Notification of Inspection and Request for Information
ML092050643
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 07/24/2009
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: Swafford P
Tennessee Valley Authority
References
Download: ML092050643 (11)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 July 24, 2009 Mr. Preston D. Swafford Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

WATTS BAR NUCLEAR PLANT NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Swafford:

During the period of August 31 - September 4, 2009, the NRC will perform the baseline Public Radiation Safety Cornerstone inspection at Watts Bar, comprised of NRC Inspection Procedures 71121.03, Radiation Monitoring Instrumentation and Protective Equipment; 71122.01, Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems; and 71122.03, Radiological Environmental Monitoring Program and Radioactive Material Control Program. In addition, during the period of October 5 - 9, 2009, the NRC will perform Inspection Procedure 71121.01, Access Controls to Radiologically Significant Areas. The NRC will also perform sections of Inspection Procedure 71151, Performance Indicator Verification as it applies to radiation safety during the two inspection periods. Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff.

In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up-to-date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. In lieu of a pre-inspection visit, we request that the requested information be provided to our staff by August 17, 2009. An address to which the information, preferably on CD, can be sent is provided on the enclosed document request.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mike Brandon of your organization. If there are any questions about this inspection or the material requested, please contact the inspector, Heather J. Gepford at (404) 562-4659.

TVA 2

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/

reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/HJG RA for/

Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-390 License Nos.: NPF-90

Enclosure:

Watts Bar Nuclear Plant, Notification of Inspection and Request for Information cc w/encl.: (See page 3)

X SUNSI REVIEW COMPLETE HJG OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE HJG /RA/

HJG /RA for/

MDS /RA for/

NAME HGepford BBonser GGuthrie DATE 07/22/2009 07/22/2009 07/22/2009 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

TVA 3

cc w/encl:

Gordon P. Arent New Generation Licensing Manager Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Masoud Bajestani Vice President Watts Bar Unit 2 Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority Electronic Mail Distribution Michael K. Brandon Manager Licensing and Industry Affairs Watts Bar Nuclear Plant Electronic Mail Distribution Preston D. Swafford Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority Electronic Mail Distribution William R. Campbell Senior Vice President Fleet Engineering Tennessee Valley Authority Electronic Mail Distribution Thomas Coutu Vice President Nuclear Support Tennessee Valley Authority Electronic Mail Distribution General Counsel Tennessee Valley Authority Electronic Mail Distribution Gregory A. Boerschig Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Larry E. Nicholson General Manager Performance Improvement Tennessee Valley Authority Electronic Mail Distribution Michael A. Purcell Senior Licensing Manager Nuclear Power Group Tennessee Valley Authority Electronic Mail Distribution Michael J. Lorek Vice President - Nuclear Oversight Tennessee Valley Authority Electronic Mail Distribution Michael D. Skaggs Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Fredrick C. Mashburn Acting Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority Electronic Mail Distribution Robert J. Whalen Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-280 County Executive 375 Church Street Suite 215 Dayton, TN 37321 (cc w/encl. continued page 4)

TVA 4

(cc w/encl. continued)

County Mayor P.O. Box 156 Decatur, TN 37322 Lawrence Edward Nanney Director Division of Radiological Health TN Dept. of Environment & Conservation Electronic Mail Distribution James H. Bassham Director Tennessee Emergency Management Agency Electronic Mail Distribution Ann Harris 341 Swing Loop Rockwood, TN 37854

TVA 5

Letter to Preston D. Swafford from Brian Bonser dated July 24, 2009

SUBJECT:

WATTS BAR NUCLEAR PLANT NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION Distribution w/encl:

C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMWattsBar1 Resource RidsNrrPMWattsBar2 Resource

Enclosure Pre-Inspection Document Request Public Radiation Safety Cornerstone Licensee:

Watts Bar Nuclear Plant Docket Number(s):

50-390 Inspection Dates: August 31-September 4, 2009:

71122.01 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 71122.03 Radiological Environmental Monitoring Program (REMP) and Radioactive Material Control Program 71121.03 Radiation Monitoring Instrumentation and Protective Equipment 71151 Performance Indicator Verification (Public Radiation Safety Cornerstone)

The most recent inspection completed for inspection procedures 71122.01, 71122.03, and 71121.03 was May 2006.

Inspection Dates: October 5-9, 2009:

71121.01 Access Control to Radiologically Significant Areas 71151 Performance Indicator Verification (Occupational Radiation Safety Cornerstone)

The most recent inspection for inspection procedures 71121.01 and 71151 was March 2008.

Documentation is requested from the date of the previous inspection of a given area to the present. We would prefer as much of the information as possible in electronic form. An index to the CD contents is also helpful. For those items requesting a list of documents/areas, the inspector will select documents/areas from the list for on-site review.

If you have any questions, please call Heather Gepford at 404-562-4659. Thank you in advance for all your effort in putting together this material.

Assistance Requested During On-Site Inspection Identification of work activities during the inspection for inspector observations, including notification of pre-job briefings.

Advance notification of any liquid or gaseous effluent releases, including the associated pre-release sampling, analysis, and permit generation.

Health physics assistance in plant walk-downs assessing access controls, e.g. verifying the posting and locking of entrances to locked-high radiation areas and very high radiation areas, and spent fuel pool controls.

Assistance in plant/area walk-downs including: (1) liquid and gaseous effluent systems and associated effluent/process radiation monitors, (2) radiation monitors, including ARMs, CAMs, whole body counters, personnel contamination monitors, etc., (3) meteorological equipment, (4) groundwater monitoring locations including wells, manways, etc.

Assistance with observations of REMP sample collection and processing.

2 Enclosure General Information Request

1.

Telephone numbers of contacts

2.

Plant, Radiation Protection, and Chemistry organizational charts

3.

Electronic copy of applicable chapters of UFSAR (e.g. radiation protection program, effluents and environmental monitoring programs, radiation monitoring system, etc.)

4.

Latest revision of the Offsite Dose Calculation Manual (ODCM)

5.

List of radiation protection and chemistry (i.e. effluents) procedures

6.

Most recent DAW 10 CFR Part 61 analytical results.

7.

Corrective Action Program procedures

8.

Audits and self-assessments performed since May 2006 that encompass the areas of (1) radiation protection, (2) access controls, (3) effluent treatment and monitoring program (including chemistry and count room), (4) radiological environmental monitoring program, (5) radioactive material control, (6) meteorological monitoring program, (7) groundwater monitoring, (8) radiation measurement instrumentation program (fixed and portable), and (9) respiratory protection program.

71121.01 Access Control to Radiologically Significant Areas

1.

Site and corporate procedures associated with the access control program. Procedures should include:

o Radiological surveys, postings, and radiation control barricades o Security and control of high radiation sources/objects stored in pools o Radiation Work Permits o Radiological Job-Coverage o Controlling access to High Radiation Areas (HRAs), High Dose Rate High Radiation Areas (HDR-HRAs), and Very High Radiation Areas (VHRAs) o Key controls for all high radiation areas o Radioactive material control, including contamination and hot particles o Dosimetry monitoring (electronic dosimeters, multi-badging, etc.)

o Calculations of internal exposures

2.

List of the 10 most exposure significant work areas within radiation areas, high radiation areas (<1R/hr), or airborne radioactivity areas in the plant. This may include areas with low dose rates but high collective dose. Identify any high radiation areas with significant dose rate gradients (factor of 5 or more), including underwater diving activities.

3.

List or map of HRAs, LHRAs, HDR-HRAs (>25 rem in one hour @ 30 cm), and VHRAs.

Include areas with the potential to become a HRA during routine operations or outages.

4.

RWPs for the 5 highest dose rate areas or outage tasks; RWPs for airborne areas.

5.

Internal and skin dose assessments, including calculations, for any internal exposures greater that 10 mrem CEDE or skin doses greater than 500 mrem since March 2008.

6.

List of corrective action reports generated since March 2006 related to access controls, including the following:

o Access controls, including high radiation area radiological incidents o Radiological events caused by radiation worker errors o Radiological events caused by radiation protection technician errors

3 Enclosure 71122.03: Radiological Environmental Monitoring Program (REMP) and Radioactive Material Control Program

1.

Site and corporate procedures associated with the REMP program, meteorological monitoring, and radioactive material control program. These procedures should include:

o Environmental sampling methodology for each matrix (e.g. TLD, ground and surface water, milk, vegetation, sediment, etc.) including sample collection, preparation, and analysis o Calibration and maintenance of sampling equipment o Calibration and QC activities for sample counting instruments o Calibration, maintenance, and routine surveillance of meteorological instruments o Control, survey and release of individuals and materials from the RCA o Response to alarms at RCA and/or protected area exits o Calibration, maintenance, and use of small article monitors, tool monitors, etc.

2.

Two most recent Annual Environmental Monitoring Reports

3.

Calibration and maintenance records for air samplers and composite water samplers.

4.

Calibration records for environmental sample counting instruments, including control charts and LLD determination OR audits of quality control program of vendor laboratory used to analyze REMP samples, as appropriate.

5.

Interlaboratory comparison program results for the past two years (in-house laboratory or vendor laboratory). For in-house counting lab, quality control evaluation of results.

6.

Calibration/surveillance/maintenance records for the meteorological instruments since May 2006.

7.

List of small article monitors, tool monitors, etc. and their locations (calibration records for select instruments will be requested by the inspectors after reviewing the list).

8.

List of corrective action reports generated since May 2006 related to the REMP and Radioactive Material Control program, including the following:

o REMP program, including sampling and sample analysis o Meteorological monitoring program, including sensor problems, tower unavailability and data transmission/display discrepancies o Radioactive material control 71122.01 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems

1.

Site and corporate procedures/manuals associated with the radioactive effluents treatment and monitoring program. Procedures/manuals should include:

o Calibration and routine surveillance procedures for the effluent monitors listed below, including set-point determination.

o HP/Chemistry/Operations procedures for liquid and gaseous effluent sampling, analysis, and release, including release permit generation o Calibration and use of the effluent sample counting laboratory instruments (gamma spectroscopy, liquid scintillation, gas proportional) o Counting laboratory QC activities, including daily/weekly calibration checks, control charts, and interlaboratory comparison performance o Surveillance activities on air treatment systems, including charcoal/HEPA filter testing o Calculation of projected doses to members of the public from effluent releases

2.

Procedures for onsite/offsite surface/groundwater monitoring activities and leak detection

4 Enclosure

3.

Two most recent Annual Radioactive Effluents Release Reports.

4.

Summary of spill, leak, or unexpected liquid discharge data documented in the sites 10 CFR 50.75(g) files.

5.

Two most recent calibrations for the following effluent monitors, including flow meter calibrations:

o 0-RE-90-122, Waste Disposal System Liquid Effluent Monitor o 1-RE-90-400&402, Shield Building Exhaust Low & High Range Effluent Monitor o 0-RE-90-118, Waste Gas Holdup System Gas Effluent Monitor o 1-RE-90-404, Condenser Vacuum Air Exhaust Post Accident Effluent Monitor o 1-RE-90-130, Containment Purge Air Exhaust Effluent Monitor

6.

List of time periods during which the above listed effluent monitors were out of service since May 2006.

7.

List of modifications and design changes, including procedural or operational changes, made to effluent treatment, monitoring, or sampling systems or to plant ventilation systems since May 2006.

8.

Most recent liquid and gaseous continuous release permits and most recent liquid and gaseous batch release permits (4 total).

9.

