ML093130035

From kanterella
Jump to navigation Jump to search
Confirmation of Requested Initial Operator License Examinations for Crystal River Nuclear Plant
ML093130035
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/06/2009
From: Kennedy K
Division of Reactor Safety II
To: Franke J
Progress Energy Florida
References
Download: ML093130035 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 November 6, 2009 Mr. Jon A. Franke Vice President, Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR CRYSTAL RIVER NUCLEAR PLANT

Dear Mr. Franke:

In a letter dated August 27, 2009, Serial # 3F0809-04, your staff responded to Regulatory Issue Summary 2009-011 and requested we schedule initial license operator examinations for Crystal River Nuclear Plant. Based on your letter and following discussions with your staff, we have scheduled the requested examination as follows:

Plant / 2010 2011 Station Date Applicants Date Applicants Crystal River N/R N/R 9/12 16

  • N/R - None Requested On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exam from that listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.

We understand that your staff will develop the proposed examination. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.

If the number of applicants is reduced to less than ten (10), please inform us as this will impact the examination schedule.

A supplementary letter will be sent to each stations training manager approximately 120 days prior to the initial examination. The letter will provide the training manager with the chief examiner=s name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch, at 404-562-4550.

FPC 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Kriss M. Kennedy, Director Division of Reactor Safety Docket Nos.: 50-302 License Nos.: DPR-72 cc: (See page 3)

_________________________ X SUNSI REVIEW COMPLETE MTW OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE PGC /RA/ MTW /RA/ KMK /RA/

NAME PCapehart MWidmann KKennedy DATE 11/03/2009 11/04/2009 11/06/2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO FPC 3 cc w/encl: Daniel R. Westcott R. J. Duncan, II Supervisor Vice President Licensing & Regulatory Programs Nuclear Operations Crystal River Nuclear Plant (NA1B)

Carolina Power & Light Company Electronic Mail Distribution Electronic Mail Distribution Jack E. Huegel Brian C. McCabe Manager, Nuclear Oversight Manager, Nuclear Regulatory Affairs Crystal River Nuclear Plant Progress Energy Carolinas, Inc. Electronic Mail Distribution Electronic Mail Distribution Mark Rigsby James W. Holt Manager, Support Services - Nuclear Plant General Manager Crystal River Nuclear Plant (NA2C)

Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution Electronic Mail Distribution Attorney General Stephen J. Cahill Department of Legal Affairs Engineering Manager The Capitol PL-01 Crystal River Nuclear Plant (NA2C) Tallahassee, FL 32399-1050 Electronic Mail Distribution Ruben D. Almaguer R. Alexander Glenn Director Associate General Counsel Division of Emergency Preparedness (MAC - BT15A) Department of Community Affairs Florida Power Corporation Electronic Mail Distribution Electronic Mail Distribution Chairman Steven R. Carr Board of County Commissioners Associate General Counsel Citrus County Legal Department 110 N. Apopka Avenue Progress Energy Service Company, LLC Inverness, FL 36250 P.O. Box 1551 Raleigh, NC 27602-1551 Phyllis Dixon Training Manager Christos Kamilaris Crystal River Nuclear Plant Director Electronic Mail Distribution Fleet Support Services Carolina Power & Light Company Electronic Mail Distribution William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution

FPC 4 Letter to Jon A. Franke from Kriss Kennedy dated November 6, 2009

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR CRYSTAL RIVER NUCLEAR PLANT Distribution w/encl:

RIDSNRRDIRS PUBLIC RidsNrrPMCrystal River Resource ORA, RII K. Kennedy H. Christensen M. Widmann P. Capehart J. Vincent M. Sykes J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing