Transmittal of Draft RAIs Associated with One-Time Schedular Exemption from the Requirements of 10 CFR 26.205(d)(4) for Operations and Maintenance Personnel
ML092790037
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/06/2009
From: Beltz T
Plant Licensing Branch III
To: Scarpello M
Indiana Michigan Power Co
beltz T, NRR/DORL/LPL3-1, 301-415-3049
References
TAC ME2305
Download: ML092790037 (2)


Text

ADAMS Accession No.: ML092790037 From:

Beltz, Terry Sent:

Tuesday, October 06, 2009 8:15 AM To:

'mkscarpello@aep.com' Cc:

'pgschoepf@aep.com'; 'jmpetro@aep.com'; 'jrwaters@aep.com'; Boggi, Michael

Subject:

Donald C. Cook Nuclear Plant, Unit 1 - Draft RAIs Associated with One-Time Schedular Exemption from the Requirements of 10 CFR 26.205(d)(4) (TAC No. ME2305)

Dear Mr. Scarpello:

This e-mail is in reference to Indian Michigan Power Company's (I&M, the licensee) request for a one-time schedular exemption from the requirements of 10 CFR 26.205(d)(4) dated September 18, 2009 (Agencywide Documents and Access Management System (ADAMS)

Accession No. ML092680722). The proposed exemption would allow the less restrictive working hour limitations during a 60-day period starting on a date to be determined by I&M, consistent with the restart on Unit 1 from the current extended outage. The proposed exemption would apply only to Operations and Maintenance personnel supporting the increased outage activity workload associated with the restart.

The NRC staff in the Operator Licensing and Human Performance has reviewed I&M's submittal and developed draft requests for additional information (RAI). The DRAFT RAIs are as follows:

1. In the exemption request, the phrase "schedular exemption" is used several times.

Please provide further clarification of the phrase "schedular exemption."

2. Please explain how a "one-time schedular exemption from the provisions of 10 CFR 26.205(d)(4)" achieves the intended purpose of the request. Specifically, please provide further clarification as to why an exemption is being requested from the requirements of 10 CFR 26.205(d)(4).

The NRC staff would still like to review the draft RAIs with you in a conference call.

The sole purpose of this e-mail and its attachment is to prepare you and others for the proposed conference call or meeting. This e-mail and its attachment do not convey a formal NRC staff position, and do not formally request additional information.

Please don't hesitate to contact me if you have any questions or concerns.

Sincerely, Terry A. Beltz, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-3049 Terry.Beltz@nrc.gov

E-mail Properties Mail Envelope Properties ()

Subject:

Donald C. Cook Nuclear Plant, Unit 1 - Draft RAIs Associated with One-Time Schedular Exemption from the Requirements of 10 CFR 26.205(d)(4) (TAC No. ME2305)

Sent Date: 10/5/2009 10:22:11 AM Received Date: 10/6/2009 8:15:00 AM From: Beltz, Terry Created By: Terry.Beltz@nrc.gov Recipients:

mkscarpello@aep.com ('mkscarpello@aep.com')

Tracking Status: None pgschoepf@aep.com ('pgschoepf@aep.com')

Tracking Status: None jmpetro@aep.com ('jmpetro@aep.com')

Tracking Status: None jrwaters@aep.com ('jrwaters@aep.com')

Tracking Status: None Michael.Boggi@nrc.gov (Boggi, Michael)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 16759 10/5/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: