Exelon Nuclear Job Performance Measure STARTUP OF A SECOND RECIRCULATION PUMP WITH FAILURE OF THE DISCHARGE VALVE TO OPEN JPM Number: S-N-a Revision Number: 02 Date: 09/08 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 01 Bank JPM.
Revision 02 Revised for 2009 NRC Exam.
S-N-a Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to an IC with the Reactor in cold shutdown.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Trip the 2B Recirc Pump.
- 3. Close the 2B Recirc Pump discharge valve (MO 2-202-5B) and return c/s to NORMAL.
- 4. Insert following Malfunctions and/or Remotes:
- IOR RRD5BCLS CLOSE
- IOR RRD5BOPN OFF
- IOR RRD5BJP5 OFF
- IOR RRD5BJ1P OFF
- 5. Place the Recirc Pumps in individual manual control.
- 6. Complete DOP 0202-01 up through Step G.5.
- 7. Verify Individual Recirc Controllers are set to Minimum.
- 8. Verify RPV water level > 30 inches and stable.
- 9. Place DW/TORUS DP CONTLR PIC 2-1602-14 and DW PRESS CONTLR PIC 2-8540-1 to MANUAL and close the associated valves.
DOCUMENT PREPARATION
- 1.
Mark up a copy of DOP 0202-01 up to and including step G.5.
S-N-a Page 3 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. 2B Recirc Pump was inadvertently tripped one (1) hour ago during testing.
- 3. The immediate actions of DOA 0202-01 have been completed.
- 4. All prerequisites of DOP 0202-01 have been met.
- 5. Seal Purge to the 2B Recirc Pump has been established.
INITIATING CUE
- 1. The Unit Supervisor has directed you to restart the 2B Recirc Pump IAW DOP 0202-01 starting at step G.6.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-a Page 4 of 8
JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the provided copy of DOP 0202-01.
- 1.
Start the 2B MG by holding 2B MG SET DRIVE MOTOR switch in START for 3 seconds.
Turns 2B M-G Set Drive Motor Control switch to START and holds for 3 seconds.
NOTE:
Time Recirc Pump Started: __________.
MG set starts ~8 seconds before pump motor.
Pump start can be verified by Pump DP increasing and/or amps increasing.
- 2.
Observe the following:
2B M-G SET DRIVE MOTOR breaker indicates CLOSED.
2B RECIRC PP SPEED CONTLR, speed indication rises to a peak of 60% to 80%.
2B M-G SET FIELD BKR CLOSES seven seconds after M-G SET DRIVE MOTOR breaker closes.
RECIRC PP SPEED CONTLR speed indication settles out and then decays to approximately 30%.
Observes or monitors the following:
2B M-G Set Drive Motor Blue On light illuminated.
Monitors speed on Percent speed meter.
MG Field breaker Blue Closed light illuminated.
Monitors speed on Percent speed meter.
NOTE:
IF dual valve position indication is NOT obtained within 2 minutes of pump start, THEN trip the Recirc Pump.
S-N-a Page 5 of 8
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment CUE:
Respond as needed, as the NLO in the field.
- 3.
While observing APRM response AND Recirc loop flow indications after each individual open step (jog),
perform the following:
- Open, MO 2-202-5B, 2B PP DISCH VLV, just to the point of dual valve position indication.
Attempts to OPEN MO 2-202-5B, 2B PP DISCH VLV by either or both of the following:
Jog open by using 2B PP DISCH VLV Jog control.
OR Throttling open with 2B PP DISCH VLV c/s.
BEGIN ALTERNATE PATH NOTE:
The MO 2-202-5B, 2B PP DISCH VLV, will NOT OPEN.
- 4.
If dual valve position indication is NOT obtained within 2 min of pump start, THEN trip the recirc pump.
Trips 2B Recirc Pump within 2 min of pump start.
(not MG start)
NOTE:
Time Recirc Pump Secured: __________ (Pump must be tripped within 2 minutes of pump start).
- 5.
Reports to the Unit 2 Supervisor that the MO 2-202-5B, 2B PP DISCH VLV, did not have dual indication and the 2B Recirc Pump was tripped.
Unit 2 Supervisor notified.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-a Page 6 of 8
S-N-a Page 7 of 8 Operators Name:
Job
Title:
Title:
Startup of a second Recirculation Pump with failure of the discharge valve to open.
Revision Number: 02 JPM Number: S-N-a Task Number and
Title:
202L002, Perform a Unit 2 Recirculation system startup.
K/A Number and Importance: 202001.A4.01 3.7 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 14 minutes Actual Time Used:
minutes
References:
DOP 0202-01, rev 58 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. 2B Recirc Pump was inadvertently tripped one (1) hour ago during testing.
- 3. The immediate actions of DOA 0202-01 have been completed.
- 4. All prerequisites of DOP 0202-01 have been met.
- 5. Seal Purge to the 2B Recirc Pump has been established.
INITIATING CUE
- 1. The Unit Supervisor has directed you to restart the 2B Recirc Pump IAW DOP 0202-01 starting at step G.6.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-a Page 8 of 8
Exelon Nuclear Job Performance Measure PLACE A FRV IN SERVICE IN AUTO DURING UNIT STARTUP JPM Number: S-N-b Revision Number: 03 Date: 09/08 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 02 Bank JPM.
Revision 03 Revised for 2009 NRC Exam.
S-N-b Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to IC 08.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Verify BOTH FW REG ISOL VALVES are OPEN:
- MO 3206A
- MO 3206B
- 3. Verify 2A & 2B REG VLV CONTROL STATIONS in MAN and CLOSED.
- 4. Verify MASTER CONTROL STATION is in MAN.
- 5. Low Flow Reg Valve is controlling level at 30 in AUTO.
- 6. Insert following Malfunctions and/or Remotes:
- None.
- 7. Setup the following Triggers:
- None.
DOCUMENT PREPARATION
- 1.
Clean copy of DOP 0600-06.
S-N-b Page 3 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit Startup is in progress.
- 3. The FWLCS is controlling level with the Low Flow Reg Valve.
- 4. 2A & 2B REG VLV CONTROL STATIONS are closed in manual mode.
- 5. 2A & 2B FRVs have been pre-operationally tested.
INITIATING CUE
- 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600-06 per step G.2.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-b Page 4 of 8
JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the provided copy of DOP 0600-06.
- 1.
Verify 2A and 2B FWRVs have been pre-operationally tested per Step G.1.
Condition met in initial conditions.
- 2.
Verify the following valves are open:
MO 2-3205A, FW LINE STOP.
MO 2-3205B, FW LINE STOP.
MO 2-3206A, 2A FW REG ISOL.
MO 2-3206B, 2B FW REG ISOL.
GREEN lights illuminated on the following:
MO 2-3205A MO 2-3205B MO 2-3206A MO 2-3206B
- 3.
Adjust MASTER CONTROL STATION OR RX LO FLOW CONTROL STATION, setpoint to match actual RPV level.
Depresses appropriate pushbutton to verify setpoint to match actual RPV level on MASTER CONTROL STATION OR RX LO FLOW CONTROL STATION.
- 4.
Select appropriate FWLCS RPV level signal per Section G.17.
Depresses appropriate FWLCS RPV level signal pushbutton.
- 5.
Place RX LO FLOW CONTROL STATION to AUTO.
Verifies AUTO light illuminated on RX LO FLOW CONTROL STATION.
- 6.
Place one REG VLV CONTROL STATION in AUTO.
Depresses AUTO pushbutton on 2B REG VLV CONTROL STATION.
S-N-b Page 5 of 8
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 7.
Verify other REG VLV CONTROL STATION in MAN.
Verifies MAN light illuminated on 2A REG VLV CONTROL STATION.
- 8.
Place MASTER CONTROL STATION in AUTO.
Depresses AUTO pushbutton on FWLC MASTER CONTROL STATION.
NOTE:
The LOW FLOW FWRV will automatically transfer to the 2B FWRV when the LOW FLOW FWRV position is 85% feedwater flow.
- 9.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-b Page 6 of 8
S-N-b Page 7 of 8 Operators Name:
Job
Title:
Title:
PLACE A FRV IN SERVICE IN AUTO DURING UNIT STARTUP Revision Number: 03 JPM Number: S-N-b Task Number and
Title:
259L021, Place FRV in service in AUTO (unit startup).
