MONTHYEARML16336A1062016-12-0101 December 2016 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML0919801252009-06-17017 June 2009 License Renewal Commitments Inspection, Exit Meeting - Tdb ML0919801262009-06-17017 June 2009 10/27/2008 Oyster Creek License Renewal Commitments Inspection, Entrance Meeting ML0919801272009-06-17017 June 2009 License Renewal Commitments Inspection, Exit Meeting - TBD ML0919801282009-06-17017 June 2009 License Renewal Commitments Inspection, Exit Meeting - TBD ML0919801292009-06-17017 June 2009 License Renewal Commitments Inspection, Exit Meeting - TBD ML0919801302009-06-17017 June 2009 12/03/2008 Oyster Creek License Renewal Commitments Inspection Exit Meeting ML0919802342009-06-17017 June 2009 License Renewal Commitments Inspection, Exit Meeting - TBD ML0919802332009-06-17017 June 2009 License Renewal Commitments Inspection, Exit Meeting - TBD ML0914903592009-05-0606 May 2009 Fatigue Monitoring Program ML0914903602009-05-0606 May 2009 Feeder for Oyster Creek ML0914903612009-05-0606 May 2009 Results of Detailed Review; Water Chemistry Management Program ML0712400082007-05-0303 May 2007 Drywell Trench Photographs During 4/29/07 Maintenance Outage IR 05000219/20060092006-11-0606 November 2006 (SGI) IR 05000219-06-009 on 10/02/06-10/05/06 for Oyster Creek Nuclear Generating Station; Physical Protection IR 05000219/20060042006-10-24024 October 2006 IR 05000219-06-004, on 07/01/2006 - 09/30/2006, Oyster Creek, Fire Protection, Maintenance Effectiveness, and Surveillance Testing IR 05000219/20060062006-06-20020 June 2006 IR 05000219-06-006, on 04/24/2006 - 05/19/2006, Oyster Creek; Biennial Baseline Inspection of the Identification and Resolution of Problems IR 05000219/20050112006-01-0909 January 2006 EA 05-199 Oyster Creek Generating Station -Final Significance Determination for a White Finding and Notice of Violation (NRC Event Followup Inspection Report No. 05000219/2005011) IR 05000219/20040032004-11-0202 November 2004 EA 04-142, Oyster Creek Generating Station - Final Significance Determination for a Green Finding (NRC Inspection Report 05000219-04-003) ML0227701532002-10-0404 October 2002 Notification of Conduct of a Triennial Fire Protection Baseline Inspection IR 05000219/20020052002-05-28028 May 2002 IR 05000219-02-05; on 03/31-05/11/2002; Amergen Energy Company, LLC; Oyster Creek Generating Station; Integrated Report. No Violations Identified IR 05000219/20010132002-03-11011 March 2002 IR 05000219/2001-013, on 12/31/01-02/09/02, Amergen, Oyster Creek Generating Station, Equipment Alignment, Event Follow Up. Two non-cited Violations Noted IR 05000219/20010102002-01-17017 January 2002 IR 05000219/2001-010, Oyster Creek Generating Station, Inspection on 11/11/2001 - 12/30/01 Related to Emergent Work. No Violations Noted IR 05000219/20010052001-06-11011 June 2001 NRC Inspection Report 05000219/2001005 ML0631204891966-04-15015 April 1966 IR 05000219-66-001, on 03/22-23/1966, Oyster Creek, Construction Inspection Report Including Drywell Testing IR 05000219/19660011966-04-15015 April 1966 1966/04/15-IR 05000219-66-001, on 03/22-23/1966, Oyster Creek, Construction Inspection Report Including Drywell Testing 2016-12-01
[Table view] |
Text
i'eDecis. na, lnfor tion -- alti el Oyster Creek License Renewal Commitments Inspection Exit Meeting - TBD
Introductions
" NRC Region 1
" NRC HQ
" NRC Residents
" AmerGen
" NJ DEP (Observers)
Excellent Overall Cooperation from everybody
>>> use of the Certrec Internet Database was quite-.,helpful Special Thanks e Pete Tamburro (LR Progrrh Owner)
" Chris Hawkins (NDE Level*-Il)
- Cal Taylor & Jhansi Kandasar*' -
Inspection Schedule Slippage ",,
" LR outage schedule slipped due to u0
" Some NDE UTs re-scheduled, fi"0*!6`pted phisical interference .issues
" Bay 11 Coating BlI Tis
- Bay 3 Moistur@; 1" r,- al P
" Cavity Leakaoii,'nd, Wailnt, 4 bays
" As a result, our in:ition ran ino*$V 2 week and a 3rd in-office week Documentation Exit Meeting (late Jan/early Feb)
- I awaft"s Wf3thefedn Of Inb~ft~mAdL fica ~
EFfUOWIUP 0 1 )0 Prehdeclsl nal Informnaion -- soca OC LRI 2008-07_Exit Notes-rev-;6.doc 1 of 6 12/19/2008 I_
PEeSucisimraol ts n --Off R .sInformc U Exec Summary of Inspection Results v" 9 Satisfactory Actions to evaluate primary Containment structural integrity
( (b)(5)
Unclear how these are part 50 commitments tor now.
o Strippable Coating to Prevent Water Intrusion J r P Monitoring of Sand Bed Drain Lines CP*r- so,,
- Monitoring of Cavity Trough Drain Lineo *r) "O X For the selected samples," (b)(5) j IýA T
- Sampled 9 AMPs to Verify Commitment Implementation
- No Problems or Issues Identified, with Three Exceptions (b)(5) 1(two items) ?_X r
. Perform Full Scope inspections of sand bed region every other6utage e Monitor drywell trenches for water every refueling outage (until trenches restored)
Ve Verified 2 commitment changes we! 'aw Exelon commitment management program
- Bolting Integrity Program (comrn tmn1'!ii12*) *:,
- Rx Vessel Axial Weld Examinat Rel ief',N fR ,est (commitment 48)
(b)(5) 4-decisiaI Infor tion -- Ofciai OC LRI 2008-07 Exit Notes rev-6.doc 2 of 7 12/19/2(008