Mid-cycle Performance Review and Inspection Plan - Turkey Point Nuclear Plant
ML092440414
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/01/2009
From: Marvin Sykes
NRC/RGN-II/DRP/RPB3
To: Nazar M
Florida Power & Light Co
Shared Package
ML092440410 List:
References
Download: ML092440414 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 September 1, 2009 Florida Power and Light Company ATTN: Mr. Mano Nazar, Senior Vice President Nuclear and Chief Nuclear Officer P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - TURKEY POINT NUCLEAR PLANT

Dear Mr. Nazar:

On August 12, 2009, the NRC staff completed its performance review of the Turkey Point Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2008 through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Turkey Point Units 3 and 4 was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to security scheduled through December 31, 2010. In addition to ROP baseline inspection activities, we also plan on conducting several infrequently performed inspections, which include Temporary Instruction (TI) 2515/173, Review of the Implementation of the Industry Ground Water Protection Volunteer Initiative; and Operator Licensing Examinations. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

FP&L 2 As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible.

Please contact me at 404-562-4629 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41

Enclosure:

Turkey Point Nuclear Plant Inspection/Activity Plan (09/01/09 - 12/31/10) cc w/encl: (See page 3)

_________________________ G SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE SON JDH5 MDS NAME SNinh JHamman MSykes DATE 09/01 /2009 09/01/2009 09/01/2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO FP&L 3 cc w/encl:

Alison Brown, Nuclear Licensing William A. Passetti, Chief Florida Power & Light Company Florida Bureau of Radiation Control Electronic Mail Distribution Department of Health Electronic Mail Distribution McHenry Cornell, Director Licensing and Performance Improvement Craig Fugate, Director Florida Power & Light Company Division of Emergency Preparedness Electronic Mail Distribution Department of Community Affairs Electronic Mail Distribution Michael Kiley, Site Vice President Turkey Point Nuclear Plant Richard L. Anderson, Vice President Florida Power and Light Company Nuclear Plant Support Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution Niel Batista Emergency Management Coordinator Senior Resident Inspector Department of Emergency Management U.S. Nuclear Regulatory Commission Department of Emergency Management Turkey Point Nuclear Generating Station and Homeland Security U.S. Nuclear Regulatory Commission Electronic Mail Distribution 9760 SW 344th St.

Florida City, FL 33035 Paul Rubin, (Acting) Plant General Manager Turkey Point Nuclear Plant Attorney General Florida Power and Light Company Department of Legal Affairs Electronic Mail Distribution The Capitol PL-01 Tallahassee, FL 32399-1050 Abdy Khanpour, Vice President Engineering Support Mike A. Shehadeh, P.E.

Florida Power and Light Company City Manager Electronic Mail Distribution City of Homestead Electronic Mail Distribution Mark E. Warner Vice President, Nuclear Operations County Manager of Miami-Dade County South Region 111 NW 1st Street, 29th Floor Florida Power & Light Company Miami, FL 33128 Electronic Mail Distribution Rajiv S. Kundalkar Mitch S. Ross Vice President - Fleet Organizational Vice President and Associate General Support Counsel Nuclear Technical Services Florida Power & Light Company Florida Power & Light Company Electronic Mail Distribution Electronic Mail Distribution Marjan Mashhadi, Senior Attorney Florida Power & Light Company Electronic Mail Distribution

FP&L 4 Letter to Mano Nazar from Marvin D. Sykes dated September 1, 2009

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - TURKEY POINT NUCLEAR PLANT Distribution w/encl:

C. Evans, RII EICS L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource Institute of Nuclear Power Operations (INPO)

ROPReports