K/A Number and Importance: 259002.A4.03 3.8 / 3.6 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes
References:
DOP 0600-06, rev 34 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit Startup is in progress.
- 3. The FWLCS is controlling level with the Low Flow Reg Valve.
- 4. 2A & 2B REG VLV CONTROL STATIONS are closed in manual mode.
- 5. 2A & 2B FRVs have been pre-operationally tested.
INITIATING CUE
- 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600-06 per step G.2.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-b Page 8 of 8
Exelon Nuclear Job Performance Measure TURBINE BYPASS VALVE UTILIZATION JPM Number: S-N-c Revision Number: 00 Date: 09/08 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 New JPM created for 2009 NRC Exam.
S-N-c Page 2 of 7
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC with the Reactor shutdown, but at full pressure.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Insert following Malfunctions and/or Remotes:
- None.
- 3. Setup the following Triggers:
- None.
DOCUMENT PREPARATION
- 1.
Clean copy of DGP 02-03 Attachment E (hard card).
S-N-c Page 3 of 7
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred and the Unit Supervisor is anticipating Emergency Depressurization.
INITIATING CUE
- 1. The Unit Supervisor has directed you to utilize the Turbine Bypass valves in anticipation of Emergency Depressurization, in accordance with DGP 02-03 Attachment E (hard card).
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-c Page 4 of 7
JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Examinee should locate the hard card, then provide the included copy.
All the below actions can be performed on either of the Digital EHC control stations.
- 1.
Select <CONTROL>.
Utilizing the trackball controller, clicks on
<CONTROL>.
- 2.
Select <BPV JACK>.
Utilizing the trackball controller, clicks on
<BPV JACK>.
- 3.
Select <Stpt/Ramp>.
Utilizing the trackball controller, clicks on
<STPT/RAMP>.
- 4.
Input 100% for setpoint.
Utilizing the keyboard, enters 100%.
- 5.
Input 100% / min for ramp rate.
Utilizing the keyboard, enters 100%.
- 6.
Select <OK>.
Utilizing the trackball controller, clicks on <OK>.
- 7.
Confirm 100% and 100% /
min have been inputted and select <OK>.
Examinee confirms proper values are inputted and clicks on <OK>.
- 8.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-c Page 5 of 7
S-N-c Page 6 of 7 Operators Name:
Job
Title:
Title:
TURBINE BYPASS VALVE UTILIZATION.
Revision Number: 00 JPM Number: S-N-c Task Number and
Title:
29501LP040, Respond to a Reactor Scram IAW DGP 02-03.
K/A Number and Importance: 241000.A4.06 3.9 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 minutes Actual Time Used:
minutes
References:
DGP 02-03 Attachment E (hard card), rev 81 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred and the Unit Supervisor is anticipating Emergency Depressurization.
INITIATING CUE
- 1. The Unit Supervisor has directed you to utilize the Turbine Bypass valves in anticipation of Emergency Depressurization, in accordance with DGP 02-03 Attachment E (hard card).
- 2. Inform the Unit Supervisor when the task is complete.
S-N-c Page 7 of 7
Exelon Nuclear Job Performance Measure SHUTDOWN THE ISOLATION CONDENSER JPM Number: S-N-d Revision Number: 03 Date: 09/08 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 02 Bank JPM.
Revision 03 Revised for 2009 NRC Exam.
S-N-d Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Verify the Isolation Condenser is in its normal standby lineup.
- 3. Insert following Malfunctions and/or Remotes:
imf ICSPDFT 0.0 This drifts the Isolation Condenser Initiation setpoint to 0.0 psig so it initiates (after a time delay).
- 4. After the Isolation Condenser initiates, delete the drift malfunction dmf ICSPDFT
- 5. Start the 2/3A Iso Cond MU Pump.
- 6. Verify Reactor Pressure is < 1050 psig.
- 7. Verify DAN 902-4 A-15 is illuminated.
- 8. Acknowledge / Reset alarms.
DOCUMENT PREPARATION
- 1.
