ML093100265
| ML093100265 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 11/06/2009 |
| From: | Wert L Division Reactor Projects II |
| To: | Brandi Hamilton Duke Energy Carolinas |
| References | |
| EA-08-220, IR-08-009 | |
| Download: ML093100265 (5) | |
See also: IR 05000369/2008009
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
SAM NUNN ATLANTA FEDERAL CENTER
61 FORSYTH STREET, SW, SUITE 23T85
ATLANTA, GEORGIA 30303-8931
November 6, 2009
Mr. Bruce H. Hamilton
Vice President
Duke Energy Carolinas, LLC
McGuire Nuclear Station
12700 Hagers Ferry Road
Huntersville, NC 28078-8985
SUBJECT:
REPLY TO DUKE ENERGY CAROLINAS, LLC LETTER DATED OCTOBER 1,
2009, REGARDING REVISION TO COMMITMENT IN RESPONSE TO NOTICE
OF VIOLATION EA-08-220 (NRC INSPECTION REPORT NOS.
05000369/2008009 AND 05000370/2008009)
Dear Mr. Hamilton:
This is in response to your letter of October 1, 2009, related to a revision to a commitment in
response to Notice of Violation EA-08-220.
On October 27, 2008, the United States Nuclear Regulatory Commission (NRC) issued McGuire
Nuclear Station a White finding and associated Notice of Violation (NOV) for a failure to correct
a significant condition adverse to quality related to macro-fouling of the Nuclear Service Water
System (NSWS) strainer backwash system. The White finding and NOV were documented in
NRC Inspection Report 05000369/2008009 and 05000370/2008009.
In the Duke Energy Carolinas (DEC) response to the White finding and NOV dated
November 25, 2008, DEC committed to address the NSWS non-conformance by updating the
UFSAR by April 30, 2009, to incorporate the physical and procedural changes that have been
made to the facility as a result of the event; and by submitting a License Amendment Request
(LAR) to resolve the non-conforming condition prior to the conclusion of the fall 2009 refueling
outage.
On October 1, 2009, DEC provided a letter that replaced the commitment to submit a LAR prior
to the conclusion of the fall 2009 refueling outage with a new commitment to enhance portions
of the backwash function of the Nuclear Service Water System. This included physical
modifications to the NSWS and determining if a LAR was necessary. The completion date for
this new commitment was listed as December 2012.
So that we can fully assess the regulatory and safety implications of this new commitment,
please provide a supplemental response within 30 days of the date of this letter that addresses
the following:
2
1. Provide an explanation addressing what compensatory or other measures you have in place
to assure the operability of the NSWS in case macro-fouling does occur before full
compliance is restored, and why you believe those measures are adequate.
2. Provide a discussion of why your activities will not be completed until December 2012.
Regarding those activities necessary to restore compliance, please specifically address why
the revised date represents the first available opportunity to restore compliance.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its
enclosure, and your response (if any) will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your prompt attention to this matter. If you have any questions, please contact
Jonathan Bartley at (404) 562-4607.
Sincerely,
/RA/
Leonard D. Wert, Jr., Director
Division of Reactor Projects
Docket Nos.: 50-369, 50-370
cc: (See page 3)
_________________________
X SUNSI REVIEW COMPLETE JHB
OFFICE
RII:DRP
RII:DRP
RII:DRS
RII:EICS
SIGNATURE
EJS /RA?
JHB /RA/
SES /RA for/
NAME
EStamm
JBartley
MErnstes
CEvans
DATE
11/03/2009
11/03/2009
11/05/2009
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO
3
cc w/encl:
Steven D. Capps
Engineering Manager
Duke Energy Carolinas, LLC
Electronic Mail Distribution
Scotty L. Bradshaw
Training Manager
Duke Energy Carolinas, LLC
Electronic Mail Distribution
Kenneth L. Ashe
Regulatory Compliance Manager
Duke Energy Carolinas, LLC
Electronic Mail Distribution
R. L. Gill, Jr.
Manager
Nuclear Regulatory Issues & Industry Affairs
Duke Energy Carolinas, LLC
Electronic Mail Distribution
Lisa F. Vaughn
Associate General Counsel
Duke Energy Corporation
526 South Church Street-EC07H
Charlotte, NC 28202
Kathryn B. Nolan
Senior Counsel
Duke Energy Corporation
526 South Church Street-EC07H
Charlotte, NC 28202
David A. Repka
Winston Strawn LLP
Electronic Mail Distribution
County Manager of Mecklenburg County
720 East Fourth Street
Charlotte, NC 28202
W. Lee Cox, III
(Acting) Section Chief
Radiation Protection Section
N.C. Department of Environmental
Commerce & Natural Resources
Electronic Mail Distribution
Dhiaa M. Jamil
Group Executive and Chief Nuclear Officer
Duke Energy Carolinas, LLC
Electronic Mail Distribution
4
Letter to Bruce H. Hamilton from Leonard D. Wert, Jr. dated November 6, 2009
SUBJECT:
REPLY TO DUKE ENERGY CAROLINAS, LLC LETTER DATED OCTOBER 1,
2009, REGARDING REVISION TO COMMITMENT IN RESPONSE TO NOTICE
OF VIOLATION EA-08-220 (NRC INSPECTION REPORT NOS.
05000369/2008009 AND 05000370/2008009)
Distribution w/encl:
C. Evans, RII
L. Slack, RII
OE Mail
RIDSNRRDIRS
PUBLIC
RidsNrrPMMcGuire Resource