i'eDecis. na, lnfor tion -- alti el Oyster Creek License Renewal Commitments Inspection Exit Meeting - TBD

Introductions

" NRC Region 1

" NRC HQ

" NRC Residents

" AmerGen

" NJ DEP (Observers)

Excellent Overall Cooperation from everybody

>>> use of the Certrec Internet Database was quite-.,helpful Special Thanks e Pete Tamburro (LR Progrrh Owner)

" Chris Hawkins (NDE Level*-Il)

  • Cal Taylor & Jhansi Kandasar*' -

Inspection Schedule Slippage ",,

" LR outage schedule slipped due to u0

" Some NDE UTs re-scheduled, fi"0*!6`pted phisical interference .issues

" Bay 11 Coating BlI Tis

  • Bay 3 Moistur@; 1" r,- al P

" Cavity Leakaoii,'nd, Wailnt, 4 bays

" As a result, our in:ition ran ino*$V 2 week and a 3rd in-office week Documentation Exit Meeting (late Jan/early Feb)

  • I awaft"s Wf3thefedn Of Inb~ft~mAdL fica ~

EFfUOWIUP 0 1 )0 Prehdeclsl nal Informnaion -- soca OC LRI 2008-07_Exit Notes-rev-;6.doc 1 of 6 12/19/2008 I_

PEeSucisimraol ts n --Off R .sInformc U Exec Summary of Inspection Results v" 9 Satisfactory Actions to evaluate primary Containment structural integrity

( (b)(5)

Unclear how these are part 50 commitments tor now.

o Strippable Coating to Prevent Water Intrusion J r P Monitoring of Sand Bed Drain Lines CP*r- so,,

  • Monitoring of Cavity Trough Drain Lineo *r) "O X For the selected samples," (b)(5) j IýA T
  • Sampled 9 AMPs to Verify Commitment Implementation
  • No Problems or Issues Identified, with Three Exceptions (b)(5) 1(two items) ?_X r

. Perform Full Scope inspections of sand bed region every other6utage e Monitor drywell trenches for water every refueling outage (until trenches restored)

Ve Verified 2 commitment changes we! 'aw Exelon commitment management program

  • Bolting Integrity Program (comrn tmn1'!ii12*) *:,
  • Rx Vessel Axial Weld Examinat Rel ief',N fR ,est (commitment 48)

(b)(5) 4-decisiaI Infor tion -- Ofciai OC LRI 2008-07 Exit Notes rev-6.doc 2 of 7 12/19/2(008