License Amendment Request Pursuant to 10 CFR 50.90: Revisions to Primary Coolant System Pressure Isolation Valve Requirements Consistent with Standard Technical Specifications - Revised Requested Approval Date
ML092940717
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/15/2009
From: Lynch T
Constellation Energy Group, Nine Mile Point
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML092940717 (2)


Text

Thomas A. Lynch P.O. Box 63 Plant General Manager Lycoming, New York 13093 315.349.5205 315.349.1321 Fax 0Constellation Energy Nine Mile Point Nuclear Station October 15, 2009 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk

SUBJECT:

Nine Mile Point Nuclear Station Unit No. 1; Docket No. 50-220 License Amendment Request Pursuant to 10 CFR 50.90: Revisions to Primary Coolant System Pressure Isolation Valve Requirements Consistent with Standard Technical Specifications - Revised Requested Approval Date

REFERENCE:

(a) Letter from T. A. Lynch (NMPNS) to Document Control Desk (NRC), dated September 18, 2009, License Amendment Request Pursuant to 10 CFR 50.90:

Revisions to Primary Coolant System Pressure Isolation Valve Requirements Consistent with Standard Technical Specifications - Technical Specification Sections 3.2.7.1 and 4.2.7.1 By letter dated September 18, 2009 (Reference a), Nine Mile point Nuclear Station, LLC (NMPNS) submitted a request for an amendment to the Nine Mile Point Unit 1 (NMP 1) Renewed Facility Operating License DPR-63. The proposed amendment would modify Technical Specification (TS) Sections 3.2.7.1 and 4.2.7.1, "Primary Coolant System Pressure Isolation Valves," to incorporate requirements that are consistent with Section 3.4.5 of the Improved Standard Technical Specifications, NUREG-1433, Revision 3.1. Approval of the proposed license amendment was requested by December 4, 2009 to permit timely maintenance of a degraded pressure isolation valve (PIV).

Since Reference (a) was submitted, NMP1 experienced an unplanned outage during which the degraded PIV was repaired, thereby removing the reason for requesting an expedited NRC review. Therefore, NMPNS hereby modifies the license amendment request by changing the requested approval date to September 17, 2010, with implementation within 60 days of receipt of the approved amendment.

This request does not affect the No Significant Hazards Determination analysis provided by NMPNS in Reference (a). Pursuant to 10 CFR 50.91(b)(1), NMPNS has provided a copy of this request to the appropriate state representative. This letter contains no new regulatory commitments.

Document Control Desk October 15, 2009 Page 2 Should you have any questions regarding the information in this submittal, please contact T. F. Syrell, Licensing Director, at (315) 349-5219.

Very truly yours, STATE OF NEW YORK TO WIT:

COUNTY OF OSWEGO I, Thomas A. Lynch, being duly sworn, state that I am the Nine Mile Point Plant General Manager, and that I am duly authorized to execute and file this request on behalf of Nine Mile Point Nuclear Station, LLC. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other Nine Mile Point employees and/or consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable.

Subscribed and sworn before me, a Notary Public in and for the State of New York and County of this L day of &jý , 2009.

WITNESS my Hand and Notarial Seal: "x9

  • /Notary Pj~blic v My Commission Expires: TONYA L JONES Notary Public intheState of New York I) 11Aa)b io Oswego County Reg. No. 0106D83354 Date My Commission Expires I! IIlate=

TAL/DEV cc: S. J. Collins, NRC R. V. Guzman, NRC Resident Inspector, NRC A. L. Peterson, NYSERDA