ML091460763

From kanterella
Jump to navigation Jump to search

Enclosure 2 Slides Regarding Relief Request PRR-8
ML091460763
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 05/22/2009
From:
Arizona Public Service Co
To: Hall J
Plant Licensing Branch IV
Hall, J R, NRR/DORL/LPL4, 301-415-4032
Shared Package
ML091460692 List:
References
PRR-8, TAC ME1346
Download: ML091460763 (13)


Text

Palo Verde Nuclear Generating Station Discussion Relief Request HPSI 3B 5/22/08

Discussion Topics

  • Overview of Reason for Request
  • Pump Description
  • Maintenance Performed 3R14
  • Problem Description / Repairs Performed 2
  • Problem Description / Repairs Performed
  • Code Requirements
  • Current Plant Status
  • Proposed Pump Demonstration Testing
  • Basis for Relief Request

Overview of Reason for Request

  • High Pressure Safety Injection Pump 3B

- New Pump Seal Installed

- Installation Difficulties Required Replacement

- Bearing Replacement Performed

  • Code Requires Full Flow Test 3

- Normally Conducted Open Vessel (Reactor Defueled)

- Unit 3 Approaching Mode 4 When Discovered

  • Request Deviation from Full Flow Test

- Conduct Maxi Flow Test Approx 80% Full Flow

- No Impact to Pump Flow Characteristics during Maintenance

- Full Flow Test Conducted this Outage

- Plant not in Optimal Alignment to conduct Full Flow Test

Pump Description

  • High Pressure Safety Injection Pump

- Centrifugal Pump

- Ingersol - Rand Model 4X11CA-8 PM being performed to Upgrade Seal 4

- PM being performed to Upgrade Seal

- Pump Performance Acceptable Prior to Refuel

- Post Maintenance Full Flow Test Acceptable Results

Maintenance Performed 3R14

  • 4/25-4/30/09 - Scheduled PM

- Removal/replacement of mechanical seal

  • 5/3 - Initial Fill - Outboard Mech Seal Leak 5

- Small Piece of Carbon Material Found

- Reassembled outboard seal/bearing

- ISLT and Section XI testing completed satisfactorily

Maintenance Performed 3R14

  • 5/6 - 5/19 HPSI B Pump Sat Idle
  • 5/19 - Started HPSI B for SIT fills.

- Observed Leakage from outboard seal

- Initially ~ 1/2 gpm 6

Initially 1/2 gpm

- Reduced to ~ 1 drop/sec at End of 4 hrs

7

8

Repairs Performed

  • Entered Level B Troubleshooting Plan

- OEM Vendor Support

- Determined Cause of Seal Leakage -

Improper Alignment of Seal Faces 9

Improper Alignment of Seal Faces

- Outboard Seal Damaged Due to Misalignment

- Thrust Bearing (damaged during removal)

  • Performed repairs to HPSI B outboard seal w/

replacement of thrust bearing

Code Requirements

  • ASME OM Code 2001 Edition through 2003 Addenda
  • ISTB-3310 Effect of Pump Replacement, Repair, and Maintenance on Reference Values If R f V l S t f V l M

h 10

  • If Reference Value or Set of Values May have been effected by repair or replacement

- Bearing Replacement May Affect

  • New Reference Values shall be determined

- By a Comprehensive or Group A Test Run

- Prior to declaring pump operable

Current Plant Conditions At Time of Determining Retest

  • Reactor Reassembly Complete
  • Primary Plant Solid
  • Drawing a Bubble in the Pressurizer 11
  • RCP Sweeps in Progress
  • Normal Full Flow Test Conducted with

- Fuel Off Loaded

- Reactor Vessel Open

Proposed Pump Demonstration Testing

  • 2 Hour Run

- Verify Correct Seal Operation

- Change Bearing Oil

- Collect vibration data Additi l 2 h R

(1 dditi l

12

  • Additional 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Run (1 additional as a minimum)

- Vibration measured and analyzed at each point

  • Utilize Max Recirc Flow Alignment

- At least 750 gpm versus 1040 gpm design

- Acceptable in Mode 5

Basis for Relief Request

  • New Bearing is Only Cause for Comprehensive Flow Test
  • No Change to Pump Characteristics
  • Successful Comprehensive Flow Test 13 Successful Comprehensive Flow Test Performed this Refuel Outage
  • Vibration Data at Min Flow Generally worse than Full Flow
  • Testing Under Current Plant Conditions Not Typical Configuration for Full Flow Testing