License Renewal Commitments Inspection, Exit Meeting - Tdb
ML091980125
Person / Time
Site: Oyster Creek
Issue date: 06/17/2009
From:
- No Known Affiliation
To:
NRC Region 1
References
FOIA/PA-2009-0070
Download: ML091980125 (2)


Text

i'eDecis. na, lnfor tion --

alti el Oyster Creek License Renewal Commitments Inspection Exit Meeting - TBD

Introductions

" NRC Region 1

" NRC HQ

" NRC Residents

" AmerGen

" NJ DEP (Observers)

Excellent Overall Cooperation from everybody

>>> use of the Certrec Internet Database was quite-.,helpful Special Thanks e Pete Tamburro (LR Progrrh Owner)

" Chris Hawkins (NDE Level*-Il)

  • Cal Taylor & Jhansi Kandasar*'

Inspection Schedule Slippage ",,

" LR outage schedule slipped due to u0

" Some NDE UTs re-scheduled,

" Bay 11 Coating BlI Tis

  • Bay 3 Moistur@;

1" r,- al P

" Cavity Leakaoii,'nd, Wailnt,

" As a result, our in:ition ran ino*$V 2

fi"0*!6`pted phisical interference.issues 4 bays week and a 3rd in-office week Documentation Exit Meeting (late Jan/early Feb)

  • I awaft"s Wf3thefedn Of Inb~ft

~mAdL fica ~

EFfUOWIUP 0 1

)0 Prehdeclsl nal Informnaion --

soca OC LRI 2008-07_Exit Notes-rev-;6.doc 1 of 6 I_

12/19/2008

PEeSucisimraol.sInformc R

ts n --Off U

Exec Summary of Inspection Results v" 9 Satisfactory Actions to evaluate primary Containment structural integrity

(

(b)(5)

Unclear how these are part 50 commitments tor now.

o Strippable Coating to Prevent Water Intrusion P Monitoring of Sand Bed Drain Lines CP*r-so,,

  • Monitoring of Cavity Trough Drain Lineo
  • r)

"O X

For the selected samples,"

(b)(5)

  • Sampled 9 AMPs to Verify Commitment Implementation
  • No Problems or Issues Identified, with Three Exceptions J r j

IýA T r

(b)(5) 1(two items)

. Perform Full Scope inspections of sand bed region every other6utage e Monitor drywell trenches for water every refueling outage (until trenches restored)

?_X Ve Verified 2 commitment changes we!

'aw Exelon commitment management program

  • Bolting Integrity Program (comrn tmn1'!ii12*)
  • Rx Vessel Axial Weld Examinat Rel ief',N fR

,est (commitment 48)

(b)(5) 4-decisiaI Infor tion -- Ofciai OC LRI 2008-07 Exit Notes rev-6.doc 2 of 7 12/19/2(008