Letter Sequence Acceptance Review |
|---|
|
|
MONTHYEARGNRO-2009/00018, Inservice Inspection (Lsi) Relief Requests GG-ISI-005 Through 012 American Society of Mechanical Engineers Section XI Second 10-Year Inspection Interval Closeout2009-05-29029 May 2009 Inservice Inspection (Lsi) Relief Requests GG-ISI-005 Through 012 American Society of Mechanical Engineers Section XI Second 10-Year Inspection Interval Closeout Project stage: Request ML0916701212009-06-16016 June 2009 Acceptance Review for Relief Requests (TAC Nos. ME1376 - ME1383) Project stage: Acceptance Review ML0918107092009-07-0101 July 2009 Request for Additional Information Relief Request GG-ISI-005 Through GG-ISI-012 Project stage: RAI GNRO-2009/00051, Response to NRC Request for Additional Information for ISI Relief Requests GG-ISI-005 Through GG-ISI-0122009-10-0101 October 2009 Response to NRC Request for Additional Information for ISI Relief Requests GG-ISI-005 Through GG-ISI-012 Project stage: Response to RAI ML1000500132010-01-0404 January 2010 Generic Fundamentals Section of the Written Operator Licensing Examination Project stage: Request ML0935201062010-01-0404 January 2010 Request for Additional Information, Relief Request Nos. GG-ISI-005 Through GG-ISI-012 Project stage: RAI GNRO-2010/00015, Response to NRC Request for Additional Information for Lsi Relief Requests GG-ISI-005 Through GG-ISI-012 for NRC Letter Dated January 4, 20102010-02-11011 February 2010 Response to NRC Request for Additional Information for Lsi Relief Requests GG-ISI-005 Through GG-ISI-012 for NRC Letter Dated January 4, 2010 Project stage: Response to RAI ML1008906062010-03-30030 March 2010 Follow-up Request for Additional Information Relief Request GG-ISI-005 Through GG-ISI-012 Project stage: RAI ML1008906022010-03-30030 March 2010 Email, Follow-up Request for Additional Information Relief Request GG-ISI-005 Through GG-ISI-012 Project stage: RAI GNRO-2010/00030, Response to NRC Request for Additional Information for Lsi Relief Requests GG-ISI-005 Through GG-ISI-012 for NRC E-mail Dated March 30, 20102010-04-29029 April 2010 Response to NRC Request for Additional Information for Lsi Relief Requests GG-ISI-005 Through GG-ISI-012 for NRC E-mail Dated March 30, 2010 Project stage: Response to RAI ML1014100022010-05-25025 May 2010 Relief Request Nos. GG-ISI-005 Through GG-ISI-012 for Second 10-year Inservice Inspection Interval Project stage: Approval 2010-01-04
[Table View] |
Acceptance Review for Relief Requests (TAC Nos. ME1376 - ME1383)| ML091670121 |
| Person / Time |
|---|
| Site: |
Grand Gulf  |
|---|
| Issue date: |
06/16/2009 |
|---|
| From: |
Lyon C Watts Bar Special Projects Branch |
|---|
| To: |
Larson M Entergy Operations |
|---|
| Lyon C (415-2296) |
| References |
|---|
| GG-ISI-005, GG-ISI-006, GG-ISI-007, GG-ISI-008, GG-ISI-009, GG-ISI-010, GG-ISI-011, GG-ISI-012, TAC ME1376, TAC ME1377, TAC ME1378, TAC ME1379, TAC ME1380, TAC ME1381, TAC ME1382, TAC ME1383 |
| Download: ML091670121 (2) |
|
Text
From:
Lyon, Fred Sent:
Tuesday, June 16, 2009 9:12 AM To:
'LARSON, MICHAEL J'
Subject:
Acceptance Review (TAC Nos. ME1376 - ME1383)
By letter dated May 29, 2009, Entergy Operations, Inc., submitted relief request nos. GG-ISI-005 through GG-ISI-012, in accordance with 10 CFR 50.55a. The relief requests are based on limitations due to design configurations that preclude full code examination coverage for ASME code welds and components.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of these relief requests. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the relief requests in terms of regulatory requirements and the protection of public health and safety and the environment.
If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
E-mail Properties Mail Envelope Properties ()
Subject:
Acceptance Review (TAC Nos. ME1376 - ME1383)
Sent Date: 06/16/2009 9:04:00 AM Received Date: 06/16/2009 9:11:00 AM From: Lyon, Fred Created By: Fred.Lyon@nrc.gov Recipients:
MLARSON@entergy.com ('LARSON, MICHAEL J')
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 8606 06/16/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: