MONTHYEAR2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102203, Cycle 31 Core Operating Limits Report2022-10-24024 October 2022 Cycle 31 Core Operating Limits Report 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 0CAN092201, Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-09-29029 September 2022 Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-09-0808 September 2022 Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN082201, Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-08-24024 August 2022 Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-07-20020 July 2022 Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN072201, Registration of Cask Use2022-07-14014 July 2022 Registration of Cask Use 0CAN062202, Registration of Cask Use2022-06-0909 June 2022 Registration of Cask Use 1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-06-0202 June 2022 Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 1CAN052201, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-0352022-05-31031 May 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-035 2024-01-17
[Table view] |
Text
- gr Entergy Operations, Inc.
1448 SR. 333
~En teray Russellville, AR 72802 Tel 479-858-4601 Thomas A. Marlow Director, Nuclear Safety Assurance oCANO.2o7o ,1 Febrary14,20 07)-
U.S :Nullear 'Regilatory commission Attn. Docduernt Control Desk' .. A.
Washington, DC 20555
SUBJECT:
! Supplemental Response to GL 2003-01 Regarding Control Room Habitability Arkansas Nuclear One, Units 1 and 2 Docket Nos:-50.-313 and 60-368 License Nos.ý DPR-51 and. NPF-6 I , ."
REFERENCES 1 NRC letter date'dJ'une-612, "2003,' Gerneric Letter 2003-01, Control Room Habitability(0CNA060308) "
2 Entergy letter dated August 28, 2003, Response to Generic Letter 2003-01 (0CAN080304) 3 Entergy letter dated June 24, 2004, Proposed OperatingLicense Amendment for Revised ANO-I Control Room HabitabilityAnalysis (1CAN060401) 4 Entergy letter dated May 6, 2006, Withdrawal of Proposed Operating License Amendment for Revised ANO-1 Control Room Habitability Analysis (1 CAN050601) 5 Federal Register Notice datediJanuary 17, 2007, Notice of Availability of Technical Specification Improvement To Modify Requirements Regarding Control Room Envelope Habitability Using the
- ConsolidatedLine Item Improvement Process (FRN Federal Register; VoL 72, No. 10, page 2022)
Dear Sir or Madam:
On-June 12, 2003,-the NRC issued Generic Letter (GL) 2003-01 (Reference 1). Entergy submitted the response to the generic letter for Arkansas Nuclear One, Unit 1 (ANO-1) and Unit 2 (ANO-2) on August 28, 2003 (Reference 2)' As discussed in our response, the ANO-1 and ANO-2 control rooms share a common control room envelope (CRE). Based on CRE testing conducted in 2001, the ANO-1 CRE unfiltered inleakage value was in excess of the analytical dose acceptance limits. Therefore, compensatory measures to reduce doses to the control room operators to within General Design Criterion (GDC) 19 limits were established through the use of potassium iodide in the event of an accident.
/ý/O2.
ailt A I
51" '7'
0CAN020701 Page 2 of 3 In Reference 2, Entergy had also committed to submit revised dose calculations to eliminate these compensatory actions for compliance with GDC 19. On June 24, 2004, Entergy submitted a proposed license amendment using the guidance of Regulatory Guide 1.195 to increase the allowed radiological unfiltered in-leakage into the control room (Reference 3). As discussed in our response to the generic letter, Entergy used an approach consistent with the ANO-I's licensing basis for the maximum hypothetical accident. However, based on subsequent discussions with the NRC staff, Entergy withdrew the license amendment and stated that we would pursue alternate means for providing margin to the tested inleakage values for compliance with GDC 19.
Entergy has subsequently elected to pursue an alternate source term (AST) methodology approach to increase the allowed inleakage analytical limits for both units. Even though the control room measured inleakage is within the ANO-2 GDC 19 radiological analysis, additional margin is desirable for future inleakage testing. Entergy is in the process of final contract development for performing the AST analysis. The schedule for completion of the AST analyses is being staggered, with ANO-1 being completed in September 2007, while the ANO-2 analysis will be completed in 2008. Therefore, based on the current schedule for completion of the ANO-1 AST analysis, Entergy is committing to submit a proposed license amendment for ANO-1 using AST methodologies by October 31, 2007.
Additionally in response to GL 2003-01, Entergy committed to submit a proposed license amendment consistent with the NRC approved guidance of Technical Specification Task Force (TSTF)-448 within six months of its availability under the Consolidated Line Item Improvement Process (CLIIP). On January 17, 2007, the NRC issued a notice in the Federal Register (Reference 5) regarding the availability of TSTF-448, Revision 3, as a CLIIP. Therefore, under our current committed schedule, Entergy would be required to submit a license amendment by mid-July, 2007. However, under the new TSTF-448 requirements, a control room envelope which has been discovered to be in noncompliance to its GDC 19 analytical dose acceptance criteria would be required to shutdown the unit within 90 days. To avoid this condition, Entergy will need to defer our commitment and request NRC approval for both the TSTF-448 and the ANO-1 AST based license amendments on a corresponding schedule. Additionally, since the ANO-1 and ANO-2 control rooms share a common envelope, implementation of TSTF-448 for ANO-2 will need to be implemented on the same schedule as ANO-1. Therefore, Entergy will submit license amendment requests for the adoption of TSTF-448 for both ANO units concurrent with the AST license amendment request for ANO-1. Since ANO-2 control room meets its design basis allowable inleakage, the ANO-2 AST license amendment can be processed on a schedule separate from the other proposed license amendments.
Commitments being made for this supplemental response to GL 2003-01 are contained in the attachment to this letter. These revised commitments and schedules were discussed with the NRC staff during a conference call on January 26, 2007. If you have any questions or require additional information, please contact Steve Bennett at 479-858-4626.
1 declare under penalty of perjury that the foregoing is true and correct. Executed on February 14, 2007.
Sincerely, T /b
0CAN020701 Page 3 of 3
Attachment:
List of Regulatory Commitments cc: Dr. Bruce S. Malleft Regional Administrator.
U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Ms. Farideh Saba MS 0-7 D1 Washington, DC 20555-0001 Mr. Bernard R. Bevill Director Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street Little Rock, AR 72205
Attachment to OCAN020701 List of Regulatory Commitments
a Attachment to OCAN020701 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE (Check one) SCHEDULED COMPLETION COMMITMENT DATE (If Required)
ONE-TIME CONTINUING ACTION COMPLIANCE Entergy will submit a proposed license amendment X By October for ANO-1 using alternate source term 31, 2007 methodologies to eliminate the existing control room envelope compensatory measures Entergy will submit proposed license amendments X By October for ANO-1 and ANO-2 in accordance with 31, 2007 TSTF-448, Revision 3