Text
_TfLW4TNHItaD LAR MXM-I IUNr John Richmond From:
Richard Conte, Sent:
Friday, October 03, 2008 11:13 AM To:
John Richmond; Kay Gallagher Cc:
Michael Modes; Glenn Meyer; Marsha Gamberoni; Darrell Roberts; Doug Tifft; Heather Jones
Subject:
LET'S PROJECT MANAGE OC AND BV - WE ARE GOING TO NEED THE ORG. RE: OC Sandbed access Doug I would like you to help out on OC and Heather BV - See john for your roles.
Kay need a DRS Action Item with the following subtasks:
"Effectively manage the OC license renewal commitments review (detailed inspection planing and related gov.
P-and public outreach)"
JR/GM many sub-sub tasks might be needed for each of these subtask. If so, go with a project plan like BV.
'4 Outside of the scope L
Outside of the scope
- 2. By Oct. 22, conduct briefing for inspection plan and related outreach - obtain final comments on Outage Comm Plan (DLR, SLO, PAO, PB6, DDD-DRS, EDO corn & coord.)
- 3. By Nov. 5, conduct Prebief on inspection results (DLR, SLO, PAO, PB6, DDD-DRS, EDO corn & coord.) -
distribute draft of quick look letter
- 4. By Nov. 6, conduct exit on site - BC and TL (potential weekend work if OC SU is Nov. 11 or sooner) DDD optional or if needed for crisis.
- 5. By Nov. 10 - final quick look letter - sign out within day (startup assumed to be 11/11) - note same DRS players involved in BV LR exit
- 6. By Nov. 11 Implement comm plan for quick look letter (startup assumed to be 11/11) - note same DRS players involved in BV LR exit 4.
Outside of the scope 8BY Dec. 17 Issue IR and implement related Comm Plan "0
From: John Richmond Sent: Friday, October 03, 2008 9:22 AM To: Michael Modes; Timothy OHara Cc: Richard Conte
Subject:
OC Sandbed access The mock-up training was very useful. They made a concrete block, same shape and dimension as a sliced section of the drywell, then used their boring tool to cut a tunnel (19" or 20" diameter, 8 to 12 foot long) into the sandbed region, to prove the tool would work. Plywood sheeting takes the place of the steel liner.
Once you're inside, I think it's only 17 or 18 inches wide. I would not recommend anyone try to enter the sandbed cavity if they have a chest size larger than mine or Tim's. It might be reasonable to crawl through the tunnel and stick your head inside for a look see. And if you're even a little uneasy in tight spaces, forget it!
2
Received: from R1CLSTRO1.nrc.gov ([148.184.99.7]) by R1 MS01.nrc.gov
([148.184.99.10]) with mapi; Fri, 3 Oct 2008 11:13:20 -0400 Content-Type: application/ms-tnef; name="winmail.dat" Content-Transfer-Encoding: binary From: Richard Conte <Richard.Conte@nrc.gov>
To: John Richmond <John.Richmond@nrc.gov>, Kay Gallagher
<Kay.Gallagher@nrc.gov>
CC: Michael Modes <Michael. Modes@nrc.gov>, Glenn Meyer <Glenn.Meyer@nrc.gov>,
Marsha Gamberoni <Marsha.Gamberoni@nrc.gov>, Darrell Roberts
<Darrell. Roberts@nrc.gov>, Doug Tifft <Doug.Tifft@nrc.gov>, Heather Jones
<Heather.Jones@nrc.gov>
Date: Fri, 3 Oct 2008 11:13:19 -0400
Subject:
LET'S PROJECT MANAGE OC AND BV - WE ARE GOING TO NEED THE ORG. RE:
OC Sandbed access Thread-Topic: LET'S PROJECT MANAGE OC AND BV - WE ARE GOING TO NEED THE ORG.
RE: OC Sandbed access Thread-Index: AcklWwCSi8knN PezRIeZUk/YNIZeZAAC8OYQ Message-ID: <2856BC46 F6A308418F033D973BBOEE72969750439C@R1CLSTRO1.nrc.gov>
References:
<2856BC46F6A308418F033D973BBOEE72969744F33B@R1 CLSTRO1.nrc.gov>
In-Reply-To: <2856BC46F6A308418F033D973BBOEE72969744F33B@R1CLSTRO1.nrc.gov>
Accept-Language: en-US Content-Language: en-US X-MS-Has-Attach:
X-MS-Exchange-Organization-SCL: -1 X-MS-TN EF-Correlator:
<2856BC46F6A308418F033D973BBOEE72969750439C@R1 CLSTR01.nrc.gov>
MIME-Version: 1.0