Text

  • Pacific Gas and Electric Company' James R. Becker Diablo Canyon Power Plant Site Vice President Mail Code 104/5/601 P. 0. Box 56 Avila Beach, CA 93424 November 23, 2009 5.54l56.3462 Fax: 805.545.6445 PG&E Letter DCL-09-079 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 License Renewal Application Dear Commissioners and Staff: Pursuant to Part 54 of Title 10 of the Code of Federal Regulations (10 CFR Part 54), Pacific Gas and Electric Company (PG&E) hereby applies for the renewal of Facility Operating Licenses DPR-80 and DPR-82, for Diablo Canyon Power Plant (DCPP)Units 1 and 2, respectively.

The current Facility Operating Licenses for DCPP Units 1 and 2 expire at midnight November 2, 2024 and August 26, 2025, respectively.

By this application, PG&E requests that the DCPP Facility Operating Licenses be extended for 20 years beyond their current expiration dates. The application also applies to renewal of the source, special nuclear, and by-product materials licenses that are included in the Facility Operating Licenses.Enclosure 1 contains a compact disc (CD) of the license renewal application (LRA), excluding Appendix E, in accordance with 10 CFR Part 54. Enclosure 2 contains a CD of LRA, Appendix E, Applicant's Environmental Report -Operating License Renewal Stage, in accordance with 10 CFR Part 54.23 and 10 CFR Part 51, Subpart A. The CDs are formatted in a manner that is consistent with "Guidance for Electronic Submissions to the NRC", Revision 5, dated June 25, 2009.The commitments being made in this submittal are listed in the LRA, Appendix A, Table A4-1. In addition, it is understood that 10 CFR Part 54.21(b) requires that each year following submittal of the LRA and at least 3 months before scheduled completion of the NRC review, an amendment to the LRA must be submitted that identifies any change to the current licensing basis of the facility that materially affects the contents of the LRA, including the Final Safety Analysis Report (FSAR)supplement.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway -Comanche Peak

  • Diablo Canyon -Palo Verde
  • San Onofre
  • Wolf Creek Document Control Desk November 23, 2009 Page 2 PG&E Letter DCL-09-079 Should you have any questions or if additional information is needed regarding this application, please contact Mr. Terence L. Grebel, License Renewal Project Manager, at (805) 545-4160.I declare under penalty of perjury that the foregoing is true and correct.Executed on November 23, 2009 Sinc rely, James R. Becker Site Vice President gwh2/4162 Enclosures cc: Diablo Distribution cc/enc: Elmo E. Collins, NRC Region IV Regional Administrator Kimberly J. Green, NRC Project Manager, License Renewal Michael S. Peck, NRC Senior Resident Inspector Andrew L. Stuyvenberg, NRC Environmental Project Manager, License Renewal Alan B. Wang, NRC Project Manager, Office of Nuclear Reactor Regulation A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Catlaway
  • Comanche Peak -Diablo Canyon o Pato Verde

Enclosure 2 PG&E Letter DCL-09-079 License Renewal Application, Appendix E Applicant's Environmental Report -Operating License Renewal Stage (CID)