Nirnitz, Ronald From:
Calvin.Taylor@exeloncorp.com Sent:
Monday, June 08, 2009 2:39 PM To:
Nimitz, Ronald
Subject:
8" line Ron, it is referenced as SS-4 in the report.
The 8-inch CS line (SS-4/CS-25) is the Hotwell Level Control supply line from the Condensate Pump discharge header to flow control valve V-2-17. This line is pressurized to between 200 psig to 250 psig during normal operation. Upon developing a through wall leak in the pipe, leakage would immediately exit the pipe and enter the surrounding soil. This line was assessed as a Low Risk factor since it is a direct buried CS line. This line was assessed a Medium Radiological Consequence factor since a leak could lead to an unmonitored release and a Medium Consequence factor since a significant leak could lead to a plant shutdown.
Calvin C. Taylor Principal Regulatory Specialist
'4:609.971.4031 TEAMOyster Creek Exelon Nuclear This e-mail and any of its attachments may contain Exelon Corporation proprietary information, which is privileged, confidential, or subject to copyright belonging to the Exelon Corporation family of Companies. This e-mail is intended solely for the use of the individual or entity to which it is addressed. If you are not the intended recipient of this e-mail, you are hereby notified that any dissemination, distribution, copying, or action taken in relation to the contents of and attachments to this e-mail is strictly prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender immediately and permanently delete the original and any copy of this e-mail and any printout. Thank You. *************************