MONTHYEARIR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000369/20234202023-07-24024 July 2023 Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) IR 05000369/20220042023-01-30030 January 2023 Mcguire Nuclear Station - Integrated Inspection Report 05000369/2022004 and 05000370/2022004 IR 05000369/20224202023-01-11011 January 2023 Security Baseline Inspection Report 05000369/2022420 and 05000370/2022420 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22340A6662022-12-0808 December 2022 Summary of November 30, 2022, Public Meeting with Duke Energy Carolinas, LLC for McGuire Nuclear Station, Units 1 & 2 Proposed LAR to Adopt TSTF-505, Rev. 2 and 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems ML22290A1012022-11-29029 November 2022 Issuance of Amendment Nos. 326 and 305, Regarding Changes to Technical Specification 3.4.3, Reactor Coolant System Pressure Temperature Limits ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000369/20220032022-10-27027 October 2022 Integrated Inspection Report 05000369/2022003 and 05000370/2022003 IR 05000369/20220112022-09-29029 September 2022 Biennial Problem Identification and Resolution Inspection Report 05000369/2022011 and 05000370/2022011 ML22266A0782022-09-26026 September 2022 William B. Mcguire Nuclear Station, Unit 2 Pressurizer Power Operated Relief Valve Relief Request ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition IR 07200038/20220012022-09-12012 September 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200038/2022001 ML22230B6132022-09-0101 September 2022 Review of the Draft Environmental Assessment and Finding of No Significant Impact for Brunswick Steam Electric Plant and McGuire Nuclear Station Independent Spent Fuel Storage Installations Decommissioning Funding Plans IR 05000369/20220052022-08-29029 August 2022 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 NRC Inspection Report 05000369/2022005 and 05000370/2022005 IR 05000369/20220022022-07-26026 July 2022 Integrated Inspection Report 05000369/2022002 and 05000370/2022002 ML22215A2502022-07-25025 July 2022 EN 55960 - Update - Curtiss Wright ML22164A0362022-07-19019 July 2022 Mcguire Nuclear Station, Units 1 and 2; Issuance of Amendments to Revise the Conditional Exemption of the End-Of-Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) Public ML22175A0162022-06-24024 June 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22111A3112022-05-16016 May 2022 Letter Issuing Exemption to McGuire IR 05000369/20224012022-05-12012 May 2022 Cyber Security Inspection Report 05000369/2022401 and 05000370/2022401 2024-01-31
[Table view] Category:Licensee 30-Day Written Event Report
MONTHYEARML0927303562009-09-21021 September 2009 Submittal of Special Report 2009-01, Revision 0, Problem Investigation Process (PIP) M-09-04862 2009-09-21
[Table view] |
Text
Duke BRUCE H. HAMILTON Vice President Energy. McGuire Nuclear Station Duke Energy MG01 VP /12700 Hagers Ferry Road Huntersville, NC 28078 980-875-5333 980-875-4809 fax bruce.hamilton@duke-energy.corn September 21, 2009 U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C. 20555
Subject:
Duke Energy Carolinas, LLC McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Special Report 2009-01, Revision 0 Problem Investigation Process (PIP) M-09-04862 Pursuant to 10 CFR 20 Appendix G, attached is Special Report 2009-01, Revision 0, regarding the delay in receipt of a low level radioactive waste shipment sent via rail from McGuire Nuclear Station (McGuire) to the Energy Solutions disposal facility in Clive, Utah. 10 CFR 20 Appendix G requires that a waste shipment be investigated by the shipper if notification of receipt at the disposal facility is not received within 20 days after transfer to the carrier. This McGuire shipment did not arrive at the disposal facility within 20 days of transfer to the carrier.
If questions arise regarding this Special Report, contact Joyce Correll at 980-875-4039.
Sincerely, Bruce H. Hamilton Attachment www. duke-energy.corn
U.S. Nuclear Regulatory Commission September 21, 2009 Page 2 cc: L. A. Reyes, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303 J. H. Thompson, Jr. (Addressee Only)
Senior Project Manager (McGuire)
U.S. Nuclear Regulatory Commission Mail Stop O-8G9A Washington, DC 20555 J. B. Brady Senior Resident Inspector U.S. Nuclear Regulatory Commission McGuire Nuclear Station B. 0. Hall, Section Chief North Carolina Department of Environment and Natural Resources Division of Environmental Health Radiation Protection Section 1645 Mail Service Center Raleigh, NC 27699-1645
Attachment McGuire Nuclear Station Special Report 2009-01 PIP M-09-04862 Reporting Requirement 10 CFR 20 Appendix G, "Requirements for Transfers of Low-Level Radioactive Waste Intended for Disposal at Licensed Land Disposal Facilities and Manifests," contains investigation and reporting requirements for radioactive waste shipments for which acknowledgement is not received within 20 days after transfer.
Section III.E of this regulation directs the shipper to perform and document an investigation to trace the shipment and file a written report with the nearest NRC Regional Office within 2 weeks of completion of the investigation.
The following text is copied form 10 CFR 20 Appendix G:
"E. Any shipment or part of a shipment for which acknowledgement is not received within the times set forth in this section must:
- 1. Be investigated by the shipperif the shipperhas not received notification or receipt within 20 days after transfer; and
- 2. Be traced and reported. The investigation shall include tracing the shipment and filing a report with the nearest Commission Regional Office listed in Appendix D to this part. Each licensee who conducts a trace investigation shall file a written report with the appropriateNRC Regional Office within 2 weeks of completion of the investigation."
Background Information Radioactive waste shipment RSR# MNS 09-0012 departed from McGuire Nuclear Station (McGuire) on August 18, 2009 enroute to the Energy Solutions disposal facility in Clive, Utah.
This shipment consisted of one gondola car (CEFX 35294) containing low level radioactive waste (steam generator upper assembly sections) from the McGuire steam generator disposal project. A total of five gondola cars left McGuire via rail (in the same train) on this date, each a separate shipment classified as "Radioactive Material, Excepted Package, Limited Quantity of Material 7, UN2910, Fissile Excepted". Required markings were applied to all packages and appropriate shipping paperwork accompanied each shipment. Transport arrangements were made for McGuire by Energy Solutions. CSXT transported the rail cars to East St. Louis,'
Illinois, where they inter-changed with Union Pacific for the last portion of the trip to Clive, Utah.
The estimated arrival date for all five rail cars was August 31, 2009. Four cars arrived on September 1, 2009, but CEFX 35294 did not arrive until September 10, 2009, 23 days after leaving McGuire which requires investigating and reporting per 10 CFR 20 Appendix G.
Attachment McGuire Nuclear Station Special Report 2009-01 PIP M-09-04862 Investigation Five gondola cars departed from McGuire on August 18, 2009. They arrived as a group in Hamlet, North Carolina on August 19. Gondola car CEFX 35294 was separated from the other four cars and was routed back to Charlotte, North Carolina in error. The car arrived in Charlotte on August 21 and was sent back to Hamlet the next day. In the meantime, the other four cars left Hamlet heading west to Clive, Utah which put CEFX 35294 essentially three days behind them. In addition, this same lagging car (CEFX 35294) was held up for two more days in a rail yard near Cincinnati, Ohio before being assigned to the next train heading west. Traveling during the Labor Day weekend also contributed to the delays encountered.
At no time was the location of gondola car CEFX 35294 or its contents unknown. The shipment was tracked by the carrier at all times during transit and Energy Solutions personnel provided daily updates to Radiation Protection Management at McGuire on the current location of the five gondola cars. Late arrival of gondola car CEFX 35294 at Clive, Utah was expected based on the information provided by Energy Solutions during transit.
Notification of shipment arrival was provided by Energy Solutions via email on September 10, 2009. The shipment return manifest was received by McGuire Radiation Protection on September 17, 2009.
Corrective Actions Site response and actions included placing the issue into the McGuire corrective action program (PIP M-09-04862) and making the NRC Site Resident and McGuire Management aware of the issue as it applied to the Regulation. In addition, McGuire Radiation Protection Management communicated to Energy Solutions that any future rail shipments of radioactive material from McGuire must be scheduled so as to not be enroute during holiday weekends.