ML091200651

From kanterella
Jump to navigation Jump to search
Request for List of Protected Species and Water Usage Impacts within the Area Under Evaluation for the Duane Arnold Energy Center License Renewal Application Review
ML091200651
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 05/06/2009
From: David Pelton
License Renewal Projects Branch 1
To: Gieselman W
State of IA, Dept of Natural Resources
ECCLESTON C. H. 415-8537, NRR/DLR/RPB1
References
Download: ML091200651 (10)


Text

May 6, 2009 Mr. Wayne Gieselman, Administrator Iowa Department of Natural Resources Environmental Services Division 502 East 9th Street Des Moines, IA 50319.

SUBJECT:

REQUEST FOR LIST OF PROTECTED SPECIES AND WATER USAGE IMPACTS WITHIN THE AREA UNDER EVALUATION FOR THE DUANE ARNOLD ENERGY CENTER LICENSE RENEWAL APPLICATION REVIEW

Dear Mr. Gieselman:

The U.S. Nuclear Regulatory Commission (NRC) is reviewing an application submitted by FPL Energy Duane Arnold, LLC for the renewal of the operating license for Duane Arnold Energy Center (DAEC). The DAEC is located in Linn County, Iowa on the western bank of the north-south reach of the Cedar River, approximately two miles north-northeast of the town of Palo and approximately three miles east of the Benton county line. As part of the review of the license renewal application, the NRC is preparing a supplemental environmental impact statement (SEIS) under the provisions of the National Environmental Policy Act (NEPA) of 1969, as amended. The SEIS includes an analysis of pertinent environmental issues, including endangered or threatened species, fish and wildlife, and water usage. This letter is being submitted under the provisions of the Endangered Species Act of 1973, as amended, and the Fish and Wildlife Coordination Act of 1934, as amended.

FPL Energy Duane Arnold, LLC has stated that it has no plans to alter current operations over the license renewal period. Operating under a renewed license, the DAEC would use existing plant facilities and transmission lines and would not require additional construction or disturbance of new areas. Any maintenance activities would be limited to previously disturbed areas.

The DAEC site encompasses approximately 500 acres of land. The site is located on a strip of land running northeast and parallel to the Cedar River, which is the largest tributary of the Iowa River. The slopes are heavily wooded, but transition into gently rolling farmland as one moves away from the immediate vicinity of the river. Aquatic communities of the Cedar River in the vicinity of DAEC are directly influenced by the quantity and quality of water in the river, which is the source of makeup water for the plants mechanical draft cooling towers. Approximately 25 percent (126 acres) of the current site is leased farmland. The remainder of the site is a combination of small forested plots, a marsh and hardwood forest along the river, and the industrial plant complex (See Enclosed Map).

W. Gieselman The plant employs a closed-cycle heat dissipation system with cooling towers, designed to remove waste heat from the Circulating Water System, which cools the main condensers. The intake structure is located on the west bank of the Cedar River. Makeup water for the Circulating Water System is provided by the River Water Supply System, which includes the intake structure, intake pumps, and various features to control the amount of debris entering the system (See Enclosed Map).

Five transmission lines were built to connect DAEC to the electric grid. Two 345-kV lines tie into an existing 345-kV line, and three 161-kV lines deliver power to three substations at Washburn, Bertram, and Hiawatha (AEC 1973). An additional 161-kV line was later added to this system.

The transmission system is summarized below (see enclosed map).

Hills 345-kV Line - A single circuit line, which runs westward from DAEC along a 665-foot wide corridor shared with the Hazelton line, the Washburn Line, and for approximately 0.34 miles, the Bertram line. After the Bertram line splits off, the corridor becomes 500 feet wide. The Hills line runs approximately 2.7 miles and then turns south to the Hills substation feed, an existing line running in the north-south direction approximately 3.5 miles west of the site.

Hazelton 345-kV Line - A single circuit line, which runs westward from DAEC in a 665-foot wide corridor shared with the Hills line, the Washburn Line, and for approximately 0.34 miles the Bertram line. After the Bertram line splits off, the corridor becomes 500 feet wide.

This line runs approximately 2.7 miles and turns north to the Hazelton substation to feed an existing line, which runs in a north-south direction approximately 3.5 miles west of the site.

Washburn 161-kV Line - A single circuit line, which shares the westward 500-665 foot wide corridor with the Hills and Hazelton lines and continues west 16 miles to the Garrison substation, then an additional 30 miles north to the Washburn substation.

Bertram 161-kV Line - A single circuit line, which shares the westward 665-foot wide corridor with the Hills and Hazelton lines for 0.34 miles, then continues southeast along a 100-foot corridor to Bertram substation for a total distance of 28 miles.

Hiawatha 161-kV Line - A single circuit line, which leaves the site in an easterly direction, crosses the Cedar River, and continues eight miles to the Hiawatha substation.

Sixth Street 161-kV Line - A single circuit line, which leaves the site in a southwesterly direction around Palo, then follows a railroad corridor 16 miles southeast to the center of Cedar Rapids proper.

W. Gieselman To support the SEIS preparation process and to ensure compliance with Section 7 of the Endangered Species Act, the NRC requests a list of species and information on protected, proposed, and candidate species and critical habitat that may be within the vicinity of Duane Arnold Energy Center and its associated transmission line right-of-way. In addition, please provide any information you consider appropriate under the provisions of the Fish and Wildlife Coordination Act. Please also provide any information regarding water usage impacts. To support the project schedule, we request that this information be transmitted by June 1, 2009.

On June 15, 2009, we plan to conduct an audit of the DAEC site. You and your staff are invited to attend this audit. Your office will also receive a copy of the draft SEIS along with a request for comments. The anticipated publication date for the draft SEIS is January 29, 2010. If you would like to submit any comments regarding the scope of this SEIS, or have any questions, please contact Charles Eccleston, Environmental Project Manager, by phone at 301-415-8537 or by email at Charles.Eccleston@nrc.gov, or Mr. Maurice Heath by phone at 301-415-3137 or by e-mail at Maurice.Heath@nrc.gov.

Sincerely,

/RA/

David L. Pelton, Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-331

Enclosures:

1. Duane Arnold Site Description
2. Duane Arnold Site Boundary Map
3. Duane Arnold 6 Mile Vicinity Map
4. Duane Arnold Transmission System cc w/encls: See next page

To support the SEIS preparation process and to ensure compliance with Section 7 of the Endangered Species Act, the NRC requests a list of species and information on protected, proposed, and candidate species and critical habitat that may be within the vicinity of Duane Arnold Energy Center and its associated transmission line right-of-way. In addition, please provide any information you consider appropriate under the provisions of the Fish and Wildlife Coordination Act. Please also provide any information regarding water usage impacts. To support the project schedule, we request that this information be transmitted by June 1, 2009.

On June 15, 2009, we plan to conduct an audit of the DAEC site. You and your staff are invited to attend this audit. Your office will also receive a copy of the draft SEIS along with a request for comments. The anticipated publication date for the draft SEIS is January 29, 2010. If you would like to submit any comments regarding the scope of this SEIS, or have any questions, please contact Charles Eccleston, Environmental Project Manager, by phone at 301-415-8537 or by email at Charles.Eccleston@nrc.gov, or Mr. Maurice Heath by phone at 301-415-3137 or by e-mail at Maurice.Heath@nrc.gov.

Sincerely,

/RA/

David L. Pelton, Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-331

Enclosures:

1. Duane Arnold Site Description
2. Duane Arnold Site Boundary Map
3. Duane Arnold 6 Mile Vicinity Map
4. Duane Arnold Transmission System cc w/encls: See next page DISTRIBUTION:

See next page Adam Accession No. ML091200651 OFFICE PM:DLR:RPB1 LA: DLR BC:REB1:DLR NAME C.Eccleston S.Figueroa D.Pelton DATE 05/05/2009 05/01/09 05/06/2009 OFFICIAL RECORD COPY

Letter to Wayne Gieselman from C. Eccleston dated May 6, 2009

SUBJECT:

REQUEST FOR LIST OF PROTECTED SPECIES AND WATER USAGE IMPACTS WITHIN THE AREA UNDER EVALUATION FOR THE DUANE ARNOLD ENERGY CENTER LICENSE RENEWAL APPLICATION REVIEW DISTRIBUTION:

EMAIL:

RidsNrrDlrResource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource M. Heath C. Eccelston M. Baty K. Feintuch R. Franovich A. Kugler J. Davis N. Sheehan, RI R. Hannah, RII V. Mitlyng, RIII V. Dricks, RIV

Duane Arnold Energy Center cc:

Mr. Mano Nazar Executive Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. M. S. Ross Managing Attorney Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Ms. Marjan Mashhadi Senior Attorney Florida Power & Light Company 801 Pennsylvania Avenue, NW, Suite 220 Washington, DC 20004 T. O. Jones Vice President, Nuclear Operations Mid-West Region Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408 Steven R. Catron Manager, Regulatory Affairs Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 U.S. Nuclear Regulatory Commission Resident Inspector=s Office Rural Route #1 Palo, IA 52324 Mr. Mano Nazar Senior Vice President and Nuclear Chief Operating Officer Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408 Mr. D. A. Curtland Plant Manager Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785 Abdy Khanpour Vice President, Engineering Support Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408 Daniel K. McGhee Iowa Department of Public Health Bureau of Radiological Health 321 East 12th Street Lucas State Office Building, 5th Floor Des Moines, IA 50319-0075 Chairman, Linn County Board of Supervisors 930 1st Street SW Cedar Rapids, IA 52404 Peter Wells, Acting Vice President, Nuclear Training and Performance Improvement Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Mark E. Warner Vice President, Nuclear Plant Support Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Richard L. Anderson Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785

Duane Arnold Energy Center Site Description ENCLOSURE 1 SITE DESCRIPTION The Duane Arnold Energy Center (DAEC) site is located on the western side of a north-south reach of the Cedar River, approximately 2.5 miles north-northeast of the Village of Palo, Iowa, in Linn County (T-84N, R-8W, Sections 9 and 10). The closest city is Cedar Rapids with its outer boundary being 8 miles to the southeast. The site is approximately 500 acres in size, on a flat strip of land running northeast and parallel to the Cedar River. The distance from the plant stack to the nearest site boundary is approximately 440 meters (m). A paved county highway provides access to the site.

TOPOGRAPHY A relatively flat plain approximate 750 feet (ft) above mean sea level (msl) extends from the site toward the village of Palo on the southwest, and most of this land is now being farmed. At Palo, the elevation is 747 to 750 ft. Across the river from the site, the land rises from an elevation of 750 ft to an elevation of about 900 ft within a horizontal distance of approximately 2000 ft.

These slopes are rather heavily wooded with only an occasional field or pasture dotting the landscape. Beyond this rise, the land is gently rolling farmland. To the northwest, the land rises to an elevation of 850 ft. Adjacent to the east is another heavily wooded low area that constitutes the current flood plain. This area is flat and extends approximately 1500 ft to the west bank of the river. The general topographical features in this portion of the Cedar River consist of broad valleys with relatively narrow flood plains. In many places, these broad valleys merge almost imperceptibly into the adjacent uplands. Away from the immediate vicinity of the river, the land is gently rolling farmland.

TRANSMISSION LINE CORRIDORS Five transmission-line systems extend westward in a 665-ft wide corridor from the southwest edge of the plant site for a distance of one mile to a north-south county road. Near this road, two 161-kV lines depart and continue within a 100-ft basic width corridor (generally narrower along railroad and public rights-of way) in a southerly direction. At the village of Palo, one of these lines follows a railroad right-of-way in a southeasterly direction to the Sixth Street substation in Cedar Rapids. The total distance of this line is 11.2 miles. The other 161-kV line continues in a southerly direction west of Cedar Rapids and then eastward, via Fairfax, to the Bertram substation. The total distance is 28 miles. The remaining 161-kV line and two 345-kV lines continue along a 500-ft wide corridor for a distance of 1.7 miles beyond the county road in a westerly direction. There, one 345 line turns south to the Hills substation, the other 345 line turns north to the Hazelton substation. The 161-kV line continues for a distance of 16 miles to the Garrison substation and then an additional 30 miles to the Washburn substation. A sixth transmission line leaves the plant site in a generally easterly direction, crosses the Cedar River, and continues for a distance of 8 miles to the Hiawatha substation.

Duane Arnold Site Boundary Map ENCLOSURE 2

Duane Arnold 6-Mile Vicinity Map ENCLOSURE 3

Duane Arnold Transmission System ENCLOSURE 4