Renewal of the Crystal River Units 1, 2 and 3 - Industrial Wastewater Permit FL0000159
ML100210580
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/05/2009
From: Holt J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F1209-10
Download: ML100210580 (4)


Text

Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS Appendix B December 5, 2009 3F1209-10 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Renewal of the Crystal River Units 1, 2 and 3 Industrial Wastewater Permit FL00001 59

Dear Sir:

In accordance with the Environmental Protection Plan (Non-Radiological) Improved Technical Specifications (ITS) for Crystal River Unit 3 (CR-3), Section 3.2.4, Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby provides a copy of the National Pollutant Discharge Elimination System (NPDES) Permit Renewal application that was submitted to the Florida Department of Environmental Protection (FDEP).

The NPDES Permit encompasses Crystal River Units 1, 2 and 3, and is renewed every five (5) years. The Expiration Date for the current NPDES Permit is May 8, 2010.

No new regulatory commitments are made in this letter.

If you have any questions regarding this submittal, please contact Mr. Brandon Barr at (352) 563-4778.

Sincerely, es W. Holt apantSGeneral Manager Crystal River Nuclear Plant JWH/ff

Attachment:

Crystal River Units 1, 2 and 3 - NPDES Permit Renewal Application xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager QDZ_4 Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428

~

Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 December 5, 2009 3F1209-10 u.s. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ref: ITS Appendix B

Subject:

Crystal River Unit 3 - Renewal of the Crystal River Units 1, 2 and 3 Industrial Wastewater Permit FLOOOO 159

Dear Sir:

In accordance with the Environmental Protection Plan (Non-Radiological) Improved Technical Specifications (ITS) for Crystal River Unit 3 (CR-3), Section 3.2.4, Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby provides a copy of the National Pollutant Discharge Elimination System (NPDES) Permit Renewal application that was submitted to the Florida Department of Environmental Protection (FDEP).

The NPDES Permit encompasses Crystal River Units 1, 2 and 3, and is renewed every five (5) years. The Expiration Date for the current NPDES Permit is May 8, 2010.

No new regulatory commitments are made in this letter.

If you have any questions regarding this submittal, please contact Mr. Brandon Barr at (352) 563-4778.

Sincerely,

_ w. I-l-olt-es W. Holt lant General Manager Crystal River Nuclear Plant JWHlff

Attachment:

Crystal River Units 1, 2 and 3 - NPDES Permit Renewal Application xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428

I I

~t 1.

Progress Energy Florida, Inc.

Crystal River Units 1, 2, & 3 NPDES Permit Renewal Application NPDES Permit No. FL0000159 Submitted October 30, 2009 Progress Energy Florida, Inc.

Crystal River Units 1, 2, & 3 NPDES Permit Renewal Application NPDES Permit No. FL0000159 Submitted October 30, 2009

~Progress Energy Larry E. Hatcher Manager, Crystal River Fossil Plant & Fuel Operations October 28, 2009 Mr. Marc Harris, P.E.

Supervisor, Power Plant NPDES Permitting Industrial Wastewater Section Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400 Re:

Progress Energy Florida, Inc. -Crystal River Units 1, 2, & 3 NPDES Permit Renewal Application - FL0000159

Dear Mr. Harris:

Submitted for your review are three (3) copies of the completed application forms and supporting documentation for the renewal of the subject NPDES permit. An additional copy of the application has been sent to Yanisa Angulo, P.E. of the FDEP - Southwest District Office.

The application fee in the amount of $7,500.00 is also enclosed.

Please note that number of attachments are included as part of the permit renewal application package. Additionally, in order to reduce the amount of paper generated as part of the renewal, a compact disk (CD) has been included that contains copies of various reports cited in the attachments.

Finally, certain references are made to the NPDES permit modification request submitted September 11, 2009. We did not reproduce and include the permit modification material for this renewal. We respectfully request that you refer to that previous submittal for additional details regarding the new Helper Cooling Tower South (HCTS) project.

If you have any questions or require further information regarding this application, please contact Mr. Doug Yowell at (727) 820-5228.

Sincerely, g.

Larry E. Hatcher Manager, Crystal River Fossil Plant & Fuel Operations Enclosures Progress Energy Florida, Inc.

CERTlIPIE6iver Steam Plant 15760 W. Powerline Street CN77 Crystal River, FL 34428

  • ~

Progress Energy October 28, 2009 Mr. Marc Harris, P.E.

Supervisor, Power Plant NPDES Permitting Industrial Wastewater Section Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400 Larry E. Hatcher Manager, Crystal River Fossil Plant & Fuel Operations Re:

Progress Energy Florida, Inc. -Crystal River Units 1, 2, & 3 NPDES Permit Renewal Application - FL0000159

Dear Mr. Harris:

Submitted for your review are three (3) copies of the completed application forms and supporting documentation for the renewal of the subject NPDES permit. An additional copy of the application has been sent to Yanisa Angulo, P.E. of the FDEP - Southwest District Office.

The application fee in the amount of $7,500.00 is also enclosed.

Please note that number of attachments are included as part of the permit renewal application package. Additionally, in order to reduce the amount of paper generated as part of the renewal, a compact disk (CD) has been included that contains copies of various reports cited in the attachments.

Finally, certain references are made to the NPDES permit modification request submitted September 11, 2009. We did not reproduce and include the permit modification material for this renewal. We respectfully request that you refer to that previous submittal for additional details regarding the new Helper Cooling Tower South (HCTS) project.

If you have any questions or require further information regarding this application, please contact Mr. Doug Yowell at (727) 820-5228.

Sincerely, Larry E. Hatcher Manager, Crystal River Fossil Plant & Fuel Operations Enclosures Progress Energy Florida, Inc.

CERTIPlef!Y1iver Steam Plant 15760 W. Powerline Street CN77 Crystal River. FL 34428

xc: plant file point 12520-B-01 CERTIFIED MAIL: ARTICLE NO.: 7009 0080 0001 6934 3938 Address for SW District:

Ms. Yanisa Angulo, P.E.

Florida Department of Environmental Protection Southwest District Industrial Wastewater Program 13051 N. Telecom Parkway Temple Terrace, FL 33637 xc: plant file point 12520-8-01 CERTIFIED MAll.,: ARTICLE NO.: 70090080000169343938 Address for SW District:

Ms. Yanisa Angulo, P.E.

Florida Department of Environmental Protection Southwest District Industrial Wastewater Program 13051 N. Telecom Parkway Temple Terrace, FL 33637