Clean copy of DOP 1300-02.
S-N-d Page 3 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A pressure transient has occurred which resulted in the AUTO initiation of the Iso Condenser.
- 3. The 2/3A Iso Condenser MU Pump is being used to maintain Iso Condenser level.
- 4. No additional Clean Demin pump(s) were started, due to initiation of the Iso Condenser.
- 5. The transient is over and the Isolation Condenser operation is NO longer required.
INITIATING CUE
- 1. The Unit Supervisor has directed you to shutdown the Isolation Condenser per DOP 1300-02 Step G.13.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-d Page 4 of 8
JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the provided copy of DOP 1300-02.
- 1.
Monitor RPV pressure, level, and reactor power to verify IC operation is NOT required for RPV pressure control.
Verifies IC operation is NOT required for RPV pressure control.
- 2.
Obtain Shift Supervisors approval to shutdown IC.
Condition met in initial conditions.
NOTE:
If examinee asks for approval to shutdown the IC respond as the US and give the permission.
BEGIN ALTERNATE PATH NOTE:
Examinee must decide the procedural paths to take, based on Reactor pressure AND annunciator conditions.
- 3.
Determines RPV pressure.
Determines RPV pressure
<1070 psig and step G.13.d MUST be performed.
- 4.
Identify that 902-4 A-15, ISOL CONDR A/B INITIATION, is in alarm.
Identifies that 902-4 A-15, ISOL CONDR CH A/B INITIATION, is in alarm.
- 5.
- 2. Reset the IC initiation signal at Panel 902-5 as follows:
Rotate ISOL CONDR RESET switch to CH A Rotate ISOL CONDR RESET switch to CH B Resets the IC initiation signal at Panel 902-5 as follows:
Rotates ISOL CONDR RESET switch to CH A Rotates ISOL CONDR RESET switch to CH B S-N-d Page 5 of 8
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Resetting the IC isolation automatically causes MO 2-1301-3 to close.
- 6.
Close/verify closed MO 2-1301-3, RX INLET ISOL, by holding control switch to CLOSE.
GREEN light illuminated.
- 7.
Rotate RX INLET ISOL VLV HAND/RESET switch to RESET.
Rotates RX INLET ISOL VLV HAND/RESET switch to RESET.
- 8.
Verify that MO 2-1301-10 valve is closed.
GREEN light illuminated.
- 9.
Verify that MO 2-4102 valve is closed.
GREEN light illuminated.
- 10. Verify the MO 2-4399-74 valve is closed.
GREEN light illuminated.
- 11. Stop the 2/3A Iso Cond MU Pump.
GREEN light illuminated.
CUE:
If the examinee asks if it is desired to place the Iso Condenser in standby, inform them NOT to place the Iso Condenser in standby.
- 12. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-d Page 6 of 8
S-N-d Page 7 of 8 Operators Name:
Job
Title:
Title:
Shutdown the Isolation Condenser Revision Number: 03 JPM Number: S-N-d Task Number and
Title:
207L002, Operate the Isolation Condenser following an automatic initiation.
K/A Number and Importance: 207000.A4.05 3.5 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 10 minutes Actual Time Used:
minutes
References:
DOP 1300-02, rev 23 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A pressure transient has occurred which resulted in the AUTO initiation of the Iso Condenser.
- 3. The 2/3A Iso Condenser MU Pump is being used to maintain Iso Condenser level.
- 4. No additional Clean Demin pump(s) were started, due to initiation of the Iso Condenser.
- 5. The transient is over and the Isolation Condenser operation is NO longer required.
INITIATING CUE
- 1. The Unit Supervisor has directed you to shutdown the Isolation Condenser per DOP 1300-02 Step G.13.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-d Page 8 of 8
Exelon Nuclear Job Performance Measure VERIFY SPURIOUS GROUP 3 ISOLATION - INCOMPLETE JPM Number: S-N-e Revision Number: 00 Date: 09/08 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 Modified from a different JPM.
S-N-e Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any shutdown IC.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Insert a spurious Group 3 isolation.
- 3. Manually OPEN the following valves (ensure can be re-closed):
- MO 2-1001-4A
- MO 2-1001-5A DOCUMENT PREPARATION
- 1.
