ML092010381

From kanterella
Jump to navigation Jump to search

Acceptance Review Email, License Amendment Request, Revise Technical Specification 3.4.15, RCS Leakage Detection Instrumentation Operability Requirements and Actions
ML092010381
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/20/2009
From: Wang A
Plant Licensing Branch IV
To: Ketelsen S, Parker L, Schrader K
Pacific Gas & Electric Co
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC ME1644, TAC ME1645
Download: ML092010381 (1)


Text

From: Wang, Alan Sent: Monday, July 20, 2009 2:05 PM To: 'Parker, Larry M'; 'Stan Ketelsen'; Schrader, Kenneth Cc: Lent, Susan; Burkhardt, Janet

Subject:

Acceptance Review of PG&E License Amendment Request 09-02 (ME1644 and ME1645)

Stan and Larry:

By letter dated July 3, 2009, Pacific Gas and Electric Company (PG&E) requested an amendment to the Facility Operating License for Diablo Canyon Power Plant, Unit Nos. 1 and 2 (DCPP). The proposed License Amendment Request (LAR) 09-02 will revise Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, Operability Requirements and Actions for RCS Leakage Detection Instrumentation." The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1445.

Alan Wang Project Manager (Diablo Canyon)

Nuclear Regulatory Commission Division of Operating Reactor Licensing Alan.Wang@NRC.gov Tel: (301) 415-1445 Fax: (301) 415-1222 E-mail Properties

Mail Envelope Properties (419623E8C7444444BF132DA3AE69EDA21AD4477455)

Subject:

Acceptance Review of PG&E License Amendment Request 09-02 (ME1644 and ME1645)

Sent Date: 7/20/2009 2:05:25 PM Received Date: 7/20/2009 2:05:25 PM From: Wang, Alan Created By: Alan.Wang@nrc.gov Recipients:

LMP1@pge.com ('Parker, Larry M')

Tracking Status: None SCK3@pge.com ('Stan Ketelsen')

Tracking Status: None KJSe@pge.com (Schrader, Kenneth)

Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan)

Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 7395 7/20/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: