ML100110195
| ML100110195 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 01/06/2010 |
| From: | Onge R Southern California Edison Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML100110195 (1) | |
Text
J SOUTHERN CALIFORNIA EDISON An EDISON INTERNATIONAL Company Richard I. St. Onge Director Nuclear Regulatory Affairs 10 CFR 50.54(p)
January 6, 2010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Docket Nos. 50-361, 50-362 and 72-41 San Onofre Nuclear Generating Station, Units 2 and 3, and Independent Spent Fuel Storage Installation
Dear Sir or Madam:
Southern California Edison (SCE) has made changes to the Physical Security Plan for the San Onofre Nuclear Generating Station (SONGS) that SCE has determined do not decrease the safeguards effectiveness of these plans.
In accordance with 10 CFR 50.54(p)(2), a report containing a description of these changes is enclosed for your information and a record of the changes has been made and is available for inspection at SONGS.
Note that the enclosure to this letter contains safeguards information. This letter may be decontrolled upon separation from its enclosures.
If you have any questions regarding this matter, please contact Mr. S. D. Root at (949) 368-6480.
Sincerely, Enclosure (SGI) cc:
E. E. Collins, Regional Administrator, NRC Region IV R. Hall, NRC Project Manager, San Onofre Units 2 & 3 S. Helton, NRC Project Manager, San Onofre ISFSI G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 & 3 SAFEGUARDS INFORMATION Notice: Decontrolled upon separation from the enclosure.
P.O. Box 128 San Clemente, CA 92674
- 'S'c)