NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:

RO SYSTEM k TITLE:

MANUALLY START P-41 DIESEL FIRE PUMP CANDIDATE:

EXAMINER:

JPM: RO SYSTEM k PALISADES NUCLEAR PLANT Page 2 of 9 JULY 2008 JOB PERFORMANCE MEASURE DATA PAGE Task:

Operate Fire Protection Equipment Alternate Path: NO Facility JPM #: PL-OPS-FPS-001J K/A: 086A2.02 Importance:

RO: 3.0 SRO: 3.3 K/A Statement: Low FPS header pressure Task Standard: Diesel Fire Pump, P-41, manually started per SOP-21, section 7.4.1 Preferred Evaluation Location: Simulator In Plant

__X___

Preferred Evaluation Method:

Perform Simulate

__X___

References:

SOP-21, Fire Protection System Validation Time: 12 minutes Time Critical:

NO Candidate: _____________________________________________________

Time Start: ________

Time Finish:

Performance Time:

________ minutes Performance Rating:

SAT______

UNSAT ______

Comments:

Examiner: _______________________________

Date:

Signature

JPM: RO SYSTEM k PALISADES NUCLEAR PLANT Page 3 of 9 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-21, Fire Protection System, Rev. 20 Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The Plant is shutdown for a refueling outage.
  • A fire at the cooling Towers requires the use of Diesel Fire Pump, P-41.
  • P-9A, Motor Driven Fire Pump is tagged out for maintenance.
  • P-9B, Diesel Fire Pump has started.
  • P-41, Diesel Fire Pump has not started automatically.
  • Fire system header pressure is at 60 psig.
  • Jockey Pump, P-13, is operating.
  • There are no Service Water Booster Pumps (P-25A, P-25B or P-25C) in service (Attachment 2 of SOP-21 Supply Fire Header Pressure with Service Water Booster Pump).
  • Annunciator EK-3533, Fire Pump Day Tank T-40 Level Hi-Lo is not alarming.

INITIATING CUES:

  • The CRS has directed you to manually start Diesel Fire Pump, P-41, per SOP-21, Section 7.4.1.

JPM: RO SYSTEM k PALISADES NUCLEAR PLANT Page 4 of 9 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Operator obtains a copy of SOP-21, Section 7.4.1, To Manually Start P-41 SOP-41, Section 7.4.1 obtained S U Comment:

NOTE: Evaluator provides the operator a working copy SOP-21, Section 7.4.1.

Proc. Step TASK ELEMENT 2 STANDARD Grade 7.4.1a Verify Diesel Engine Day Tank T-40 level normal by any of the following methods:

OBSERVE EK-3533, Fire Pump Day Tank T-40 Level Hi-Lo, on C-126 Panel not alarming.

READ level gauge LG-3553 (key: 237).

Operator verifies T-40 level normal (given in initial conditions)

S U Comment:

NOTE: Evaluator: If Operator begins to use LG-3553 to determine T-40 level, CUE that T-40 level is normal.

Proc. Step TASK ELEMENT 3 STANDARD Grade 7.4.1b PLACE CS-EC137, Diesel Fire Pump P-41 Control Switch, to Manual A or Manual B.

Operator places CS-EC137, Diesel Fire Pump P-41 Control Switch, to Manual A or Manual B.

S U Comment:

NOTE: Operator is not to place the Control Switch to Manual A or B, simulate only.

NOTE: Either position (Manual A or Manual B) is acceptable; provide cue based on which position is selected by Operator.

NOTE: EVALUATOR CUE: CS-EC137, Diesel Fire Pump P-41 Control Switch, is in Manual A or Manual B.

CRITICAL STEP

JPM: RO SYSTEM k PALISADES NUCLEAR PLANT Page 5 of 9 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade 7.4.1c CHECK K-10, Diesel Fire Pump P-41 Diesel Driver, lube oil crankcase level using dipstick.

Operator verifies K-10, Diesel Fire Pump P-41 Diesel Driver, lube oil crankcase level using dipstick.

S U Comment:

NOTE: Operator is not to remove the dipstick, simulate only.

NOTE: EVALUATOR CUE: Crankcase oil level is normal.

Proc. Step TASK ELEMENT 5 STANDARD Grade 7.4.1d If K-10, Diesel Fire Pump P-41 Diesel Driver, crankcase oil level is abnormally high with a strong fuel oil odor, THEN PERFORM Operator determines that this step is not applicable S U Comment:

NOTE: EVALUATOR CUE: No odor of fuel oil in crankcase oil Proc. Step TASK ELEMENT 6 STANDARD Grade 7.4.1e CHECK K-10, Diesel Fire Pump P-41 Diesel Driver, coolant level is in the normal band of between the top of the tank (bottom of the fill neck) and one inch down from the top of the tank.

