ML092440414
| ML092440414 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/01/2009 |
| From: | Marvin Sykes NRC/RGN-II/DRP/RPB3 |
| To: | Nazar M Florida Power & Light Co |
| Shared Package | |
| ML092440410 | List: |
| References | |
| Download: ML092440414 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 September 1, 2009 Florida Power and Light Company ATTN: Mr. Mano Nazar, Senior Vice President Nuclear and Chief Nuclear Officer P.O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - TURKEY POINT NUCLEAR PLANT
Dear Mr. Nazar:
On August 12, 2009, the NRC staff completed its performance review of the Turkey Point Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2008 through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter at Turkey Point Units 3 and 4 was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
The enclosed inspection plan details the inspections, less those related to security scheduled through December 31, 2010. In addition to ROP baseline inspection activities, we also plan on conducting several infrequently performed inspections, which include Temporary Instruction (TI) 2515/173, Review of the Implementation of the Industry Ground Water Protection Volunteer Initiative; and Operator Licensing Examinations. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
FP&L 2
As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible.
Please contact me at 404-562-4629 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41
Enclosure:
Turkey Point Nuclear Plant Inspection/Activity Plan (09/01/09 - 12/31/10) cc w/encl: (See page 3)
G SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE SON JDH5 MDS NAME SNinh JHamman MSykes DATE 09/01 /2009 09/01/2009 09/01/2009 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
FP&L 3
cc w/encl:
Alison Brown, Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution McHenry Cornell, Director Licensing and Performance Improvement Florida Power & Light Company Electronic Mail Distribution Michael Kiley, Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Niel Batista Emergency Management Coordinator Department of Emergency Management Department of Emergency Management and Homeland Security Electronic Mail Distribution Paul Rubin, (Acting) Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Abdy Khanpour, Vice President Engineering Support Florida Power and Light Company Electronic Mail Distribution Mark E. Warner Vice President, Nuclear Operations South Region Florida Power & Light Company Electronic Mail Distribution Mitch S. Ross Vice President and Associate General Counsel Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi, Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti, Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Richard L. Anderson, Vice President Nuclear Plant Support Florida Power & Light Company Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission 9760 SW 344th St.
Florida City, FL 33035 Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050 Mike A. Shehadeh, P.E.
City Manager City of Homestead Electronic Mail Distribution County Manager of Miami-Dade County 111 NW 1st Street, 29th Floor Miami, FL 33128 Rajiv S. Kundalkar Vice President - Fleet Organizational Support Nuclear Technical Services Florida Power & Light Company Electronic Mail Distribution
FP&L 4
Letter to Mano Nazar from Marvin D. Sykes dated September 1, 2009
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - TURKEY POINT NUCLEAR PLANT Distribution w/encl:
C. Evans, RII EICS L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource Institute of Nuclear Power Operations (INPO)
ROPReports