ML092680165

From kanterella
Jump to navigation Jump to search
Acceptance Review for Relief Request RR-22
ML092680165
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/25/2009
From: Justin Poole
Plant Licensing Branch III
To: Jim Costedio, Flentje F
Point Beach
Poole Justin/DORL/LPL3-1/ 301-415-2048
References
Download: ML092680165 (2)


Text

From:

Poole, Justin Sent:

Friday, September 25, 2009 10:36 AM To:

COSTEDIO, JAMES; 'Flentje, Fritzie'

Subject:

Point Beach Nuclear Plant, Units 1 and 2 - Acceptance Review for Relief Request RR-22

Jim, By letter dated August 28, 2009, FPL Energy Point Beach, LLC, submitted a relief request for Point Beach Nuclear Plant, Units 1 and 2. The submittal requests approval of an alternative to the plant conditions specified in the American Society of Mechanical Engineers, Boiler and Pressure Vessel Code,Section XI, 1998 Edition through 2000 Addenda, for system leakage test examinations conducted on selected Class 1 component pressure boundaries. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff=s detailed technical review by separate correspondence.

If you have any question please contact me.

Justin C. Poole Project Manager NRR/DORL/LPL3-1 U.S. Nuclear Regulatory Commission (301)415-2048 email: Justin.Poole@nrc.gov E-mail Properties

Mail Envelope Properties ()

Subject:

Point Beach Nuclear Plant, Units 1 and 2 - Acceptance Review for Relief Request RR-22 Sent Date: 9/25/2009 9:59:29 AM Received Date: 9/25/2009 10:35:00 AM From: Poole, Justin Created By: Justin.Poole@nrc.gov Recipients:

JAMES.COSTEDIO@nexteraenergy.com (COSTEDIO, JAMES)

Tracking Status: None Fritzie.Flentje@nexteraenergy.com ('Flentje, Fritzie')

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 11554 9/25/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: