| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 05/14/2009 |
| From: | David Wright Plant Licensing Branch II |
| To: | Geoffrey Miller Virginia Electric & Power Co (VEPCO) |
| Wright D, NRR/DORL, 301-415 -1864 | |
| References | |
| TAC ME1068, TAC ME1069 | |
| Download: ML091490795 (1) | |
Text
From:
Donna Wright Sent:
Thursday, May 14, 2009 9:58 AM To:
'Gary.D.Miller@dom.com' Cc:
'David.Sommers@dom.com'
Subject:
SURRY POWER STATION, UNIT NOS. 1 AND 2 - ACCEPTANCE OF PROPOSED AMENDMENT TO CORRECT TS TABLE 3.7-1 (TAC NOS. ME1068 AND ME1069)
Follow Up Flag:
Follow up Flag Status:
Flagged Hello:
By letter dated April 13, 2009 (Agencywide Documents and Access Management System Accession No. ML091040147), Virginia Electric and Power Company submitted a license amendment request for North Anna Power Station, Unit Nos. 1 and 2. The proposed amendment request revises TS Table 3.7-1 Operator Action 3.b and provides direction if the less-than-required-minimum-operable-channels-condition for the nuclear flux intermediate range occurs between 7% and 11% of rated power. The purpose of this correspondence is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.
Please contact myself or Karen Cotton at (301) 415-1438 if you have any questions or concerns.
Donna Wright Project Manager U.S. Nuclear Regulatory Commission 301.415.1864 donna.wright@nrc.gov
E-mail Properties Mail Envelope Properties ()
Subject:
SURRY POWER STATION, UNIT NOS. 1 AND 2 ? ACCEPTANCE OF PROPOSED AMENDMENT TO CORRECT TS TABLE 3.7-1 (TAC NOS. ME1068 AND ME1069)
Sent Date: 5/14/2009 9:52:12 AM Received Date: 5/14/2009 9:58:00 AM From: Donna Wright Created By: Donna.Wright@nrc.gov Recipients:
Gary.D.Miller@dom.com ('Gary.D.Miller@dom.com')
Tracking Status: None David.Sommers@dom.com ('David.Sommers@dom.com')
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 12082 5/14/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: Follow up. Start by Thursday, May 14, 2009. Due by Thursday, May 14, 2009