ML092520124

From kanterella
Jump to navigation Jump to search

Request for Additional Information, License Amendment Request, Revise TS 6.9.1.11, Core Operating Limits Report to Add New Analytical Methods to Support Implementation of Westinghouse Next Generation Fuel
ML092520124
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/17/2009
From: Kalyanam N
Plant Licensing Branch IV
To:
Entergy Operations
Kalyanam N, NRR/DORL/LPL4, 415-1480
References
TAC ME1359
Download: ML092520124 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 17, 2009 Vice President, Operations Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - REQUEST FOR ADDITIONAL INFORMATION RE: LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 6.9.1.11, "CORE OPERATING LIMITS REPORT (COLR)" (TAC NO. ME1359)

Dear Sir or Madam:

By letter dated May 22, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML091470271), Entergy Operations, Inc. (the licensee), submitted an application for a license amendment request to the U.S. Nuclear Regulatory Commission (NRC) requesting an amendment to the license in the form of changes to the Technical Specification 6.9.1.11, "Core Operating Limits Report (COLR)."

The NRC staff has reviewed the application and has determined that additional information contained in the enclosure is needed to complete the review. The staff discussed the need for additional information on September 3, 2009, with Mr. M. Mason of your staff. Mr. Mason agreed to provide a response within 30 days of the receipt of this letter.

If you have any questions, please contact me at (301) 415-1480 or by electronic mail at kaly.kalyanam@nrc.gov.

Sincerely, N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382

Enclosure:

As stated cc w/encl.: Distribution via ListServ

OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION WATERFORD STEAM ELECTRIC STATION, UNIT 3 LICENSE AMENDMENT REQUEST TO REVISE TS 6.9.1.11, "CORE OPERATING LIMITS REPORT (COLR)"

By letter dated August 2, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072180042), Entergy Operations, Inc. (Entergy, the licensee),

proposed to revise the Waterford Steam Electric Station, Unit 3 (Waterford 3) Technical Specification (TS) 6.9.1.11, "Core Operating Limits Report (COLR)," to add new analytical methods to support the implementation of Westinghouse's Next Generation Fuel (NGF). During the review process, the Nuclear Regulatory Commission (NRC) staff requested clarification as to why there were several methodologies listed in the TSs for the same parameter. In its letter dated March 10, 2008 (ADAMS Accession No. ML080720667), Entergy made a one-time commitment to review the TS methodology references for other similar plants that reflected the NRC-approved methods used in establishing the COLR parameter limits. In its letter dated May 22, 2009 (ADAMS Accession No. ML091470271), Entergy submitted an application for a license amendment request, NPF-38-281, to revise TS 6.9.1.11 to minimize the number of references consistent with the guidance provided in nrc Generic Letter (GL) 88-16, "Removal of Cycle-Specific Parameter Limits from Technical Specifications."

The NRC staff has reviewed the application and deterrnined that the following information is needed to complete its review:

1.

With respect to the list of core operating limits listed in Insert 1 in Attachment 2 to the May 22, 2009 letter, please provide the following information:

A clarification that the proposed list consists of all independent cycle-specific core operating limits; A description of the relationship between TS 3.2.1, "Linear Heat Rate," and TS 3.6.1.5, "Air Temperature, Containment"; and The reason why a parenthesis (Linear Heat Rate, 3.2.1) follows TS 3.6.1.5.

2.

Based on the guidance specified in GL 88-16, each approved methodology listed in TS 6.9.1.11.1 should support a calculation for a cycle-specific core operating limit listed in the proposed Insert 1. It appears that the list of analytical methodologies in proposed Insert 2 in Attachment 2 to the May 22,2009, letter is not in compliance with GL 88-16 guidance; therefore, please provide the following information:

Describe how each of the five methodologies listed in Insert 2 (e.g., Nuclear Engineering Methodologies) support the Insert 1 cycle-specific parameters; Enclosure

- 2 Describe the relationship between the cycle-specific parameters in proposed Insert 1 and the methodologies in proposed Insert 2; and Provide justification that all of the analytical methodologies listed in proposed Insert 2 are qualified to be listed in TS 6.9.1.11.1.

September 17, 2009 Vice President, Operations Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093 SUB~IECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - REQUEST FOR ADDITIONAL INFORMATION RE: LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 6.9.1.11, "CORE OPERATING LIMITS REPORT (COLR)" (TAC NO. ME1359)

Dear Sir or Madam:

By letter dated May 22, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML091470271), Entergy Operations, Inc. (the licensee), submitted an application for a license amendment request to the U.S. Nuclear Regulatory Commission (NRC) requesting an amendment to the license in the form of changes to the Technical Specification 6.9.1.11, "Core Operating Limits Report (COLR)."

The NRC staff has reviewed the application and has determined that additional information contained in the enclosure is needed to complete the review. The staff discussed the need for additional information on September 3, 2009, with Mr. M. Mason of your staff. Mr. Mason agreed to provide a response within 30 days of the receipt of this letter.

If you have any questions, please contact me at (301) 415-1480 or by electronic mail at kaly.kalyanam@nrc.gov.

Sincerely, IRA!

N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382

Enclosure:

As stated cc w/encl.: Distribution via ListServ DISTRIBUTION:

PUBLIC RidsNrrLAJBurkhardt Resource LPLIV rtf RidsNrrPMWaterford Resource RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsNrrDorlDpr Resource RidsRgn4MailCenter Resource RidsNrrDorlLpl4 Resource)

THuang, NRRIDSS/SRXB RidsNrrDssSrxb Resource ADAMS Accesslon N

  • M'!nor e d't. I ch I

rom s a

o. ML092520124 I ona anges OnlY f t ff RAI OFFICE NRR/LPL4/PM NRR/LPL4/PM NRR/DSS/SRXB NRR/LPL4/BC NRR/LPL4/PM NAME NKalyanam JBurkhardt GCranston*

MMarkley NKalyanam DATE 9/10/09 9/9/09 9/2/09 9/17/09 9/17/09 OFFICIAL RECORD COpy