Category:Environmental Assessment
MONTHYEARML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24089A1132024-06-21021 June 2024 Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML21246A2802021-09-29029 September 2021 Final Ea/Fonsi for TVAs Initial and Updated Triennial Decommissioning Funding Plans for Sequoyah Nuclear Plant ISFSIs ML0935706452010-01-13013 January 2010 FRN: General Notice. Sequoyah Nuclear Plant, Units 1 and 2 - Environmental Assessment and Finding of No Significant Impact ML0935706372010-01-13013 January 2010 Environmental Assessment and Finding of No Significant Impact ML0415501832004-06-0303 June 2004 Environment Assessment Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation ML0415303682004-05-28028 May 2004 EA and Finding of No Significant Impact ML0320403052003-07-23023 July 2003 Environmental Assessment, Related to One of Two Exemptions Dated September 6, 2002, as Supplemented by Letter Dated December 19, 2002 ML0226006932002-09-17017 September 2002 Environmental Assessment, Incore Irradiation of Tritium-Producing Burnable Absorber 2024-06-21
[Table view] Category:Federal Register Notice
MONTHYEARML24172A1392024-07-16016 July 2024 Exemption from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - FRN ML24089A1132024-06-21021 June 2024 Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24130A0012024-05-16016 May 2024 April 2024, Issuance of Multiple Exemptions Regarding Security Notifications, Reports, and Recording Keeping ML24114A3102024-05-0303 May 2024 Monthly (28-Day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 14, 2024 ML24086A4312024-04-0505 April 2024 Monthly (28-day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: April 16, 2024 ML21166A1142021-10-28028 October 2021 Federal Register Notice for Exemption from 10 CFR 50.46 and Appendix K ML21299A0102021-10-26026 October 2021 Public Notice - Exigent Amendment (EPID LL-2021-LLA-0194) ML21299A0092021-10-26026 October 2021 Notice Letter to TVA - Exigent Amendment ML20335A0902020-12-21021 December 2020 Federal Register Notice - November 2020 COVID-19 Exemptions ML20143A2722020-05-28028 May 2020 Resolution of Issues Pertaining to Boric Acid Precipitation Related to the Closeout of Generic Letter, 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML20098D3312020-05-0505 May 2020 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures: May 5, ML20035C4082020-02-18018 February 2020 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 02/25/2020 ML19140A4562019-05-28028 May 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 06/04/2019 ML19085A2172019-03-29029 March 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 04/09/2019 ML18200A1922018-08-21021 August 2018 Withdrawal of Amd Request to Change Implementation Date for Emergency Action Level Scheme ML18200A2142018-08-21021 August 2018 FRN; Tennessee Valley Authority, Browns Ferry Nuclear Plant Units 1, 2 and 3, Sequoyah Nuclear Plant, Units 1 and 2, Watts Bar Nuclear Plant, Units 1 and 2 NRC-2014-0045, FRN; Tennessee Valley Authority, Browns Ferry Nuclear Plant Units 1, 2 and 3, Sequoyah Nuclear Plant, Units 1 and 2, Watts Bar Nuclear Plant, Units 1 and 22018-08-21021 August 2018 FRN; Tennessee Valley Authority, Browns Ferry Nuclear Plant Units 1, 2 and 3, Sequoyah Nuclear Plant, Units 1 and 2, Watts Bar Nuclear Plant, Units 1 and 2 ML18173A1792018-08-0707 August 2018 OEDO-17-00070 - Notice of Issuance of Director'S Decision, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Japan C NRC-2018-0140, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/20182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 ML18180A2182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 ML18173A0532018-06-22022 June 2018 Ind. Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Sig. Hazards ... ML18172A3042018-06-22022 June 2018 Tennessee Valley Authority - License Amendment Application; Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene ML17200A0652017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement FRN, Paul Gunter, Beyond Nuclear, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and ML17198A3292017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement Letter, Paul Gunter, Beyond Nuclear, Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Jap ML16208A5692016-09-0909 September 2016 Exemption from the Requirements of 10 CFR Part 50, Section 50.75(h)(2) and 10 CFR 50382(a)(8) NRC-2016-0199, FRN: Exemption; Issuance. Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 22016-09-0909 September 2016 FRN: Exemption; Issuance. Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2 ML16208A5902016-09-0909 September 2016 FRN: Exemption; Issuance. Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2 ML16154A0852016-07-0101 July 2016 Federal Register Notice on Sequoyah Nuclear Plant, Units 1 and 2 - Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing on Completion Date of Cyber Security Plan Implementatio NRC-2016-0130, Federal Register Notice on Sequoyah Nuclear Plant, Units 1 and 2 - Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing on Completion Date of Cyber Security Plan Implemen2016-07-0101 July 2016 Federal Register Notice on Sequoyah Nuclear Plant, Units 1 and 2 - Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing on Completion Date of Cyber Security Plan Implementatio ML16154A0812016-06-24024 June 2016 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing ML15098A0162015-09-28028 September 2015 Notice of Issuace of Renewed Facility Operating Licenses Nos.Dpr-77 and Dpr-79 for an Additional 20-year Period ML13018A2392015-04-0808 April 2015 G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 ML15051A4892015-03-19019 March 2015 FRN for Sequoyah Nuclear Plant, Units 1 & 2, FSEIS Rev. 1 ML14281A5842014-10-24024 October 2014 Federal Register Notice Regarding the ACRS Plant License Renewal (Sequoyah), November 5, 2014 ML14198A6102014-08-0101 August 2014 License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2 - FRN NRC-2013-0003, License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2 - FRN2014-08-0101 August 2014 License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2 - FRN ML14051A6712014-03-0404 March 2014 FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 NRC-2014-0037, FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 20142014-03-0404 March 2014 FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 ML13228A3992013-08-12012 August 2013 Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13035A2142013-02-26026 February 2013 Determination of Accepting & Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Application from Tennessee Valley Authority for Renewal of the Operating Licenses for Sequoyah Nuclear Plant, Unit ML13043A2032013-02-25025 February 2013 Acceptability of LRA for Sequoyah Units 1 and 2 - FRN (Enclosure 2) ML13016A4892013-02-0808 February 2013 Letter - Receipt and Availability of the LRA for the Sequoyah Nuclear Plant Units 1 and 2 ML12194A5012012-07-13013 July 2012 7-24 Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations ML12165A6932012-06-27027 June 2012 Federal Register Notice - Notice of Withdrawal of an Amendment NRC-2012-0160, Federal Register Notice - Notice of Withdrawal of an Amendment2012-06-27027 June 2012 Federal Register Notice - Notice of Withdrawal of an Amendment ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML11339A0802011-12-27027 December 2011 G20110262/EDATS: OEDO-2011-0269 - Federal Register Notice - Receipt of Request for Action Under 10 CFR 2.206 2024-07-16
[Table view] Category:Letter
MONTHYEARML24304A8492024-10-31031 October 2024 December 2024 Requalification Inspection Notification Letter IR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 ML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 2024-09-08
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 13, 2010 Mr. R. M. Krich Vice President, Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 - ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT (TAC NOS. ME2599 AND ME2600)
Dear Mr. Krich:
Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to your application for exemption dated November 6, 2009, as supplemented by letter dated January 11, 2010. Portions of the November 6, 2009, submittal contain safeguards and security sensitive information and, therefore, are not available to the public. The proposed exemption from the specific requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 73, for the Sequoyah Nuclear Plant, Units 1 and 2, would extend the deadline from March 31, 2010, until September 24, 2012, for the implementation of certain measures in 10 CFR Part 73.
The assessment is being forwarded to the Office of the Federal Register for publication.
Sincerely, s-~ (f' ~
Siva P. Lingarn, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328
Enclosure:
Environmental Assessment cc w/encl: Distribution via Listserv
7590-01-P NUCLEAR REGULATORY COMMISSION TENNESSEE VALLEY AUTHORITY DOCKET NOS. 50-327 AND 50-328 SEOUOYAH NUCLEAR PLANT, UNITS 1 AND 2 ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an Exemption, pursuant to Title 10 olthe Code of Federal Regulations (10 CFR) Section 73.5, "Specific exemptions," from the implementation date for certain new requirements of 10 CFR Part 73, "Physical protection of plants and materials," for Facility Operating License Nos. DPR 77 and DPR-79, issued to Tennessee Valley Authority (TVA, the licensee), for operation of the Sequoyah Nuclear Plant, Units 1 and 2 (SON), located in Hamilton County, Tennessee. In accordance with 10 CFR 51.21, "Criteria for and identification of licensing and regulatory actions requiring environmental assessments," the NRC prepared an environmental assessment documenting its finding. The NRC concluded that the proposed action will have no significant environmental impact.
ENVIRONMENTAL ASSESSMENT Identification of the Proposed Action:
The proposed action would exempt the TVA from the required implementation date of March 31, 2010, for several new requirements of 10 CFR Part 73. Specifically, SON would be granted an exemption from being in full compliance with certain new requirements contained in 10 CFR 73.55. "Requirements for physical protection of licensed activities in nuclear power reactors against radiological sabotage," by the March 31, 2010, deadline (74 FR 13935,
-2 March 27,2009). TVA has proposed an alternate full compliance implementation date of September 24, 2012, approximately two and half years beyond the date required by 10 CFR Part 73. The proposed action, an extension of the schedule for completion of certain actions required by the revised 10 CFR Part 73, does not involve any physical changes to the reactor, fuel, plant structures, support structures, water, or land at the SON site that were not previously considered in the environmental assessment and finding of no significant impact made by the Commission in promulgating its revisions to 10 CFR Part 73, Power Reactor Security Requirements, 74 FR 13926, 13967 (March 27, 2009).
The proposed action is in accordance with the licensee's application dated November 6, 2009, as supplemented by letter dated January 11, 2010.
The Need for the Proposed Action:
The proposed action is needed to provide the licensee with additional time to perform the required upgrades to the SON security system because they involve new components and engineering that cannot be obtained or completed by the March 31, 2010, implementation date.
Environmental Impacts of the Proposed Action:
The NRC has completed its environmental assessment of the proposed exemption. The staff has concluded that the proposed action to extend the implementation deadline would not significantly affect plant safety and would not have a significant adverse effect on the probability of an accident occurring.
The proposed action would not result in an increased radiological hazard beyond those previously analyzed in the environmental assessment and finding of no significant impact made by the Commission in promulgating its revisions to 10 CFR Part 73 (74 FR 13967). There will be no change to radioactive effluents that affect radiation exposures to plant workers and
-3 members of the public. Therefore, no changes or different types of radiological impacts are expected as a result of the proposed exemption.
The proposed action does not result in changes to land use or water use, or result in changes to the quality or quantity of non-radiological effluents. No changes to the National Pollution Discharge Elimination System permit are needed. No effects on the aquatic or terrestrial habitat in the vicinity of the plant, or to threatened, endangered, or protected species under the Endangered Species Act, or impacts to essential fish habitat covered by the Magnuson-Steven's Act are expected. There are no impacts to the air or ambient air quality.
There are no impacts to historical and cultural resources. There would be no impact to socioeconomic resources. Therefore, no changes to or different types of non-radiological environmental impacts are expected as a result of the proposed exemption.
Accordingly, the NRC concludes that there are no significant environmental impacts associated with the proposed action.
The licensee currently maintains a security system acceptable to the NRC and will continue to provide acceptable physical protection of SON as TVA implements certain new requirements in 10 CFR Part 73. Therefore, the extension of the implementation date of the new requirements of 10 CFR Part 73 to September 24, 2012, would not have any significant environmental impacts.
The NRC staff's safety evaluation will be provided in the exemption that will be issued as part of the letter to the licensee approving the exemption to the regulation, if granted.
Environmental Impacts of the Alternatives to the Proposed Action:
As an alternative to the proposed action, the NRC staff considered denial of the proposed action (i.e., the "no-action" alternative). Denial of the exemption request would result in no change in current environmental impacts. If the proposed action was denied, the licensee
-4 would have to comply with the March 31, 2010, implementation deadline. The environmental impacts of the proposed exemption and the "no action" alternative are similar.
Alternative Use of Resources:
The action does not involve the use of any different resources than those considered in the Final Environmental Statement for SON dated February 13, 1974.
Agencies and Persons Consulted:
In accordance with its stated policy, on December 22, 2009, the NRC staff consulted with the Tennessee State official, Elizabeth Flannagan of the Tennessee Bureau of Radiological Health, regarding the environmental impact of the proposed action. The State official had no comments.
FINDING OF NO SIGNIFICANT IMPACT On the basis of the environmental assessment, the NRC concludes that the proposed action will not have a significant effect on the quality of the human environment. Accordingly, the NRC has determined not to prepare an environmental impact statement for the proposed action.
For further details with respect to the proposed action, see the licensee's letter dated November 6, 2009, as supplemented by letter dated January 11, 2010. Portions of the November 6, 2009, submittal contain safeguards and security sensitive information and, accordingly, are not available to the public. Other parts of these documents may be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at One White Flint North, Public File Area 0-1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland 20852.
Publicly available records will be accessible electronically from the Agencywide Document Access and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Website: http://www.nrc.gov/reading-rm/adams.html.
-5 Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209 or 301-415-4737, or send an e-mail to pdr.resource@nrc.gov.
Dated at Rockville, Maryland, this 13th. day of January 2010.
FOR THE NUCLEAR REGULATORY COMMISSION
~<r'~
Siva P. Lingam, Project Manager Plant Licensing Branch LPL2-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
January 13, 2010 Mr. R. M. Krich Vice President, Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 - ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT (TAC NOS. ME2599 AND ME2600)
Dear Mr. Krich:
Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to your application for exemption dated November 6, 2009, as supplemented by letter dated January 11, 2010. Portions of the November 6, 2009, submittal contain safeguards and security sensitive information and, therefore, are not available to the public. The proposed exemption from the specific requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 73, for the Sequoyah Nuclear Plant, Units 1 and 2, would extend the deadline from March 31,2010, until September 24,2012, for the implementation of certain measures in 10 CFR Part 73.
The assessment is being forwarded to the Office of the Federal Register for publication.
Sincerely, IRA!
Siva P. Lingam, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328
Enclosure:
Environmental Assessment cc w/encl: Distribution via Listserv DISTRI BUTION:
PUBLIC RidsNrrLACSola Resource LPL2-2 R/F RidsNrrPMSequoyah Resource RidsAcrsAcnw MailCTR Resource SKlementowicz RidsNrrDlrRerb Resource RidsOgcRp Resource RidsNrrDlrReba Resour'ce RidsRgn2MailCenter Resource RidsNrrDlrRebb Resource RidsNrrDorlLpl2-2 Resource ADAMS Accession Nos Letter' ML093570637 EA FRN' ML093570645 OFFICE LPL2-2/PM LPL2-2/LA NRR/ RERB/BC OGC DORL/LPL2-2/BC CBoote NAME SLingam CSoia Almboden NLO w/comments TBoyce DATE 01/13/10 01/10/10 12/27/09 1/6/10 01/13/10 OFFICIAL RECORD COpy