ML092180026
| ML092180026 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 05/19/2008 |
| From: | Operations Branch III |
| To: | Exelon Generation Co |
| References | |
| ES-301-1, ES-301-2 | |
| Download: ML092180026 (6) | |
Text
ES-301 Administrative Topics Outline Form ES-301-1 Facility: Byron 2008 Exam Date of Examination: 5/19/08 Examination Level: RO SRO Operating Test Number: _2008301__
Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations -
Manually Calculate SG Pri-Sec Tube Leakage N, S or R Ability to recognize indications for system operating parameters which are entry-level conditions for technical specifications. K/A 2.1.33 Imp Factor 3.4 Equipment Control -
Write a Clearance Order for approval N
Knowledge of Tagging and Clearance Procedures.
K/A 2.2.13 Imp Factor 3.6 Radiation Control -
Respond to GDT High Activity D
Ability to perform procedures to reduce excessive levels of radiation and guard against personnel exposure.
K/A 2.3.10 Imp Factor 2.9 Emergency Procedures/Plan Respond to Turbine Bldg Fire N
Knowledge of Fire Protection Procedures.
K/A 2.4.25 Imp Factor 3.3 NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Byron Station Date of Examination: 5/19/08 Exam Level: RO SRO-I SRO-U Operating Test No.: _2008301______
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- a. Respond to an ATWS situation K/A 013 A4.01 Imp Factor 4.5/4.8 D, EN, A 1
- b. Initiate a 60 PPM Dilution K/A 004A4.07 Imp Factor 3.9/3.7 D, S 2
- c. Respond to a Pzr Press Control Malf K/A 010A4.01 Imp Factor 3.7/3.5 D, S 3
- d. Respond High RCP Seal Leakoff Flow K/A 003 A2.01 Imp Factor 3.5/3.9 P, M, A, S 4
- e. Start the 1B Cnmt Chiller Remotely K/A 022A4.02 Imp Factor 3.2/3.1 N, S, L 5
- f. Start and Load the 1A D/G K/A 064A2.09 Imp Factor 3.1/3.3 D, A, S 6
- g. Start Post Loca Cnmt H2 Monitoring Sys.K/A029A2.04 Imp Factor 2.5/3.2 N, S, EN 8
- h. Release Unit 1 Cnmt K/A 071A4.26 Imp Factor 3.1/3.9 N, A, S 9
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. Start CC Hx Outlet Rad Monitor 2PR09J K/A 073 G2.1.30 Imp Factor 3.9/3.4 D
7
- j. Parallel DC Busses (one bus de-energized) K/A 058AA1.01 Imp Factor 3.4/3.5 D, E 5
- k. Emergency Start 2B AF pump K/A 061A2.04 Imp Factor 3.4/3.8 D, A, R, E 4
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety featu (L)ow-Power / Shutdown re (N)ew or (M)odified (P)revious 2 exams from bank including 1(A)
(R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1
- / - / 1 (
1 / 1 / 1 control room system) 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1
ES-301 Administrative Topics Outline Form ES-301-1 Facility: ___Byron 2008 Exam______________
Date of Examination:
5/19/08__
Examination Level: RO SRO Operating Test Number: _2008301__
Administrative Topic Co e*
Describe activity to be performed (see Note)
Type d
Conduct of Operations -
Initiate 1BOL 9.3 for failed N
Ability to apply te or a system. KA source range detector chnical specifications f 2.1.12 Imp Factor 4.0 (CFR 43.2 / 43.5 / 45.3)
Conduct of Operations -
Review Manual Calculation of SG Pri-Sec Tube Leakage N, S or R A
g technical spe Factor 3.5 bility to recognize indications for system operatin parameters which are entry-level conditions for cifications. K/A 2.1.33 Imp (CFR: 43.2 / 43.3 / 45.3)
Equipment Control -
Review a Clearance Order for N
Knowledge rocedures.
K
.8 (CFR: 41.10 / 45.13) approval of Tagging and Clearance P
/A 2.2.13 Imp Factor 3 Radiation Control -
Review a Liquid Release Package for release approval N
approving relea Imp Factor 3.1 (CFR: 43.4 / 45.10)
Knowledge of the requirements for reviewing and se permits. KA 2.3.6 Emergency Procedures/Plan -
re a PBI permit N
Knowledge of fire prot dures. KA 2.4.25 Imp (CFR: 41.10 / 45.13)
Prepa ection proce Factor 3.4 NOTE:
only 4 items unless they are retaking only the administrative topics, when all 5 are required.