Two most recent surveillances of the air cleanup system for the routine main plant airborne effluent release pathway including flow rate and HEPA/charcoal efficiency.

10. Interlaboratory comparison program results for effluent sample counting laboratory since May 2006.
11. List of corrective action reports generated since May 2006 related to effluent monitoring equipment, effluent treatment systems, and air cleanup systems.
12. List of corrective action reports generated since May 2006 for tritium or other radioisotopes in ground water wells, or identification of spills or leaks from contaminated systems, structures, and components.

Available for onsite review by inspector during inspection:

Plant drawings sufficient to permit the inspector to walk-down the liquid and gaseous effluent processing systems and effluent/process radiation monitors.

Description and/or 50.59 evaluations of modifications and design changes, including procedural or operational changes, made to effluent treatment, monitoring, or sampling systems or to plant ventilation systems since May 2006.

71121.03 Radiation Monitoring Instrumentation and Protective Equipment

1.

Site and corporate procedures/manuals associated with radiation monitoring instrumentation and respiratory protection. Procedures/manuals should include:

o Operation, calibration, and maintenance of ARM, CAM, portal monitor (PM),

personnel contamination monitor (PCM), and tool monitors, including set-point determination o Operation and calibration of Whole Body Counter (WBC) equipment o Issuance/operation of portable survey instruments o Calibration and maintenance of portable instruments (e.g. ion chambers, friskers, teletectors, rem-ball) o Actions to be taken when portable instrument found to be significantly out of tolerance/calibration

5 Enclosure o Issuance and use of respiratory protective equipment (emphasis on SCBA and air-supplied equipment) o Training, including fit-testing, for use of SCBA and supplied-air systems o SCBA maintenance activities, including vital components (i.e. regulators) o Determination/verification of Grade D air for SCBA

2.

If PASS capabilities have been modified through license amendment, provide a copy of the amendment and applicable SER

3.

Two most recent surveillances of PASS equipment (or equivalent equipment as approved by license amendment)

4.

Two most recent calibrations for the following ARM/CAM equipment:

o 0-RE-90-102, Fuel Pool Accident Radiation Monitor o 1-RE-90-271, Reactor Building Upper Compartment Post Accident o 1-RE-90-273, Reactor Building Lower Compartment Post Accident o 1-RE-90-1, Spent Fuel Pool Area o 1-RE-90-2, Personnel Air Lock o SFP Area Airborne Particulate Activity (CAM)

5.

Two most recent calibrations for PCMs and PMs located at the RCA exit.

6.

Most recent calibration of WBC and copy of the analysis library.

7.

Records of certification of air quality for equipment used to provide breathing air for air-supplied respirators and SCBA bottles since May 2006.

8.

List of corrective action reports generated since May 2006 involving radiation monitoring and protective equipment deficiencies, including the following:

o Area radiation monitors and continuous air monitors o Portable instrumentation, PCM, PM, and WBC monitoring equipment o Respiratory protection equipment and program implementation.

Available for onsite review by inspector during inspection:

Inventory, inspection, and maintenance records for SCBA equipment Training records, including fit-testing, for SCBA-qualified individuals Training records/certification for individuals qualified to perform maintenance on vital components (e.g. regulators) on SCBA 71151 Performance Indicator (PI) Verification

1.

Procedure(s) for identifying, notification, tracking, and correcting PI occurrences

2.

Monthly PI reports since January 2008, and copies of associated PERs for Occupational Exposure Control Effectiveness and RETS/ODCM Radiological Effluent occurrences

3.

List of all corrective action documents since January 2008 using keywords such as: HRA, LHRA, VHRA, unintended dose, unlocked door, etc.

4.

List of all dose rate alarms > 1 R/hr and dose alarms since January 2008.

Inspector Contact Information:

Heather J. Gepford (404) 562-4659 Heather.Gepford@nrc.gov Mailing Address US NRC Region II ATTN: Heather J. Gepford 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415