MONTHYEARML24008A1592024-01-18018 January 2024 Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML23304A0682023-11-0606 November 2023 Summary of October 24, 2023, Public Mtg W/Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, and Sequoyah Nuclear Plant, Units 1 and 2 to Revise Function 5, Turbine Trip and F ML23265A1512023-09-28028 September 2023 Summary of September 12, 2023, Partially Closed Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request ML23198A3102023-07-20020 July 2023 July 10, 2023, Summary of Public Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML23068A1532023-03-16016 March 2023 Summary of February 22, 2023, Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request to Increase Allowable Number of Tritium Producing Burnable Absorber Rods at Watts Bar Nuclear Plant, Units 1 and 2 ML23055A4562023-03-0909 March 2023 Summary of February 15, 2023, Public Meeting with Tennessee Valley Authority Regarding Proposed Expedited License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML22329A1382022-12-0505 December 2022 Summary of Meeting with Tennessee Valley Authority Related to Planned Alternative Request WBN-2-ISI-01 for Watts Bar Nuclear Plant, Unit 2 ML22168A1642022-06-27027 June 2022 Summary of June 9, 2022, Meeting with TVA Regarding a Proposed License Amendment Request Related to Low Temperature Overpressure System and Cold Overpressure Mitigation System for Sequoyah and Watts Bar Nuclear Plants ML22109A0042022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Alternative Request Related to Testing of the Motor-Driven Auxiliary Feedwater Pumps at Sequoyah and Watts Bar Nuclear Plants ML22104A2252022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 2 ML22108A1842022-04-18018 April 2022 TVA 2021 Annual Assessment Public Meeting Summary ML22042B3262022-02-14014 February 2022 Summary of February 8, 2022, Meeting with Tennessee Valley Authority Regarding a Proposed License Amendment Request to Revise the Allowable Value for Trip of Turbine-Driven Main Feedwater Pump at Watts Bar Nuclear Plant, Unit 1 ML22025A3112022-02-0909 February 2022 Summary of January 19, 2022, Meeting with Tennessee Valley Authority Regarding a Proposed Schedule for Development of a License Amendment Request for Increased Tritium Production ML21349A3642022-01-0404 January 2022 Summary of December 14, 2021, Teleconference with Tennessee Valley Authority Regarding a Proposed Change to the Capsule Withdrawal Schedule for Watts Bar Nuclear Plant, Unit 2 ML21279A0902021-11-0303 November 2021 Summary of Conference Calls Regarding the Fall 2021, Mid-Cycle Steam Generator Tube Inspections ML21291A0092021-11-0303 November 2021 Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme ML21245A4252021-09-15015 September 2021 Summary of August 19, 2021, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to the Watts Bar Nuclear Plant, Units 1 and 2 ML21253A0872021-09-15015 September 2021 Summary of August 19, 2021, Partially Closed Meeting with Tennessee Valley Authority to Discuss Mid-Cycle Outage Contingencies for Watts Bar Nuclear Plant, Unit 2 ML21165A1482021-06-30030 June 2021 Summary of Closed Meeting with Tennessee Valley Authority to Discuss Planned Requests for Exemption from Certain Requirements of 10 CFR Part 37 ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML21120A2192021-05-0404 May 2021 April 28,2021, Summary of Meeting with Tennessee Valley Authority Related to a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Remove from Technical Specifications Redundant Units of Measurement for Control ML21099A2072021-04-13013 April 2021 Summary of April 7, 2021, Meeting with Tennessee Valley Authority Related to a Planned Relief Request from ASME Code Testing Requirements ML21060B0532021-03-0303 March 2021 Summary of February 11, 2021, Meeting with Tennessee Valley Authority Related to a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2, to Apply a Temperature Adjusted Steam Generator Tube Flaw Growth Rate Methodology ML21033A5952021-02-23023 February 2021 Summary of Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Requests Related to the Watts Bar Nuclear Plant, Unit 2 Steam Generator Replacement ML20357A0092021-01-19019 January 2021 Summary of December 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to Use of Alternate Probability of Detection at Watts Bar Nuclear Plant, Unit 2 ML20351A4212021-01-19019 January 2021 Summary of Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Requests Related to the Watts Bar, Unit 2, Steam Generator Replacement