All items (5 total) are required for SROs. RO applicants require
- Type Codes & Criteria:
(P)revious 2 exams ( 1; randomly selected)
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 f (N)ew or (M)odified from bank ( 1)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Byron Station Date of Examination: 5/19/08 Exam Level: RO SRO-I SRO-U Operating Test No.: _2008301______
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- a. Respond to an ATWS situation K/A 013 A4.01 Imp Factor 4.5/4.8 D, EN, A 1
- b. Initiate a 60 PPM Dilution K/A 004A4.07 Imp Factor 3.9/3.7 D, S 2
- c.
- d. Respond High RCP Seal Leakoff Flow K/A 003 A2.01 Imp Factor 3.5/3.9 P, M, A, S 4
- e. Start the 1B Cnmt Chiller Remotely K/A 022A4.02 Imp Factor 3.2/3.1 N, S, L 5
- f. Start and Load the 1A D/G K/A 064A2.09 Imp Factor 3.1/3.3 D, A, S 6
- g. Start Post Loca Cnmt H2 Monitoring Sys.K/A029A2.04 Imp Factor 2.5/3.2 N, S, EN 8
- h. Release Unit 1 Cnmt K/A 071A4.26 Imp Factor 3.1/3.9 N, A, S 9
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. Start CC Hx Outlet Rad Monitor 2PR09J K/A 073 G2.1.30 Imp Factor 3.9/3.4 D
7
- j. Parallel DC Busses (one bus de-energized) K/A 058AA1.01 Imp Factor 3.4/3.5 D, E 5
- k. Emergency Start 2B AF pump K/A 061A2.04 Imp Factor 3.4/3.8 D, A, R, E 4
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1
- / - / 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1 ES-301 Administrative Topics Outline Form ES-301-1
Facility: ___Byron 2008 Exam_________________
Date of Examination: 5/19/08__
Examination Level: RO SRO Operating Test Number: __2008301_
Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations -
Initiate 1BOL 9.3 for failed source range detector N
Ability to apply technical specifications for a system. KA 2.1.12 Imp Factor 4.0 (CFR 43.2 / 43.5 / 45.3)
Conduct of Operations -
Review Manual Calculation of SG Pri-Sec Tube Leakage N, S or R Ability to recognize indications for system operating parameters which are entry-level conditions for technical specifications. K/A 2.1.33 Imp Factor 3.5 (CFR: 43.2 / 43.3 / 45.3)
Equipment Control -
Review a Clearance Order for approval N
Knowledge of Tagging and Clearance Procedures.
K/A 2.2.13 Imp Factor 3.8 (CFR: 41.10 / 45.13)
Radiation Control -
Review a Liquid Release Package for release approval N
Knowledge of the requirements for reviewing and approving release permits. KA 2.3.6 Imp Factor 3.1 (CFR: 43.4 / 45.10)
Emergency Procedures/Plan -
Prepare a PBI permit N
Knowledge of fire protection procedures. KA 2.4.25 Imp Factor 3.4 (CFR: 41.10 / 45.13)
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Byron Station Date of Examination: 5/19/08 Exam Level: RO SRO-I SRO-U Operating Test No.: _2008301_____
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- a.
- b. Initiate a 60 PPM Dilution K/A 004A4.07 Imp Factor 3.9/3.7 D, S 2
- c.
- d. Respond High RCP Seal Leakoff Flow K/A 003 A2.01 Imp Factor 3.5/3.9 P, M, A, S 4
- e.
- f.
- g. Start Post Loca Cnmt H2 Monitoring Sys.K/A029A2.04 Imp Factor 2.5/3.2 N, S, EN 8
- h.
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i.
- j. Parallel DC Busses (one bus de-energized) K/A 058AA1.01 Imp Factor 3.4/3.5 D, E 5
- k. Emergency Start 2B AF pump K/A 061A2.04 Imp Factor 3.4/3.8 D, A, R, E 4
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1
- / - / 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1