Clean copy of DAN 902-5 D-5 Hard Card.
S-N-e Page 3 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A spurious Group 3 isolation has occurred.
INITIATING CUE
- 1. The Unit Supervisor has directed you to verify the Group 3 isolation is complete, utilizing the hard card.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-e Page 4 of 8
JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Examinee should locate the hard card, then provide the included copy.
The following steps may be performed in any order.
- 1.
Examinee verifies CLOSED MO 2-1201-1.
RED light illuminated.
- 2.
Examinee verifies CLOSED MO 2-1201-1A.
RED light illuminated.
- 3.
Examinee verifies CLOSED MO 2-1201-2.
RED light illuminated.
- 4.
Examinee verifies CLOSED MO 2-1201-3.
RED light illuminated.
- 5.
Examinee verifies CLOSED MO 2-1201-7.
RED light illuminated.
- 6.
Examinee verifies CLOSED MO 2-1001-1A.
RED light illuminated.
- 7.
Examinee verifies CLOSED MO 2-1001-1B.
RED light illuminated.
- 8.
Examinee verifies CLOSED MO 2-1001-2A.
RED light illuminated.
- 9.
Examinee verifies CLOSED MO 2-1001-2B.
RED light illuminated.
- 10. Examinee verifies CLOSED MO 2-1001-2C.
RED light illuminated.
S-N-e Page 5 of 8
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment BEGIN ALTERNATE PATH
- 11. Examinee verifies CLOSED MO 2-1001-4A.
Examinee recognizes that MO 2-1001-4A did NOT close.
- 12. Examinee CLOSES MO 2-1001-4A.
Takes manual action for failed auto action by placing MO 2-1001-4A, c/s in the CLOSED position.
- 13. Examinee verifies CLOSED MO 2-1001-4B.
RED light illuminated.
- 14. Examinee verifies CLOSED MO 2-1001-4C.
RED light illuminated.
- 15. Examinee verifies CLOSED MO 2-1001-5A.
Examinee recognizes that MO 2-1001-5A did NOT close.
- 16. Examinee CLOSES MO 2-1001-5A.
Takes manual action for failed auto action by placing MO 2-1001-5A, c/s in the CLOSED position.
- 17. Examinee verifies CLOSED MO 2-1001-5B.
RED light illuminated.
- 18. Informs Unit Supervisor task is complete.
Reports Group 3 complete and MO 2-1001-4A and 2-1001-5A failed to close automatically.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-e Page 6 of 8
S-N-e Page 7 of 8 Operators Name:
Job
Title:
Title:
Verify Spurious Group 3 Isolation - Incomplete Revision Number: 00 JPM Number: S-N-e Task Number and
Title:
295L022, Initiate/Verify automatic actuations of Emergency Systems.
K/A Number and Importance: 223002.A4.01 3.6 / 3.5 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 5 minutes Actual Time Used:
minutes
References:
DAN 902-5 D-5 (hard card), rev 13 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A spurious Group 3 isolation has occurred.
INITIATING CUE
- 1. The Unit Supervisor has directed you to verify the Group 3 isolation is complete, utilizing the hard card.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-e Page 8 of 8
Exelon Nuclear Job Performance Measure TRANSFER POWER TO TR-22 FROM TR-21 JPM Number: S-N-f Revision Number: 01 Date: 09/08 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Revised for 2009 NRC Exam.
S-N-f Page 2 of 9
SIMULATOR SETUP INSTRUCTIONS
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Insert following Malfunctions and/or Remotes:
- None.
- 3. Setup the following Triggers:
- None.
- 4. Ensure ONLY 2 RFPs operating.
- 5. Ensure ONLY 3 Cond/Cond Booster Pumps operating.
DOCUMENT PREPARATION
- 1.
Marked up copy of DOP 6500-01.
S-N-f Page 3 of 9
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
- 3. The NLO, dispatched to TR-21, reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
- 4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
- 5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.
INITIATING CUE
- 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-f Page 4 of 9
JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the provided copy of DOP 6500-01.
This task has two parts, which can be performed in any order.
CUE:
IF the incoming and running voltages are NOT approximately equal, inform examinee that they ARE approximately equal.
TRANSFER BUS 21 TO TR-22
- 1.
Position TR-22 to Bus 21 SYNCHROSCOPE selector switch to ON.
Switch in ON position.
- 2.
Verify:
INCOMING VOLTS and RUNNING VOLTS meters approximately equal.
SYNCHRONIZING meter at 12 oclock position and NOT rotating.
SYNCHRONIZING meter lights NOT glowing.
Voltages approximately equal.
Meter NOT rotating.
White lights extinguished.
- 3.
Position TR-22 to Bus 21 breaker control switch to CLOSE.
RED light illuminated.
- 4.
Verify:
SYNCHRONIZING meter at 12 oclock position.
TR-22 to Bus 21 breaker indicates CLOSED.
Annunciator 902-8 D-1 in alarm.
Meter NOT rotating.
RED light illuminated.
Annunciator 902-8 D-1 illuminated.
S-N-f Page 5 of 9
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 5.
Position TR-21 to Bus 21 breaker control switch to TRIP.
GREEN light illuminated.
- 6.
Verify:
TR-21 to Bus 21 breaker indicates OPEN.
Annunciator 902-8 D-1 clears.
GREEN light illuminated.
Annunciator 902-8 D-1 extinguished.
- 7.
Position TR-22 to Bus 21 synchroscope selector switch to OFF.
Switch in OFF position.
- 8.
Verify Bus 21 AMMETER and VOLTMETER indications are normal.
Verifies Bus 21 amps and volts are normal.
NOTE:
Amps may vary depending on conditions, and volts are normally ~ 4160.
TRANSFER BUS 23 TO TR-22
- 9.
Position TR-22 to Bus 23 SYNCHROSCOPE selector switch to ON.
Switch in ON position.
- 10. Verify:
INCOMING VOLTS and RUNNING VOLTS meters approximately equal.
SYNCHRONIZING meter at 12 oclock position and NOT rotating.
SYNCHRONIZING meter lights NOT glowing.
Voltages approximately equal.
Meter NOT rotating.
White lights extinguished.
- 11. Position TR-22 to Bus 23 breaker control switch to CLOSE.
RED light illuminated.
S-N-f Page 6 of 9
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 12. Verify:
SYNCHRONIZING meter at 12 oclock position.
TR-22 to Bus 23 breaker indicates CLOSED.
Annunciator 902-8 C-3 in alarm.
Meter NOT rotating.
RED light illuminated.
Annunciator 902-8 C-3 illuminated.
- 13. Position TR-21 to Bus 23 breaker control switch to TRIP.
GREEN light illuminated.
- 14. Verify:
TR-21 to Bus 23 breaker indicates OPEN.
Annunciator 902-8 C-3 clears.
GREEN light illuminated.
Annunciator 902-8 C-3 extinguished.
- 15. Position TR-22 to Bus 23 synchroscope selector switch to OFF.
Switch in OFF position.
- 16. Verify Bus 23 AMMETER and VOLTMETER indications are normal.
Verifies Bus 23 amps and volts are normal.
NOTE:
Amps may vary depending on conditions, volts are normally ~ 4160.
- 17. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-f Page 7 of 9
S-N-f Page 8 of 9 Operators Name:
Job
Title:
Title:
Auxiliary Power to TR-22 from TR-21 Revision Number: 01 JPM Number: S-N-f Task Number and
Title:
262L024, Transfer a 4160 volt bus between power supplies.
K/A Number and Importance: 262001.A4.04 3.6 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 14 minutes Actual Time Used:
minutes
References:
DOP 6500-01, rev 10 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
- 3. The NLO, dispatched to TR-21, reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
- 4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
- 5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.
INITIATING CUE
- 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-f Page 9 of 9
Exelon Nuclear Job Performance Measure PLACE A CONTROL ROD OUT OF SERVICE ON THE RWM JPM Number: S-N-g Revision Number: 02 Date: 09/08 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 01 Bank JPM.
Revision 02 Revised for 2009 NRC Exam.
S-N-g Page 2 of 7
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to IC 12.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Insert following Malfunctions and/or Remotes:
- irf RODH06DA (disarm control rod H-6).
- 3. Acknowledge and reset alarms.
DOCUMENT PREPARATION
- 1.
A clean up copy of DOP 0400-02.
S-N-g Page 3 of 7
INITIAL CONDITIONS
- 1. You are the Unit 2 NSO.
- 2. Control Rod H-06 was discovered uncoupled, 10 minutes ago.
- 3. All attempts to couple the rod have been unsuccessful.
- 4. The Control rod was then inserted to position 00, then electrically disarmed.
- 5. The QNE has been notified.
INITIATING CUE
- 1. The Unit Supervisor has directed you to take rod H-06 out of service on the Rod Worth Minimizer per DOP 0400-02, step G.3.c.(2).
- 2. Another NSO will complete DOA 0300-05 actions and logging requirements once control rod H-06 is OOS.
- 3. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-g Page 4 of 7
JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the provided copy of DOP 0400-02.
- 1.
Touches the area marked SECONDARY FUNCTION.
SECONDARY FUNCTION selected.
- 2.
Touches the area marked ROD OUT OF SERVICE.
Rod full core display Appears.
- 3.
Selects control rod H-06 on the touch screen.
Control Rod H-06 outlined with blue box and shown on screen as SELECTED.
- 4.
Visually verify that the selection is correct.
Verifies that Control Rod H-06 is selected.
- 5.
Touches the ENTER REQUEST box.
H-06 Rod position numerals are blue.
- 6.
Touches the EXIT FUNCTION box.
RWM returns to the Main Display.
NOTE:
Performer may verify the rod OOS by any of the following:
The RWM Main Display for H-06 indicates 00 and is blue in color.
Select rod to ensure rod in and out blocks are applied. Rod indication is backlit in blue color.
- 7.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-g Page 5 of 7
S-N-g Page 6 of 7 Operators Name:
Job
Title:
Title:
PLACE A CONTROL ROD OUT OF SERVICE ON THE RWM Revision Number: 02 JPM Number: S-N-g Task Number and
Title:
201L027, Enter Substitute Rod Position Data K/A Number and Importance: 201006.A2.05 3.1 / 3.5 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 11 minutes Actual Time Used:
minutes
References:
DOP 0400-02, rev 23 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
INITIAL CONDITIONS
- 1. You are the Unit 2 NSO.
- 2. Control Rod H-06 was discovered uncoupled, 10 minutes ago.
- 3. All attempts to couple the rod have been unsuccessful.
- 4. The Control rod was then inserted to position 00, then electrically disarmed.
- 5. The QNE has been notified.
INITIATING CUE
- 1. The Unit Supervisor has directed you to take rod H-06 out of service on the Rod Worth Minimizer per DOP 0400-02, step G.3.c.(2).
- 2. Another NSO will complete DOA 0300-05 actions and logging requirements once control rod H-06 is OOS.
- 3. Inform the Unit Supervisor when the task is complete.
S-N-g Page 7 of 7
Exelon Nuclear Job Performance Measure SBGT POST MAINTENANCE TESTING WITH AN AUTO INITIATION SIGNAL JPM Number: S-N-h Revision Number: 07 Date: 09/08 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 06 Bank JPM.
Revision 07 Revised for 2009 NRC Exam.
S-N-h Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any low power IC with Reactor Building ventilation operating in a normal lineup.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 4. Insert following Malfunctions and/or Remotes:
- Trg 1 "vgdstrta" (Causes Trigger 1 to activate when 2/3 SBGT control switch is place to START)
- Imf radrbdah (1 45)
(fails A channel reactor building vent monitor high, to cause a Group II isolation 45 sec. after 2/3A SBGT switch is placed to START).
- 5. Setup the following Triggers:
- None.
DOCUMENT PREPARATION
- 1.
Marked up copy of DOS 7500-02.
S-N-h Page 3 of 8
INITIAL CONDITIONS
- 1. You are the Center Desk NSO.
- 2. 2/3B SBGT train is operable and 2/3A SBGT train is in day 2 of a 7 day LCO per ITS 3.6.4.3 Action A.
- 3. Maintenance has been completed on 2/3 A SBGT train and the train is back in service.
- 5. No painting OR propane equipment operation has happened in the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- 6. The Initial Cumulative Run Time has been recorded.
INITIATING CUE
- 1. The Unit 2 Supervisor has directed you to perform DOS 7500-02 for the 2/3A SBGT train for post maintenance testing.
- 2. Notify the Unit 2 Supervisor when the task is complete up to step I.12.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-h Page 4 of 8
JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the provided copy of DOS 7500-02.
- 1.
Ensure the following:
2/3 A and B AIR HEATERs are OFF.
2/3 A and B Fans are OFF.
Correctly verifies:
GREEN lights illuminated.
GREEN lights illuminated.
- 2.
Verifies the following annunciators are NOT in alarm:
923-5 A-6, STBY GAS TRT SYS A TROUBLE 923-5 B-6, STBY GAS TRT SYS B TROUBLE Correctly verifies:
NOT illuminated.
NOT illuminated.
- 3.
Verify "B" SBGT SELECT SWITCH in B STBY position.
Places 2/3 B SBGT SELECT switch in B STBY.
- 4.
Place 2/3 "A" SBGT SELECT SWITCH to START A position.
Places the 2/3 "A" SBGT SELECT SWITCH to START A.
NOTE:
The Initial Run Time data has already been recorded. (in the initial cues).
- 5.
Records the Initial Run Time data for SBGT Train "A" on Checklist A.
Verifies the Initial Run Time data for SBGT Train "A" on Checklist A.
NOTE:
45 sec. after the 2/3A SBGT control switch is placed to START, a malfunction is automatically inserted to cause a Reactor Building Hi-Hi Rad condition (auto start signal for SBGT).
Depending on speed of candidate, the following step may or may NOT be completed prior to the malfunction being inserted.
S-N-h Page 5 of 8
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 6.
Verifies the 2/3A SBGT train initiated properly.
Verifies the 2/3A SBGT train is initiated properly.
NOTE:
When Reactor Building Hi-Hi rad signal is received, the examinee should recognize the need to perform the required Limitation and Action steps (which may be performed in any order).
CUE:
When Reactor Building Isolates (alarm 902-3 F-14), provide the following cue:
Attention for an update, Reactor Building Vent Channel A Rad Hi-Hi alarm received BEGIN ALTERNATE PATH
- 7.
Place the SELECT SWITCH for the non-running train to PRI.
Places the SELECT SWITCH for "B" SBGT train to PRI.
- 8.
Place the control switch for the train under test to OFF.
Places the control switch for "A" SBGT train to OFF.
- 9.
Verify train in PRI has sufficient flow and the heater is operating.
Nominally ~4000 scfm.
- 10. Place the Train previously under test to STBY.
Places the control switch for "A" SBGT train to STBY.
- 11. Verifies a Reactor Building Isolation has occurred on Panel 923-4.
Uses the Limitations and Actions section of DOS 7500-02, or any other procedure to verify the Reactor Building Isolation.
- 12. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-h Page 6 of 8
S-N-h Page 7 of 8 Operators Name:
Job
Title:
Title:
SBGT POST MAINTENANCE TESTING WITH AN AUTO INITIATION SIGNAL Revision Number: 07 JPM Number: S-N-h Task Number and
Title:
261L002, Start the SBGT system.
K/A Number and Importance: 261000.A2.13 3.4 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes
References:
DOS 7500-02, rev 44 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
INITIAL CONDITIONS
- 1. You are the Center Desk NSO.
- 2. 2/3B SBGT train is operable and 2/3A SBGT train is in day 2 of a 7 day LCO per ITS 3.6.4.3 Action A.
- 3. Maintenance has been completed on 2/3 A SBGT train and the train is back in service.
- 5. No painting OR propane equipment operation has happened in the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- 6. The Initial Cumulative Run Time has been recorded.
INITIATING CUE
- 1. The Unit 2 Supervisor has directed you to perform DOS 7500-02 for the 2/3A SBGT train for post maintenance testing.
- 2. Notify the Unit 2 Supervisor when the task is complete up to step I.12.
S-N-h Page 8 of 8