Withdrawal of Requested Licensing Action, Relief Request RBS-ISI-012 to Extend Second Inservice Inspection Interval for Examinations
ML092360516
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/24/2009
From: Wang A
Plant Licensing Branch IV
To:
Entergy Operations
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC ME1508
Download: ML092360516 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 24, 2009 Vice President, Operations Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION, UNIT 1 - WITHDRAWAL OF REQUESTED LICENSING ACTION RE: RELIEF REQUEST RBS-ISI-012 (TAC NO. ME1508)

Dear Sir or Madam:

By letter dated June 16, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML091740306), as supplemented on August 4,2009 (ADAMS Accession No. ML092170763), Entergy Operations, Inc. (Entergy, the licensee), submitted relief request RBS-ISI-012 for the River Bend Station, Unit 1 (RBS). The proposed relief request would extend the second inservice inspection interval for examinations under the American Society of Mechanical Engineers (ASME) Examination Categories B-J, C-F-1, and C-F-2 to the end of the 16th refueling outage.

By letter dated August 21,2009 (ADAMS Accession No. ML092360666), you requested to withdraw the application from Nuclear Regulatory Commission (NRC) review. The NRC acknowledges your request to withdraw the application. NRC staff activities on the review have ceased and the associated Technical Assignment Control number has been closed If you have any questions, please contact me at (301) 415-1445.

Sincerely,

~~J~.

Alan B. Wang, ProjJd Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458 cc: Distribution via Listserv

September 24, 2009 Vice President, Operations Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION, UNIT 1 - WITHDRAWAL OF REQUESTED LICENSING ACTION RE: RELIEF REQUEST RBS-ISI-012 (TAC NO. ME1508)

Dear Sir or Madam:

By letter dated June 16, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML091740306), as supplemented on August 4,2009 (ADAMS Accession 1\10. ML092170763), Entergy Operations, Inc. (Entergy, the licensee), submitted relief request RBS-ISI-012 for the River Bend Station, Unit 1 (RBS). The proposed relief request would extend the second inservice inspection interval for examinations under the American Society of Mechanical Engineers (ASME) Examination Categories B-J, C-F-1, and C-F-2 to the end of the 16th refueling outage.

By letter dated August 21, 2009 (ADAMS Accession No. ML092360666), you requested to withdraw the application from Nuclear Regulatory Commission (NRC) review. The NRC acknowledges your request to withdraw the application. NRC staff activities on the review have ceased and the associated Technical Assignment Control number has been closed.

If you have any questions, please contact me at (301) 415-1445.

Sincerely, IRA!

Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrLAJBurkhardt Resource LPLIV r/f RidsNrrPMRiverBend Resource RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsNrrDciCpnb Resource RidsRgn4MailCenter Resource RidsNrrDorlDpr Resource TChan, NRR/DCI/CPNB RidsNrrDorlLpl4 Resource JCollins, NRR/DCI/CPNB ADAMS Accession No ML092360516 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NRR/LPL4/PM NAME ABWang JBurkhardt MMarkley ABWang DATE 9/15/09 9/11/09 9/23/09 9/24/09 OFFICIAL RECORD COpy