Letter Sequence RAI |
|---|
TAC:MD7178, Control Room Habitability (Approved, Closed) |
|
MONTHYEAR0CAN020701, Supplemental Response to GL 2003-01 Regarding Control Room Habitability2007-02-14014 February 2007 Supplemental Response to GL 2003-01 Regarding Control Room Habitability Project stage: Request L-2007-087, Proposed License Amendment, Alternative Source Term and Conforming Amendment2007-07-16016 July 2007 Proposed License Amendment, Alternative Source Term and Conforming Amendment Project stage: Other 1CAN100703, License Amendment Request - Technical Specification Changes and Analyses Relating to Use of Alternate Source Term2007-10-22022 October 2007 License Amendment Request - Technical Specification Changes and Analyses Relating to Use of Alternate Source Term Project stage: Request ML0805104412008-02-27027 February 2008 Request for Additional Information Regarding Implementation of an Alternate Source Term Project stage: RAI 1CAN030801, License Amendment Request, Technical Specification Changes Regarding Reactor Building Spray Nozzle Test Requirements2008-03-13013 March 2008 License Amendment Request, Technical Specification Changes Regarding Reactor Building Spray Nozzle Test Requirements Project stage: Request 2CAN030805, Cycle 20 Core Operating Limits Report (COLR)2008-03-27027 March 2008 Cycle 20 Core Operating Limits Report (COLR) Project stage: Request 1CAN040802, Supplement to Amendment Request Regarding Technical Specification Changes and Analyses Relating to Use of Alternate Source Term2008-04-0303 April 2008 Supplement to Amendment Request Regarding Technical Specification Changes and Analyses Relating to Use of Alternate Source Term Project stage: Supplement 1CAN080801, Response to Request for Additional Information Regarding Technical Specification Changes and Analyses Relating to Use of Alternate Source Term2008-08-14014 August 2008 Response to Request for Additional Information Regarding Technical Specification Changes and Analyses Relating to Use of Alternate Source Term Project stage: Response to RAI 1CAN090802, Response to Request for Additional Information Regarding Technical Specification Changes and Analyses Relating to Use of Alternate Source Term2008-09-18018 September 2008 Response to Request for Additional Information Regarding Technical Specification Changes and Analyses Relating to Use of Alternate Source Term Project stage: Response to RAI ML0920902492009-07-31031 July 2009 Individual Plant Actions PWROG Topical Report BAW-2374, Rev. 2, Risk-Informed Assessment of Once-Through Steam Generator Tube Thermal Loads Due to Breaks in Reactor Coolant System Upper Hot Leg Large-Bore Piping Project stage: Approval ML0923901842009-08-27027 August 2009 Request for Additional Information Email Regarding License Amendment Request to Support the Adoption and Use of the Alternate Source Term in the ANO-1 Safety Analyses Project stage: RAI 1CAN080903, Updated Information Regarding Technical Specification Changes and Analyses Relating to Use of Alternate Source Term in Reference to Nrc/Pwrog Meeting Held June 25, 20092009-08-31031 August 2009 Updated Information Regarding Technical Specification Changes and Analyses Relating to Use of Alternate Source Term in Reference to Nrc/Pwrog Meeting Held June 25, 2009 Project stage: Meeting 1CAN080902, Response to Request for Information Regarding Steam Generator Tube Integrity During Break in Upper Hot Leg Piping2009-08-31031 August 2009 Response to Request for Information Regarding Steam Generator Tube Integrity During Break in Upper Hot Leg Piping Project stage: Response to RAI ML0927400352009-10-21021 October 2009 Issuance of Amendment No. 238, Modify Technical Specifications Related to Use of Alternate Source Term Associated with Accident Offsite/Control Room Dose Consequences Project stage: Approval 1CAN100903, Supplemental to Response to Request for Information Regarding Steam Generator Tube Integrity During Break in Upper Hot Leg Piping2009-10-26026 October 2009 Supplemental to Response to Request for Information Regarding Steam Generator Tube Integrity During Break in Upper Hot Leg Piping Project stage: Supplement ML0930104342009-11-0404 November 2009 Once-Through Steam Generator Tube Loads Under Conditions Resulting from Postulated Breaks in Reactor Coolant System Upper Hot Leg Large-Bore Piping Project stage: Approval 1CAN011004, Summary of Analysis Related to ANO-1 Once-Through Steam Generator Tube Thermal Loads Due to Breaks in RCS Upper Hot Leg Large-Bore Piping2010-01-26026 January 2010 Summary of Analysis Related to ANO-1 Once-Through Steam Generator Tube Thermal Loads Due to Breaks in RCS Upper Hot Leg Large-Bore Piping Project stage: Other 2008-08-14
[Table View] |
Text
From:
Wang, Alan Sent:
Thursday, August 27, 2009 8:49 AM To:
BICE, DAVID B Cc:
Lent, Susan; Burkhardt, Janet
Subject:
Request for Additional Information Regarding Arkansas Nuclear One, Unit 1 Alternate Source Term License Amendment Request (MD7178)
- Dave, By letter dated October 22, 2007, (Agencywide Documents Access & Management System (ADAMS) Accession No. ML073030537), as supplemented by letters dated April 3, 2008, and August 14, 2008 (Accession Nos. ML081000590 and ML082280106, respectively), Entergy Operations, Inc. (the licensee), submitted a license amendment request (LAR) to support the adoption of and use of the Alternate Source Term in the Arkansas Nuclear One, Unit 1 (ANO-1)
Safety Analyses.
The US Nuclear Regulatory Commission (NRC) staff has determined that the following additional information is needed to complete its review of the subject license amendment request for ANO-1. This request was discussed with David Bice of your staff on August 25, 2009, and it was agreed that a response would be provided within 30 days of receipt of this email. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1445 or via e-mail at Alan.Wang@nrc.gov.
REQUEST FOR ADDITIONAL INFORMATION
- 1. Are there any electrical non-safety related systems and components credited in the alternate source term analyses?
If so, a) Describe how this system will be electrically separated from the safety-related system (i.e., provide a detailed discussion on how a fault on the non-Class 1E electrical circuit will not propagate to the Class 1E electrical circuit).
b) Describe the independence (e.g., electrical and physical separation) and redundancy of these systems.
c) Describe how these systems meet the single failure criterion.
d) Describe how the operators will be notified in the event that these systems and components would become inoperable (e.g., control room annuciators).
e) Describe any impacts on seismic qualifications of these systems and components.
- 2.
Are any loads being added to the ANO-1 emergency diesel generators (EDGs)? If so, describe how the loads being added to the EDGs affect the capability and capacity of the EDGs (e.g., describe the impact of the proposed change on the EDG ratings) and provide the loading sequence changes for each EDG.
- 3. Provide a list and description of components being added to your Title 10 to the Code of Federal Regulations Section 50.49 (10 CFR 50.49) program due to this LAR. Confirm that these components are qualified for the environmental conditions they are expected to be exposed to.
- 4.
Are there any changes in the chemical composition of the chemical spray solution as a result of this LAR? If so, provide the chemical composition and provide a detailed evaluation to show the components are qualified for the environmental conditions they are expected to be exposed to. Also, describe, if any, changes in the operation of the chemical spray system and its impact on the environment.