ML20351A2192021-01-11011 January 2021 Summary of Conference Calls Regarding the Fall 2020 Steam Generator Tube Inspections ML20337A0402020-12-15015 December 2020 Summary of November 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request for Technical Specification 5.9.9, Steam Generator Tube Inspection Report ML20323A0662020-11-27027 November 2020 Summary of October 28, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request for Technical Specification Surveillance Requirement 3.6.15.4, Shield Building ML20244A1892020-09-11011 September 2020 Summary of Teleconference Call with Tennessee Valley Authority Regarding a Proposed Change to the Containment Leakage Rate Testing Program ML20213C7112020-08-25025 August 2020 Summary of July 28, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned Alternative Request for Watts Bar Nuclear Plant, Unit 1 ML20233A8352020-08-25025 August 2020 Summary of August 11, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML20175A8012020-08-11011 August 2020 Summary of June 23, 2020, Public Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20211L8222020-08-10010 August 2020 Summary of Teleconference Call with the Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 1 ML20150A4162020-06-24024 June 2020 Summary of May 28, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 1 ML20153A3622020-06-22022 June 2020 Summary of May 27, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML20143A1692020-05-28028 May 2020 Summary of May 14, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2 ML20135H2702020-05-28028 May 2020 Summary of May 5, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML20034F5232020-02-12012 February 2020 Summary of Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML19347D1592020-01-0707 January 2020 Summary of December 12, 2019, Meeting with Northern States Power Co., Doing Business as Xcel Energy, and Tennessee Valley Authority Planned License Amendment Requests for Prairie Island, Units 2 and 2, and Watts Bar, Units 1 and 2 ML19296B6642019-11-0707 November 2019 Summary of Pre-Application Meeting with TVA Regarding a Planned License Amendment Request to Revise Technical Specification 3.6.15 Condition B and Surveillance Requirement 3.6.15.1 at Watts Bar Nuclear Plant ML19301A4762019-11-0707 November 2019 Summary of Pre-Application Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request to Remove Technical Specification Requirement to Surveil Automatic Transfer (EPID L-2019-LRM-0038 ML19294A3082019-10-28028 October 2019 Summary of July 18, 2019, Pre-Application Meeting with Tennessee Valley Authority Planned License Amendment Request for Approval to Implement a Measurement Uncertainty Recapture Power Uprate ML19284A3532019-10-28028 October 2019 Summary of October 10, 2019, Meeting with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML19253A6732019-09-17017 September 2019 Summary of Closed Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment for Watts Bar Nuclear Plant, Units 1 and 2 ML19255H5522019-09-12012 September 2019 August 27, 2019, Summary of Public Meeting - Tennessee Valley Safety Conscious Work Environment Update at Watts Bar, Docket 50-390 and 50-391 ML19235A2862019-09-0303 September 2019 Summary of Meeting with Tennessee Valley Authority Regarding Request to Adopt Technical Specifications Task Force Traveler TSTF-500 at Watts Bar, Units 1 and 2 ML19218A2282019-08-15015 August 2019 Summary of July 1, 2019, Pre-Application Meeting with TVA Regarding Planned License Amendment Request to Implement Full Spectrum Loss-of-Coolant Accident Evaluation Methodology 2024-01-18
[Table view] |
Text
December 3, 2009 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 1.
SUBJECT:
SUMMARY
OF DECEMBER 1, 2009, PRE-APPLICATION MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING PROPOSED ALLOWED OUTAGE TIME ONE-TIME EXTENSION FOR THE CHILLER UPGRADE PROJECT AT WATTS BAR NUCLEAR PLANT, UNIT 1 On December 1, 2009, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the TVAs pre-application proposed allowed outage time (AOT) one-time extension amendment request for a chiller upgrade project at Watts Bar Nuclear Plant (WBN), Unit 1.
A list of attendees is provided in Enclosure 1 and TVA=s handouts provided at the meeting are included in Enclosure 2.
TVA gave a brief presentation including introductions, purpose of the pre-application meeting, the reason for the need for a chiller upgrade project, the plan for accomplishing the chiller upgrade project, and the proposed schedule for the chiller upgrade project.
TVA needs to replace the Train-A and Train-B Main Control Room (MCR) chillers and the Shutdown Board Room (SDBR) chillers due to Executive Order 13148 that requires all Federal Agencies to phase out procurement of Class 1 ozone-depleting refrigerants by December 31, 2010 (R-11 used in SDBR Chillers) and Clean Air Act requires production of R-22 refrigerant to be phased out by 2020 (MCR chillers).
TVA plans to perform the Chiller Upgrade Project in three phases. Phase 1 will be the replacement of Train-B SDBR chiller beginning on October 1, 2010, during WBN Unit 1 operation, and the Phase 1 work is estimated to take approximately 55 days. Phase 2 will be the replacement of Train-B MCR chiller beginning approximately December 1, 2010, during WBN Unit 1 operation, and the Phase 2 work is estimated to take approximately 62 days. Phase 3 will be the replacement of Train-A SDBR and MCR chillers beginning on October 1, 2011, during WBN Unit 1 operation, and the Phase 3 work is estimated to take approximately 68 days. TVA plans to complete all phases of the chiller upgrade project by December 20, 2011.
CONTACT: John G. Lamb, NRR (301) 415-310
TVA proposes to request a one-time AOT extension from 30 days to 60 days for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System, while WBN Unit 1 is operating while provided specified compensatory measures are taken. TVA plans to install and maintain a temporary non-safety-related chilled water system.
TVA plans to submit the proposed amendment request by December 18, 2009, and TVA plans to request NRC approval by December 1, 2010.
No members of the public attended this meeting. There were no public comments received.
Please direct any inquiries to John G. Lamb, Senior Project Manager at (301) 415-3100 or jgl1@NRC.gov.
/RA/
John G. Lamb, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390
Enclosures:
- 1. List of Attendees
- 2. TVA Handout cc w/encls: See next page
TVA proposes to request a one-time AOT extension from 30 days to 60 days for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System, while WBN Unit 1 is operating while provided specified compensatory measures are taken. TVA plans to install and maintain a temporary non-safety-related chilled water system.
TVA plans to submit the proposed amendment request by December 18, 2009 and TVA plans to request NRC approval by December 1, 2010.
No members of the public attended this meeting. There were no public comments received.
Please direct any inquiries to John G. Lamb, Senior Project Manager at (301) 415-3100, or jgl1@NRC.gov.
/RA/
John G. Lamb, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390
Enclosures:
- 1. List of Attendees
- 2. TVA Handout cc w/encls: Distribution via Listserv PUBLIC RidsOgcRp Resource LPWB Reading RidsOpaMail Resource RidsAcrsAcnw_MailCTR Resource RidsRgn2MailCenter Resource RidsNrrDraAadb Resource RidsNrrDssScrb RidsNrrDraApla Resource RDennig, NRR/DSS/SCVB RidsNrrDorl Resource DDiaz-Toro, OEDO RidsNrrDorlLp-Wb Resource RHannah, OPA RII RidsNrrDssSbpb Resource HWalker, NRR/DSS/SCVB RidsNrrDirsltsb Resource VCusumano, NRR/DIRS/ITSB RidsNrrPMWattsBar1 Resource RidsNrrLABClayton Resource Package Accession No.: ML093360557 Meeting Notice Accession No: ML093160010 Meeting Summary Accession No.: ML093360025 Handout Accession No.: Enclosure 2: ML093370027 NRC-001 OFFICE DORL/WBSP/PM DORL/WBSP/LA DORL/WBSP/BC NAME JLamb BClayton LRaghavan DATE 12/ 03 /09 12/ 03 /09 12/ 03 /09 OFFICIAL RECORD COPY
PRE-APPLICATION MEETING ATTENDEES REGARDING PROPOSED ALLOWED OUTAGE TIME ONE-TIME EXTENSION FOR THE CHILLER UPGRADE PROJECT WATTS BAR NUCLEAR PLANT, UNIT 1 DECEMBER 1, 2009 NAME COMPANY John G. Lamb U.S. Nuclear Regulatory Commission (NRC)
Harold Walker NRC Victor Cusumano NRC R.M. Krich Tennessee Valley Authority (TVA)
Kevin Casey TVA R.G. Mende TVA Housang Hemmati-Arass TVA Enclosures 1