Email Acceptance Review Consolidated Line Item Improvement Process (CLIIP) to Adopt TSTF-427 to Add Limiting Condition for Operation 3.0.9
ML100040434
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 01/04/2010
From: V Sreenivas
Plant Licensing Branch II
To: Heacock D
Dominion
Sreenivas V.NRR/DORL/LPL2-1 415-2597
References
TAC ME2953, TAC ME2954, TSTF-427
Download: ML100040434 (2)


Text

From: Sreenivas, V Sent: Monday, January 04, 2010 2:17 PM To: 'david.heacock@dom.com' Cc: 'Tom.Shaub@dom.com'; 'david.sommers@dom.com'; Kulesa, Gloria; Cotton, Karen; Reece, James; McCoy, Gerald

Subject:

NORTH ANNA 1 AND 2-ACCEPTANCE REVIEW, Consolidated Line Item Improvement process (CLIIP) to Adopt TSTF-427 to Add Limiting Condition for Operation 3.0.9 By letter dated December 16, 2009, Virginia Electric and Power Company submitted license amendment request for Consolidated Line Item Improvement Process (CLIIP) to Adopt Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-427 by adding Limiting Condition for Operation (LCO) 3.0.9 for North Anna Power Station, Unit 1 and 2. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed exemption request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

V. Sreenivas, PH.D., C.P.M.,

Project Manager, LPL2-1, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation The image cannot be display ed. Your computer may not hav e enough memory to open the image, or the image may hav e been corrupted. Restart y our computer, and then open the file again. If the red x still appears, y ou may hav e to delete the image and then insert it again.

E-mail Properties Mail Envelope Properties (AF843158D8D87443918BD3AA953ABF780A4036FD53)

Subject:

NORTH ANNA 1 AND 2-ACCEPTANCE REVIEW, Consolidated Line Item Improvement process (CLIIP) to Adopt TSTF-427 to Add Limiting Condition for Operation 3.0.9 Sent Date: 1/4/2010 2:17:26 PM

Received Date: 1/4/2010 2:17:00 PM From: Sreenivas, V Created By: V.Sreenivas@nrc.gov Recipients:

david.heacock@dom.com ('david.heacock@dom.com')

Tracking Status: None

'Tom.Shaub@dom.com' ('Tom.Shaub@dom.com')

Tracking Status: None david.sommers@dom.com ('david.sommers@dom.com')

Tracking Status: None Gloria.Kulesa@nrc.gov (Kulesa, Gloria)

Tracking Status: None Karen.Cotton@nrc.gov (Cotton, Karen)

Tracking Status: None James.Reece@nrc.gov (Reece, James)

Tracking Status: None Gerald.McCoy@nrc.gov (McCoy, Gerald)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 17005 1/4/2010 image001.jpg 1981 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: