L-2009-230, 2009/10/19-Comment (41) of Mchenry Cornell on Behalf of Florida Power & Light Co., on Proposed Rules PR-50 & PR-52, Re Enhancements to Emergency Preparedness Regulations

From kanterella
(Redirected from ML092940617)
Jump to navigation Jump to search
2009/10/19-Comment (41) of Mchenry Cornell on Behalf of Florida Power & Light Co., on Proposed Rules PR-50 & PR-52, Re Enhancements to Emergency Preparedness Regulations
ML092940617
Person / Time
Site: Saint Lucie, Point Beach, Seabrook, Turkey Point, Midland  NextEra Energy icon.png
Issue date: 10/19/2009
From: Cornell M
Florida Power & Light Co
To:
NRC/SECY/RAS
SECY RAS
References
74FR23253 00041, DG-1237, L-2009-230, NRC-2008-0122, PR-50, PR-52
Download: ML092940617 (2)


Text

0 F=PL Florida Power & Light Company, 700 Universe Boulevard, P.O. Box 14000, Juno Beach, FL 33408-0420 PR 50 and 52 (74FR23253)

October 19, 2009 L-2009-230 Secretary U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTN: Rulemakings and Adjudications Staff Re: Florida Power and Light Company St. Lucie Units 1 and 2, Docket Nos. 50-335, 50-389 Turkey Point Units 3 and 4, Docket Nos. 50-250, 50-251 DOCKETED USNRC October 20, 2009 (4:00pm)OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF NextEra T M Energy Seabrook, LLC Seabrook Station, Docket No. 50-443 NextEraTM Energy Duane Arnold, LLC Duane Arnold Energy Center, Docket No. 50-331 NextEra T M Energy Point Beach, LLC Point Beach Units 1 and 2, Docket Nos. 50-266, 50-301

Subject:

[NRC Docket ID 2008-0122]

Comments on: 10 CFR Parts 50 and 52 Enhancements to Emergency Preparedness Regulations; Proposed Rule NUREG/CR-XXXX, Criteria for Development of Evacuation Time Estimate Studies, Draft Report for Comment Interim Staff Guidance:

Emergency Planning for Nuclear Power Plants;Solicitation of Public Comment Notice of Issuance and Availability of Draft Regulatory Guide, DG-1237,"Guidance on Making Changes to Emergency Response Plans for Nuclear Power Reactors," Florida Power and Light Company, the licensee for the St. Lucie Nuclear Plant, Units 1 and 2, and the Turkey Point Nuclear Plant, Units 3 and 4 (hereafter referred to as FPL) and its FPL Group affiliates, NextEra Energy Seabrook, LLC (NextEra Energy Seabrook) the licensee for Seabrook Station; NextEra Energy Duane Arnold, LLC (NextEra Energy Duane Arnold), the licensee for Duane Arnold Energy Center (DAEC); and NextEra Energy Point Beach, LLC (NextEra Energy Point Beach), the licensee for Point Beach Nuclear Plant, Units 1 and 2 (hereafter referred to collectively as NextEra Energy) hereby submit the following comment on the above listed documents contained in NRC Docket ID 2008-0122.

an FPL Group company : " 47 -DS 10 L-2009-230 Page 2 of 2 Representatives of FPL have participated in the industry effort with Nuclear Energy Institute (NEI) to collect and transmit comments on the referenced document.

Based on participation in and review of this collective effort, FPL and NextEra Energy endorse the comments transmitted by NEI letter dated October 19, 2009.Please contact Mr. Don Mothena at (561) 694-4218 if there are questions concerning these comments.Sincere rs, McHenry Corn I1 Director Licensing and Performance Improvement