Summary of Pre- Application Meeting with Tennessee Valley Authority Regarding Proposed Allowed Outage Time One-Time Extension for the Chiller Upgrade Project at Watts Bar Nuclear Plant, Unit 1
ML093360025
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 12/03/2009
From: John Lamb
Watts Bar Special Projects Branch
To:
Tennessee Valley Authority
Lamb John G./NRR/DORL, 415-3100
References
Download: ML093360025 (6)


Text

December 3, 2009 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Power Plant, Unit 1.

SUBJECT:

SUMMARY

OF DECEMBER 1, 2009, PRE-APPLICATION MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING PROPOSED ALLOWED OUTAGE TIME ONE-TIME EXTENSION FOR THE CHILLER UPGRADE PROJECT AT WATTS BAR NUCLEAR PLANT, UNIT 1 On December 1, 2009, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Tennessee Valley Authority (TVA) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the TVAs pre-application proposed allowed outage time (AOT) one-time extension amendment request for a chiller upgrade project at Watts Bar Nuclear Plant (WBN), Unit 1.

A list of attendees is provided in Enclosure 1 and TVA=s handouts provided at the meeting are included in Enclosure 2.

TVA gave a brief presentation including introductions, purpose of the pre-application meeting, the reason for the need for a chiller upgrade project, the plan for accomplishing the chiller upgrade project, and the proposed schedule for the chiller upgrade project.

TVA needs to replace the Train-A and Train-B Main Control Room (MCR) chillers and the Shutdown Board Room (SDBR) chillers due to Executive Order 13148 that requires all Federal Agencies to phase out procurement of Class 1 ozone-depleting refrigerants by December 31, 2010 (R-11 used in SDBR Chillers) and Clean Air Act requires production of R-22 refrigerant to be phased out by 2020 (MCR chillers).

TVA plans to perform the Chiller Upgrade Project in three phases. Phase 1 will be the replacement of Train-B SDBR chiller beginning on October 1, 2010, during WBN Unit 1 operation, and the Phase 1 work is estimated to take approximately 55 days. Phase 2 will be the replacement of Train-B MCR chiller beginning approximately December 1, 2010, during WBN Unit 1 operation, and the Phase 2 work is estimated to take approximately 62 days. Phase 3 will be the replacement of Train-A SDBR and MCR chillers beginning on October 1, 2011, during WBN Unit 1 operation, and the Phase 3 work is estimated to take approximately 68 days. TVA plans to complete all phases of the chiller upgrade project by December 20, 2011.

CONTACT: John G. Lamb, NRR (301) 415-310

TVA proposes to request a one-time AOT extension from 30 days to 60 days for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System, while WBN Unit 1 is operating while provided specified compensatory measures are taken. TVA plans to install and maintain a temporary non-safety-related chilled water system.

TVA plans to submit the proposed amendment request by December 18, 2009, and TVA plans to request NRC approval by December 1, 2010.

No members of the public attended this meeting. There were no public comments received.

Please direct any inquiries to John G. Lamb, Senior Project Manager at (301) 415-3100 or jgl1@NRC.gov.

/RA/

John G. Lamb, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390

Enclosures:

1. List of Attendees
2. TVA Handout cc w/encls: See next page

TVA proposes to request a one-time AOT extension from 30 days to 60 days for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System, while WBN Unit 1 is operating while provided specified compensatory measures are taken. TVA plans to install and maintain a temporary non-safety-related chilled water system.

TVA plans to submit the proposed amendment request by December 18, 2009 and TVA plans to request NRC approval by December 1, 2010.

No members of the public attended this meeting. There were no public comments received.

Please direct any inquiries to John G. Lamb, Senior Project Manager at (301) 415-3100, or jgl1@NRC.gov.

/RA/

John G. Lamb, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390

Enclosures:

1. List of Attendees
2. TVA Handout cc w/encls: Distribution via Listserv PUBLIC RidsOgcRp Resource LPWB Reading RidsOpaMail Resource RidsAcrsAcnw_MailCTR Resource RidsRgn2MailCenter Resource RidsNrrDraAadb Resource RidsNrrDssScrb RidsNrrDraApla Resource RDennig, NRR/DSS/SCVB RidsNrrDorl Resource DDiaz-Toro, OEDO RidsNrrDorlLp-Wb Resource RHannah, OPA RII RidsNrrDssSbpb Resource HWalker, NRR/DSS/SCVB RidsNrrDirsltsb Resource VCusumano, NRR/DIRS/ITSB RidsNrrPMWattsBar1 Resource RidsNrrLABClayton Resource Package Accession No.: ML093360557 Meeting Notice Accession No: ML093160010 Meeting Summary Accession No.: ML093360025 Handout Accession No.: Enclosure 2: ML093370027 NRC-001 OFFICE DORL/WBSP/PM DORL/WBSP/LA DORL/WBSP/BC NAME JLamb BClayton LRaghavan DATE 12/ 03 /09 12/ 03 /09 12/ 03 /09 OFFICIAL RECORD COPY

PRE-APPLICATION MEETING ATTENDEES REGARDING PROPOSED ALLOWED OUTAGE TIME ONE-TIME EXTENSION FOR THE CHILLER UPGRADE PROJECT WATTS BAR NUCLEAR PLANT, UNIT 1 DECEMBER 1, 2009 NAME COMPANY John G. Lamb U.S. Nuclear Regulatory Commission (NRC)

Harold Walker NRC Victor Cusumano NRC R.M. Krich Tennessee Valley Authority (TVA)

Kevin Casey TVA R.G. Mende TVA Housang Hemmati-Arass TVA Enclosures 1