robert; Feintuch, Karl
Subject:
ME1148 Request for Information (RAI) Number 1, Supplement 1 (resent)
Attachments: ME1148 (DAEC) RAI No 5 Supplement 1.doc This email was previously sent in error without a subject line. This resent email is identical except for the added subject line content.
From: Feintuch, Karl Sent: Tuesday, January 19, 2010 4:49 PM To: 'Doreen.Barta@nexteraenergy.com'; 'Steve.Catron@nexteraenergy.com' Cc: Pittiglio, Clayton; Pascarelli, Robert
Subject:
The Nuclear Regulatory Commission (NRC) staff has reviewed your letter NG-09-0038 dated February 19, 2009 and your response dated December 1, 2009 to an earlier Request for Additional Information (RAI), both pertaining to the Spent Fuel Management Program and Preliminary Decommissioning Cost Estimate, and requests some additional information (Supplemental 1 to RAI No. 5). Attached is a description of the needed information. The Supplemental RAI item (designated as RAI No 5, Supplement 1 is from our Financial Policy and Rulemaking Branch (PFPB). The reviewer from PFPB is Clayton (Larry) Pittiglio, who authored this item..
This item was discussed during a conference call on December 17, 2009. The NRC staff has decided to retain the draft RAI No. 5, Supplement 1 as the final version of the RAI, which is attached to this email.
Please feel free to contact me if you need further clarification of the final RAI item. A response is requested in 30 days (on or before February 19, 2010)
Karl Feintuch Project Manager USNRC 301-415-3079 E-mail Properties Mail Envelope Properties (26E42474DB238C408C94990815A02F0902189AA246)
Subject:
ME1148 Request for Information (RAI) Number 1, Supplement 1 (resent)
Sent Date: 1/19/2010 5:24:45 PM Received Date: 1/19/2010 5:30:00 PM
From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients:
Doreen.Barta@nexteraenergy.com ('Doreen.Barta@nexteraenergy.com')
Tracking Status: None Steve.Catron@nexteraenergy.com ('Steve.Catron@nexteraenergy.com')
Tracking Status: None Clayton.Pittiglio@nrc.gov (Pittiglio, Clayton)
Tracking Status: None Robert.Pascarelli@nrc.gov (Pascarelli, Robert)
Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 42144 1/19/2010 ME1148 (DAEC) RAI No 5 Supplement 1.doc 29446 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:
Attachment:
ME1148 (DAEC) RAI No 5 Supplement 1.doc RAI No. 5: Section 1.0 Executive Summary (NRCs November 9, 2009)
In the submittal, FPL identified 4 possible decommissioning scenarios for DAEC, and provided the total cost for each option, including spent fuel costs and Greenfield costs. Later in the cost study, FPL identified its annual costs associated with each option. However, FPL did not provide an analysis using the decommissioning funds to demonstrate that adequate funds are available to address these options. FPL needs to provide the supporting analysis for each of the identified alternatives or, at a minimum, for the selected option based on the trust fund balance as of December 31, 2008. NextERAs Response to NRCs RAI No. 5 was inadequate.
Supplemental RAI In NextEra Entergys December 1, 2009 (NG-09-0860) response to NRCs RAI No. 5 (above),
NextEra did not address the staff concerns. In their RAI response, NextEra refers to Table 1 and Table 2 as part of their response. For both Table 1 and Table 2, NextEra appears to be deducting more than the 3 percent for decommissioning planning. The regulation, 10 CFR 50.82(8)(i)(C)(ii), limits the withdrawal to 3 percent of the generic amount specified in 10 CFR 50.75 which would limit the amount to $ 15.1 million based on December 31, 2008 formula amount of $503.7 million, and $15.2 million based on September 30, 2009 formula amount of $507.3 million. The amount deduced: $7.9 million in 2012, $9.1 million in 2013, and part or all of $42.6 million depending on what is deducted prior to February 21, 2014, exceeds the 3 percent allowed ($17.0 to $59.6 million). NextEra needs to revise its submittal to reflect the regulatory limit allowed for decommissioning planning.
In addition, the NRCs RAI requested that both the spent fuel and decommissioning costs be addressed as NextEra submittal was in response to the 10 CFR 50.75 and 10 CFR 50.54(bb) requirements. The NextEras December 1, 2009 response only addressed decommissioning costs for the SAFSTOR option. Based on the current balances shown in both Table 1 and Table 2, DAEC does not have sufficient funds to address both the spent fuel management and decommissioning costs for either option. The remaining balances shown in Table 1 and Table 2 are significantly less than the $274.0 million, in 2008 dollars, that DAEC has estimated for spent fuel expenditures. NextERA needs to show how the spent fuel management costs will be addressed.
The NextEra December 1, 2009 response to RAI No. 5 refers to a $93 million dollar parent company guarantee (PCG) issued by Entergy on behalf of DAEC. The staffs review of FPL's annual report for 2008 did not locate any reference to the $93 million PCG mentioned in the response to RAI. No. 5. Provide a citation to the page in the annual report that discusses the PCG, or verify that the annual report does not include such a discussion. If there is no discussion of the PCG in the annual report, explain why the discussion was not included. In addition, the DAEC License Condition 2, Appendix B, page 2 of the Duane Arnold License, as amended in Amendment 275 (ML093030113 dated November 13, 2009) references a PCG of
$75 million (in 2005 dollars). Explain the reference to the $93.0 million PCG in the December 1, 2009, NextEras RAI response compared to the November 13, 2009 Amendment 275 that identifies a PCG in the amount of $75 million in 2005 dollars.