1. If coolant level is NOT within the normal band, THEN CONTACT..

Operator determines that the Diesel Fire Pump P-41 Diesel Driver, coolant level is in the normal band of between the top of the tank (bottom of the fill neck) and one inch down form the top of the tank and the actions of this step are not applicable.

S U Comment:

NOTE: Operator is not to remove the coolant cap, simulate only.

NOTE: EVALUATOR CUE: Diesel Fire Pump P-41 Diesel Driver, coolant level is in the normal band of between the top of the tank (bottom of the fill neck) and one inch down form the top of the tank.

JPM: RO SYSTEM k PALISADES NUCLEAR PLANT Page 6 of 9 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade 7.4.1f If K-10, Diesel Fire Pump P-41 Diesel Driver, crankcase and coolant check is satisfactory, THEN PRESS START pushbutton.

Operator pushes K-10, Diesel Fire Pump, start pushbutton.

S U Comment:

NOTE: Location: Panel C-137, K-10/P-41 Control Panel.

NOTE: Operator is not to push the start pushbutton, simulate only.

NOTE: EVALUATOR CUE: K-10 has started and the engine is running.

NOTE: EVALUATOR CUE If Fire header pressure is checked, provide cue that pressure is at 100 psig.

CRITICAL STEP Proc. Step TASK ELEMENT 8 STANDARD Grade 7.4.1g IF P-13, Jockey Fire Pump, is operating, THEN PLACE 52-559CS, Jockey Fire Pump P-13 Control Switch, to off.

Operator places 52-559CS, Jockey Fire Pump P-13 Control Switch, to off.

S U Comment:

NOTE: Operator is not to place 52-559CS to off, simulate only.

NOTE: EVALUATOR CUE: 52-559CS, Jockey Fire Pump P-13 Control Switch is off, Jockey Fire Pump P-13 is not running.

CRITICAL STEP Proc. Step TASK ELEMENT 9 STANDARD Grade 7.4.1h IF Attachment 2 is in affect, THEN STOP Operator determines that this step is not applicable (given in initial conditions)

S U Comment:

NOTE: EVALUATOR CUE: If asked, provide cue that Attachment 2 (Supply Fire Header Pressure with Service Water Booster Pump) is not in effect.

JPM: RO SYSTEM k PALISADES NUCLEAR PLANT Page 7 of 9 JULY 2008 Proc. Step TASK ELEMENT 10 STANDARD Grade 7.4.1i OBSERVE K-10, Diesel Fire Pump P-41, for proper operation:

No unusual vibration.

No oil or water leaks.

Adequate lube oil pressure Operator checks P-41 for:

No unusual vibration.

No oil or water leaks.

Adequate lube oil pressure.

S U Comment:

NOTE: EVALUATOR CUE: 1. NO UNUSUAL VIBRATION, 2. NO OIL OR WATER LEAKS,

3. ADEQUATE LUBE OIL PRESSURE Proc. Step TASK ELEMENT 11 STANDARD Grade n/a Notify CRS that Diesel Fire Pump has been manually started per SOP-21, section 7.4.1.

Operator notifies CRS that Diesel Fire Pump has been manually started per SOP-21, section 7.4.1.

S U Comment:

END OF TASK

JPM: RO SYSTEM k PALISADES NUCLEAR PLANT Page 8 of 9 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • The Plant is shutdown for a refueling outage.
  • A fire at the cooling Towers requires the use of Diesel Fire Pump, P-41.
  • P-9A, Motor Driven Fire Pump is tagged out for maintenance.
  • P-9B, Diesel Fire Pump has started.
  • P-41, Diesel Fire Pump has not started automatically.
  • Fire system header pressure is at 60 psig.
  • Jockey Pump, P-13, is operating.
  • There are no Service Water Booster Pumps (P-25A, P-25B or P-25C) in service (Attachment 2 of SOP-21 Supply Fire Header Pressure with Service Water Booster Pump).
  • Annunciator EK-3533, Fire Pump Day Tank T-40 Level Hi-Lo is not alarming.

INITIATING CUES:

  • The CRS has directed you to manually start Diesel Fire Pump, P-41, per SOP-21, Section 7.4.1.

JPM: RO SYSTEM k PALISADES NUCLEAR PLANT Page 9 of 9 JULY 2008 SIMULATOR OPERATOR INSTRUCTIONS N/A, IN PLANT JPM