ML091940159
| ML091940159 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/27/2009 |
| From: | Sanders C Plant Licensing Branch 1 |
| To: | Heacock D Dominion Nuclear Connecticut |
| sanders C, NRO/DNRL/NWE1, 301-415-1311 | |
| References | |
| IR-3-04, TAC ME1256, FOIA/PA-2011-0115 | |
| Download: ML091940159 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 27, 2009 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE POWER STATION, UNIT NO.3 - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST IR-3-04, ALTERNATIVE BRAZED JOINT METHODOLOGY (TAC NO. ME1256)
Dear Mr. Heacock:
By letter dated April 28, 2009 (Agencywide Document Access and Management System Accession No. ML091310666), Dominion Nuclear Connecticut, Inc. (DNC or the licensee) submitted Relief Request IR-3-04 for Millstone Power Station, Unit NO.3. The April 28, 2009, letter requested authorization to allow the deferral of repair/replacement activities for degraded brazed joints in the Class 3 Service Water System in lieu of the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, 2004 Edition, No Addenda. To complete its review, the Nuclear Regulatory Commission staff requests the enclosed additional information.
The draft questions were sent to Mr. Bill Bartron, of your staff, to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. On July 23, 2009, Mr. Mohamed Elmqghrabi, of your staff, agreed that you would provide a response by August 25, 2009.
If you have any questions regarding this matter, please contact me at 301-415-1603.
- ely, Carleen J.
a ~ers, pkr Plant Licen in Branch 1-2 Division of rating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423
Enclosure:
As stated cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION (RAI)
RELIEF REQUEST IR-3-04 DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION, UNIT NO.3 DOCKET NO. 50-423 By letter dated April 28, 2009 (Agencywide Document Access and Management System Accession (ADAMS) No. ML091310666), Dominion Nuclear Connecticut, Inc. (DNC or the licensee) submitted Relief Request IR-3-04 for Millstone Power Station, Unit NO.3. The April 28, 2009, letter requested authorization to allow the deferral of repair/replacement activities for degraded brazed joints in the Class 3 Service Water System in lieu of the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, (ASME Code)
Section XI, 2004 Edition, No Addenda. To complete its review, the Nuclear Regulatory Commission (NRC) staff requests the following additional information.
- 1. Relief Request IR-3-04 contains many similarities in regards to the precedent relief request, IR-2-38 (ADAMS Accession No. ML051610101). It is unclear to the NRC staff why relevant information from the precedent relief request, contained in letters dated September 14, 2006 (ADAMS Accession No. ML062580234) and January 2, 2007 (ADAMS Accession No. ML070030092), was not incorporated into the current submittal.
Please provide clarification as to why this information was not included and provide responses to the RAl's enclosed in the letter dated September 14, 2006, and the supplemental information from the January 2, 2007, letter, as applicable to Relief Request IR-3-04. If a question from the RAI is considered not applicable, please provide detailed justification as to why not.
- 2. In Section 5.3.4 of Relief Request IR-3-04, the licensee discusses the use of safety factors from ASME Code,Section XI, Appendix C paragraph C-3320(b) and C-3420(a),
with these being the same safety factors permitted in Code Case N-513-1. Code Case N-513-1 has been superseded by Code Case N-513-2, as stated in Regulatory Guide 1.147, Revision 15. Please provide a discussion as to why the safety factors as listed in Code Case N-513-2 are not used.
- 3. Having employed an alternative to ASME Code requirements for the assessment of degraded brazed joints in the Class 3 service water system, via Relief Request IR-2-38, please provide a discussion on when this methodology was applied to degraded brazed joints during the last inservice inspection interval. Use an actual example from the plant and include the engineering evaluation used to asses the degraded joint; ultrasonic examination (UT) data gathered under MP-UT-45 Revision 000-01, Ultrasonic exam procedure in attachment E of the submittal, supporting the engineering evaluation; UT data from the monitoring of the degraded joint; UT data from augmented examinations; and work orders performing the code repair.
Enclosure
July 27, 2009 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE POWER STATION, UNIT NO.3 - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST IR-3-04, ALTERNATIVE BRAZED JOINT METHODOLOGY (TAC NO. ME1256)
Dear Mr. Heacock:
By letter dated April 28, 2009 (Agencywide Document Access and Management System Accession No. ML091310666), Dominion Nuclear Connecticut, Inc. (DNC or the licensee) submitted Relief Request IR-3-04 for Millstone Power Station, Unit NO.3. The April 28, 2009, letter requested authorization to allow the deferral of repair/replacement activities for degraded brazed joints in the Class 3 Service Water System in lieu of the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, 2004 Edition, No Addenda. To complete its review, the Nuclear Regulatory Commission staff requests the enclosed additional information.
The draft questions were sent to Mr. Bill Bartron, of your staff, to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. On July 23,2009, Mr. MohamedElmaghrabi, of your staff, agreed that you would provide a response by August 25,2009.
If you have any questions regarding this matter, please contact me at 301-415-1603.
Sincerely,
/RA!
Carleen J. Sanders, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423
Enclosure:
As stated cc w/encl: Distribution via Listserv Distribution:
Public LPL1-2 R/F RidsNrrDorlLpl1-2 Resource RidsNrrPMCSanders Resource RidsNrr LAABaxter Resource RidsRgn1 MailCenter Resource RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsNrrDciCpnb Resource MBaquera, NRR/DCI ML09 01 9 ADAMS Accession No.
194 5
D t d
- B M ly emo ae Office LPL1-2/PM LPL1-2/LA DCI/CPNB/BC LPL1-2/BC Name CSanders ABaxter - SLittie for TChan HChernoff Date 07/20/2009 07/15/2009 07/07/2009*
7/27/09 OffiCial Record Copy