MEMORANDUM TO:
John Richmond, Inspection Team Leader
Division of Reactor Safety
THRU:
John R. White, Chief
Plant Support Branch 2
Division of Reactor Safety
FROM:
Timothy L. O'Hara, Reactor Inspector
Plant Support Branch 2
Division of Reactor Safety
SUBJECT:
LICENSE RENEWAL INSPECTION ACTIVITIES, FEEDER
FOR OYSTER CREEK GENERATING STATION,
INSPECTION REPORT NO. 05000219/2008007
The enclosed feeder contains input for the subject report resulting from inspection of
License Renewal Commitments during the period October 13, 2008 to November 14,
2008, at the Oyster Creek Generating Station. The inspection was conducted in
accordance with Inspection Procedure 71003, License Renewal Commitments.
Cover Letter Input
No input.
Enclosure:
Feeder for Oyster Creek Generating Station, Inspection Report
No. 05000219/2008007
SUMMARY OF FINDINGS
IR 05000219/2008007; 10/13/2008 - 11/14/08; Oyster Creek Generating Station;
License Renewal Commitments Inspection; IP 71003
A.
NRC-Identified and Self-Revealinq Findinqs
No.findings of significance.
Hi
2
Report Details
REPORT DETAILS
OTHER ACTIVITIES (OA)
40A2 License Renewal Follow-up (IP 71003)
2.
Detailed Reviews and Observations
2.7
Drywell Shell External Coatings Inspection (inside sand bed bays)
a.
Scope of Inspection
The inspectors reviewed the licensee's visual inspection (VT) procedure
inte iewed nondestructive examination (NDE) supervisors and observed field
co ection, recordin and reporting of inspection data which was completed in
c
ance with the approved proce ures.
e inspectors a so reviewe
a
Fampl e
-- of the visual testing (VT) qualifica ions of the data collection technicians.
The inspectors reviewed a sample of the VT inspection data sheets for the sand
bed areas from the exterior of the drywell for the inspections conducted in
October and November 2008. The inspectors verified that the licensee
completed the inspections, identified condition(s) in the exterior coating which
required repair, completed the coating repairs in accordance with engineering
procedures, and conducted appropriate re-inspection of repaired areas.
b.
Observations
The inspector conducted a general observation (not a qualified VT inspection) of
the repaired area and the general condition in Bay 11. The inspectors verified
that the licensee's inspection data reports appeared to accurately describe the
conditions observed by the inspectors in Bay 11.
The inspector also conducted a general observation (not a qualified VT
inspection) of the general condition in Bay 9. The inspectors verified that the
licensee's inspection data reports appeared to accurately describe the
conditions observed by the inspectors in Bay 9.
The inspector conducted a general observation (not a qualified VT inspection) of
the general condition in Bay 5. The inspectors verified that the licensee's
inspection data reports appeared to accurately describe the conditions observed
by the inspectors in Bay 5.
A-3
ATTACHMENT
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
P. Tamburro,
J. Kandasamy, Manager Regulatory Affairs
C. Hawkins, NDE Level III Technician
M. McDermott, NDE Supervisor
NRC Personnel
S. Pindale, Acting Senior Resident Inspector, Oyster Creek
J. Kulp, Resident Inspector, Oyster Creek
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened/Closed
None.
Opened
xxx
Closed
None.
3
A-4
LIST OF DOCUMENTS REVIEWED
License renewal Program Documents
Drawingqs
Plant Procedures & Specification
Specification SP 1302-32-035, 2/24/93; Inspection and Minor Repair of Coating on
Concrete & Drywell Shell Surfaces In The Sand Bed Region
ER-AA-335-018, Revision 5; Detailed, General, VT-1, VT-1 C, VT-3 and VT-3C Visual
Examination of ASME Class MC and CC Containment Surfaces and
Components
ER-AA-335-004, Revision 2; Manual Ultrasonic Measurement of Material Thickness
And Interfering Conditions
VT Inspection Data Sheets
1 R22-LRA-084, Bay 19, 11/8/08
1 R22-LRA-083, Bay 15, 11/8/08
1 R22-LRA-082, Bay 7, 11/8/08
1R22-LRA-091, Bay 19, 11/8/08
1 R22-LRA-026, Bay 1, 10/30/08
1R22-LRA-052, Bay 3, 10/31/08
1 R22-LRA-027, Bay 5, 10/29/08
1R22-LRA-054, Bay 7, 10/31/08
1 R22-LRA-028, Bay 9, 10/29/08
I R22-LRA-046, Bay 11, 10/31/08
1 R22-LRA-035, Bay 13, 10/30/08
1R22-LRA-048, Bay 15, 10/31/08
1 R22-LRA-029, Bay 17, 10/30/08
1R22-LRA-050, Bay 19, 10/31/08
Incident Reports (IRs)
00939194
00836395
00838523
00838509
00839848
4
A-5
Maintenance Requests(AR) & Work Orders(WO)
WO R2088180-07, VT Inspection of Exterior Drywell Shell In Sand Bed 1, Bay 1
AR00839185839185AR00839188
AR00839214839214AR00838509
AR00839211839211AR00841957
AR00843380843380AR00842325
AR00842357842357AR00837647
AR00837628837628AR00837554
AR00836367836367AR00836362
AR00837188837188AR00836802
AR00838148838148AR00837765
AR00836994836994AR00838402
AR00842360842360AR00842359
AR00842357842357AR00842355
AR00842333842333AR00842323
AR00841543841543AR00839053
AR00838509838509AR00838833
AR00839028839028AR00839033
AR00839182839182AR00839185
AR00839188839188AR00839192
AR00839194839194AR00839204
AR008392118392115
A-6
NDE Certification Records
NDE Certification #1421 for M.Kent Waddell dated 10/29/08
NDE Certification #0977 for Richard L. Alger dated 10/29/08
Miscellaneous Documents
LIST OF ACRONYMS
Electric Power Research Institute
NEI
Nuclear Energy Institute
Systems, Structures, and Components
Significance Determination Process
Technical Report
Updated Final Safety Analysis Report
Steam Generator Tube Rupture
Interfacing System Loss of Coolant Accident
Loss of Coolant Accident
Non Destructive Examination
American Society of Mechanical Engineers
Visual Testing
Penetrant Testing
Ultrasonic Testing
Radiographic Testing
In Service Inspection
Low Pressure Coolant Injection
Inter Granular Stress Corrosion Cracking
Boiling Water Reactor Vessel Internals Project
Non Cited Violation
Electric Power Research Institute
6