ML093430108

From kanterella
Jump to navigation Jump to search
Initial Exam 2009-302 General Correspondence
ML093430108
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/07/2009
From:
NRC/RGN-II/DRS/OLB
To:
Southern Nuclear Operating Co
References
50-321/09-302, 50-366/09-302
Download: ML093430108 (4)


Text

FACILITY NAME: _....;..H.;.;..A~T....;;;C;..;;..H=----_ _ _ _ _ _ _ _ __

_.....;.H.;.;;..A~T~C~H.=.....- Section 14 REPORT NUMBER: 05000321/2009302 AND 05000366/2009302 GENERAL CORRESPONDENCE MISCELLANEOUS DOCUMENTS CONTENTS:

Items that do not directly pertain to the exam package IA W ES-501 that are required to be entered into ADAMS and any other documents that are wanted to be entered into ADAMS that are not required by ES-501.

, d ~

Submitted By: Bruno Caballero Verified By:1tlJ VerifiedBy:111J 1.

D. R. Madison (Dennis) Southern Nuclear Vice President - Hatch Operating Company, Inc.

Plant Edwin I. Hatch 11028 Hatch Parkway, North Baxley, Georgia 31513 Tel 912537.5859 Fax 912.366.2077

.S(OUTtIERN SOUTHERN'\'

COMPANY

COlt'PAJW sM October 15, 2009 LR-PM-004-1009 Energy to Serve Your World sM Mr. Bruno Caballero NRC Chief Examiner U. S. Nuclear Regulatory Commission Region II Sam Nunn - Atlanta Federal Center 61 Forsyth Street Suite 24T131 Atlanta, Ga. 30303

Subject:

Transmittal of 2009-302 Final RO/SRO Operating Examinations

Dear Mr. Caballero:

As required by NUREG 1021, "Operator Licensing Examination Standards", Revision 9 Supp. 1, form ES-201-1, "Examination Preparation Checklist", issued for Plant E. I. Hatch's upcoming Initial Operator

( Licensing Exam (2009-302), enclosed are the following forms and items:

1 - ES-201-2, Examination Outline Quality Checklist 1 - ES-201-3, Examination Security Agreement 1 - ES-301-1, Administrative Topics Outline Form 1 - ES-301-2, Control Roomlln-Plant RoomlIn-Plant Systems Outline 1 - ES-301-3, Operating Test Quality Checklist 2 - ES-301-4, Simulator Scenario Quality Checklist 2 - ES-301-5, Transient and Event Checklist 1 - ES-301-6, Competencies Checklist 4 - ES-D-IIES-D-2, ES-D-lIES-D-2, Scenario Outlines and Scenarios 18 - Job Performance Measures (JPMs) 1 - Computer DVD containing the Draft Written and Final Operating exams As you know these documents are confidential and should not be released to the public until after our License Exam has been administered.

If you have any questions regarding this material, Please contact Charlie Edmund at (912) 366-2000, ext 3773 or Anthony Ball at (912) 366-2000, ext 3772.

Sincerely,

( WL (~- (~-.(2;t 4;)

Dennis R. Madison () R.. VLt f"/ ~

Vice President Nuclear Plant Site

Dennis R. Madison Southern Nuclear Vice President - Hatch Operating Company, Inc.

Plant Edwin I. Hatch 11028 Hatch Parkway North Baxley, Georgia 31513 Tel 912.537.5859 Fax 912.366.2077 SOUIHERN'\

SOUTHERN COMPANY September 09, 2009 LR-PM -002-0909 LR*PM*002*0909 Mr. Bruno Caballero NRC Chief Examiner U. S. Nuclear Regulatory Commission Region IIIT Sam Nunn - Atlanta Federal Center 61 Forsyth Street Suite 24T131 Atlanta, Ga. 30303

Subject:

Transmittal of 2009-302 Draft RO/SRO Operating and Written Examinations

Dear Mr. Caballero:

As required by NUREG 1021, "Operator Licensing Examination Standards", Revision 9 Supp. 1, form ES-201-1, "Examination Preparation Checklist", issued for Plant E. I. Hatch's upcoming Initial Operator

( Licensing Exam (2009-302), enclosed are the following forms and items:

1 - ES-201-2, Examination Outline Quality Checklist 1 - ES-201-3, Examination Security Agreement 1 - ES-301-1, Administrative Topics Outline Form 1 - ES-301-2, Control RoomlIn-Plant Systems Outline 1 - ES-301-3, Operating Test Quality Checklist 2 - ES-301-4, Simulator Scenario Quality Checklist 2 - ES-301-5, Transient and Event Checklist 1 - ES-301-6, Competencies Checklist 1 - ES-401-6, Written Examination Quality Checklist 5 - ES-D-IIES-D-2, Scenario Outlines and Scenarios 1 - Draft SRO/RO SROIRO Written Exam (100 questions) 18 - Job Performance Measures (JPMs) 1 - Computer DVD containing the Written and Operating exams As you know these documents are confidential and should not be released to the public until after our License Exam has been administered.

If you have any questions regarding this material, Please contact Charlie Edmund at (912) 366-2000, ext 3773 or Anthony Ball at (912) 366-2000, ext 3772.

Sincerely,

~~~~

e~ad~~

i>eu'cis R. Madison Vice President Nuclear Plant'Site Plant Site

ft Madison Dermis It Southern Nuciear Vice President - Hatch Operating Company, Inc.

Plant Edwin I. Hatch 11028 Hatch Parkway North Baxley, Georgia 31513 Tel 912.537.5859 Fax 912.366.2077 SOUTHERN COMPANY' 13, 2009 July 13,2009 LR-PM-003-0709 Mr. Bruno Caballero NRC Chief Examiner U. S. Nuclear Regulatory Commission Region II Sam Nunn - Atlanta Federal Center 61 Forsyth Street Suite 24T131 Atlanta, Ga. 30303

Subject:

Transmittal of Draft RO/SRO Operating Examination Outlines and Plant Reference Material

Dear Mr. Caballero:

As required by NUREG 1021, "Operator Licensing Examination Standards", Revision 9 Supp. 1, form ES-201-1, "Examination Preparation Checklist", issued for Plant E. 1. Hatch's upcoming Initial Operator Licensing Exam, enclosed are the following forms and items:

1-1 - ES-201-2, Examination Outline Quality Checklist 1 - ES-201-3, Examination Security Agreement 1-1 - ES-301-1, Administrative Topics Outline Form 1 - ES-301-2, Control Room/In-Plant Systems Outline 1 - ES-301-5, Transient and Event Checklist 5 - ES-D1-1, Scenario Outlines 1 - Computer DVD containing Plant Reference Material D VD containing the operating exams outline 1 - Computer DVD As you know these documents are confidential and should not be released to the public until after our License Exam has been administered.

If you have any questions regarding this material, Please contact Charlie Edmund at (912) 366-2000, ext 3773 or Anthony Ball at (912) 366-2000, ext 3772.

Sincerely,

£)/h#~Y/}~

£)/h#£>>7~

Dennis R. Madison Vice President Nuclear Plant Site

(