ML091740132

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation - Changes to Physical Security Plan
ML091740132
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/19/2009
From: Scherer A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
Download: ML091740132 (1)


Text

SOUTHERN CALIFORNIA A. Edward Scherer

  • Director EDISON ,i Nuclear Regulatory Affairs An EDISON INTERNATIONALO Company June 19, 2009 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Docket Nos. 50-361, 50-362 and 72-41 San Onofre Nuclear Generating Station, Units 2 and 3, and Independent Spent Fuel Storage Installation

Dear Sir or Madam:

Southern California Edison (SCE) has made changes to the Physical Security Plan for the San Onofre Nuclear Generating Station (SONGS) that SCE has determined do not decrease the safeguards effectiveness of these plans.

In accordance with 10 CFR § 50.54(p)(2), a report containing a description of these changes is enclosed for your information and a record of the changes has been made and is available for inspection at SONGS.

Note that the enclosure to this letter contains safeguards information. This letter may be decontrolled upon separation from its enclosures.

If you have any questions regarding this matter, please contact Mr. S. D. Root at (949) 368-6480.

Sincerely, Enclosure (SGI) cc: E. E. Collins, Regional Administrator, NRC Region IV R. Hall, NRC Project Manager, San Onofre Units 2 & 3 S. Helton, NRC Project Manager, San Onofre ISFSI G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 & 3 SAFEGUARDS INFORMATION i Notice: Decontrolled upon separation from the enclosure.

P.O. Box 128 San Clemente, CA 92674