MONTHYEARML16336A1062016-12-0101 December 2016 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML0919801252009-06-17017 June 2009 License Renewal Commitments Inspection, Exit Meeting - Tdb ML0919801262009-06-17017 June 2009 10/27/2008 Oyster Creek License Renewal Commitments Inspection, Entrance Meeting ML0919801272009-06-17017 June 2009 License Renewal Commitments Inspection, Exit Meeting - TBD ML0919801282009-06-17017 June 2009 License Renewal Commitments Inspection, Exit Meeting - TBD ML0919801292009-06-17017 June 2009 License Renewal Commitments Inspection, Exit Meeting - TBD ML0919801302009-06-17017 June 2009 12/03/2008 Oyster Creek License Renewal Commitments Inspection Exit Meeting ML0919802342009-06-17017 June 2009 License Renewal Commitments Inspection, Exit Meeting - TBD ML0919802332009-06-17017 June 2009 License Renewal Commitments Inspection, Exit Meeting - TBD ML0914903592009-05-0606 May 2009 Fatigue Monitoring Program ML0914903602009-05-0606 May 2009 Feeder for Oyster Creek ML0914903612009-05-0606 May 2009 Results of Detailed Review; Water Chemistry Management Program ML0712400082007-05-0303 May 2007 Drywell Trench Photographs During 4/29/07 Maintenance Outage IR 05000219/20060092006-11-0606 November 2006 (SGI) IR 05000219-06-009 on 10/02/06-10/05/06 for Oyster Creek Nuclear Generating Station; Physical Protection IR 05000219/20060042006-10-24024 October 2006 IR 05000219-06-004, on 07/01/2006 - 09/30/2006, Oyster Creek, Fire Protection, Maintenance Effectiveness, and Surveillance Testing IR 05000219/20060062006-06-20020 June 2006 IR 05000219-06-006, on 04/24/2006 - 05/19/2006, Oyster Creek; Biennial Baseline Inspection of the Identification and Resolution of Problems IR 05000219/20050112006-01-0909 January 2006 EA 05-199 Oyster Creek Generating Station -Final Significance Determination for a White Finding and Notice of Violation (NRC Event Followup Inspection Report No. 05000219/2005011) IR 05000219/20040032004-11-0202 November 2004 EA 04-142, Oyster Creek Generating Station - Final Significance Determination for a Green Finding (NRC Inspection Report 05000219-04-003) ML0227701532002-10-0404 October 2002 Notification of Conduct of a Triennial Fire Protection Baseline Inspection IR 05000219/20020052002-05-28028 May 2002 IR 05000219-02-05; on 03/31-05/11/2002; Amergen Energy Company, LLC; Oyster Creek Generating Station; Integrated Report. No Violations Identified IR 05000219/20010132002-03-11011 March 2002 IR 05000219/2001-013, on 12/31/01-02/09/02, Amergen, Oyster Creek Generating Station, Equipment Alignment, Event Follow Up. Two non-cited Violations Noted IR 05000219/20010102002-01-17017 January 2002 IR 05000219/2001-010, Oyster Creek Generating Station, Inspection on 11/11/2001 - 12/30/01 Related to Emergent Work. No Violations Noted IR 05000219/20010052001-06-11011 June 2001 NRC Inspection Report 05000219/2001005 ML0631204891966-04-15015 April 1966 IR 05000219-66-001, on 03/22-23/1966, Oyster Creek, Construction Inspection Report Including Drywell Testing IR 05000219/19660011966-04-15015 April 1966 1966/04/15-IR 05000219-66-001, on 03/22-23/1966, Oyster Creek, Construction Inspection Report Including Drywell Testing 2016-12-01
[Table view] |
Text
Oyster Creek License Renewal Commitments Inspection Entrance Meeting - Oct 27, 2008
Introductions
Objectives [using IP 71003]
" Verify ALL outage-related SER proposed license conditions adequately implemented
" Verify Selected outage-related SER LR commitments are adequately implemented
" Assess your actions to evaluate primary containment structural integrity
" Verify changes to outage-related commitments done iaw commitment management program
" Verify any CLB changes that materially affect outage related commitments, pursuant to
§54.21(b) were reviewed & evaluated law §54 Thanks in advance for your support Great Support >>> Special Thanks to Pete Tamburro Cal Taylor Logistics Inspection Period Oct 27 to Nov 6 This week, 2 1/2 Inspectors Weekend +.2nd week (Mon-Wed), as needed, 1 or 2 inspectors Operating out of HR Conference Room Daily debrief with your team, 4 p.m.
EXIT on Thursday, Nov 6 at 10am
>>> potential open item at Exit ... Review Eng. Eval of D/W UT data
>>> Rich Conte, my BC will be here for the Exit
>>> Darrell Roberts, DRS Dep. Div Dir plans to visit some time during inspection, maybe here for the Exit Reminder >>> Observers from NJ State DEP (b)(5)
~od ewmit the Freedom of itneftmg ft FOIPAik
Scome Commitments will be verified on a Sampling Basis Outage Related Proposed License Conditions
- Perform Full Scope inspections of drywell sand bed region every other refueling outage
- Monitor drywell trenches every refueling outage Outage Related LR Commitment Items ASME IWE, Containment In-service Inspection SD/W &Sand Bed UT &VT
- Leakage Monitoring of cavity drain and sand bed drains
- Cavity strippable coating
- Moisture Barrier Seals in D/W & Sand Beds Protective Coating Monitoring and Maintenance Program
- D/W & Sand Bed coatings VT Electrical Cables and Connections 9 Cable inspections in D/W & Trunion Room Inaccessible Medium Voltage Cables
- Cable Testing Structures Monitoring Program and RG 1.127, Inspection of Water-Control Structures
- Intake Structure below the water line Buried Piping
- ESW Pipe Tie-in One-Time Inspection Program
- 1 or 2 other samples Periodic Inspection Program
- ESW pipe expansion joint inspection
- 1 or 2 other samples Late Addition to Inspection Scope Metal Fatigue Program 9 Any fatigue program inputs that changed base line calculations, that may have changed the list of high cumulative usage factor components. If locations changed on vulnerable components, then we may do a visual inspection of the component.