ML091100139

From kanterella
Jump to navigation Jump to search

Cover Letter: Final Safety Evaluation for Boiling Water Reactors Owners Group Licensing Topical Report NEDC-33178P, General Electric Methodology for Development of Reactor Pressure Vessel Pressure-Temperature Curves
ML091100139
Person / Time
Site: Boiling Water Reactor Owners Group
Issue date: 04/27/2009
From: Blount T
Division of Policy and Rulemaking
To: Coleman D
Energy Northwest
Honcharik M, NRR/DPR/PSPB, 415-1774
Shared Package
ML091110060 List:
References
NEDC-33178P, TAC MD2693
Download: ML091100139 (2)


Text

April 27, 2009 Mr. Doug Coleman, Chair Boiling Water Reactor Owners Group Energy Northwest Columbia Generating Station Mail Drop PE20 P.O. Box 968 Richland, WA 99352-0968

SUBJECT:

FINAL SAFETY EVALUATION FOR BOILING WATER REACTORS OWNERS=

GROUP LICENSING TOPICAL REPORT NEDC-33178P, GENERAL ELECTRIC METHODOLOGY FOR DEVELOPMENT OF REACTOR PRESSURE VESSEL PRESSURE-TEMPERATURE CURVES (TAC NO. MD2693)

Dear Mr. Coleman:

By letter dated July 28, 2006, the Boiling Water Reactors Owners Group (BWROG) submitted Licensing Topical Report (LTR) NEDC-33178P, "General Electric Methodology for Development of Reactor Pressure Vessel Pressure-Temperature Curves," to the U.S. Nuclear Regulatory Commission (NRC) staff. By letter dated March 23, 2009, an NRC draft safety evaluation (SE) regarding our approval of LTR NEDC-33178P was provided for your review and comments. By e-mail dated April 13, 2009, the BWROG stated that they had no substantive comments on the draft SE.

The NRC staff has found that LTR NEDC-33178P is acceptable for referencing in licensing applications for General Electric-designed boiling water reactors to the extent specified and under the limitations delineated in the LTR and in the enclosed final SE. The final SE defines the basis for our acceptance of the LTR.

Our acceptance applies only to material provided in the subject LTR. We do not intend to repeat our review of the acceptable material described in the LTR. When the LTR appears as a reference in license applications, our review will ensure that the material presented applies to the specific plant involved. License amendment requests that deviate from this LTR will be subject to a plant-specific review in accordance with applicable review standards.

In accordance with the guidance provided on the NRC website, we request that BWROG publish accepted proprietary and non-proprietary versions of this LTR within three months of receipt of this letter. The accepted versions shall incorporate this letter and the enclosed final SE after the title page. Also, they must contain historical review information, including NRC requests for additional information and your responses. The accepted versions shall include an "-A" (designating accepted) following the LTR identification symbol.

If future changes to the NRC's regulatory requirements affect the acceptability of this LTR, the BWROG and/or licensees referencing it will be expected to revise the LTR appropriately, or justify its continued applicability for subsequent referencing.

Sincerely,

/RA/

Thomas B. Blount, Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 691

Enclosure:

Final SE cc w/encl: See next page

April 27, 2009 If future changes to the NRC's regulatory requirements affect the acceptability of this LTR, the BWROG and/or licensees referencing it will be expected to revise the LTR appropriately, or justify its continued applicability for subsequent referencing.

Sincerely,

/RA/

Thomas B. Blount, Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 691

Enclosure:

Final SE cc w/encl: See next page DISTRIBUTION:

PUBLIC PSPB Reading File RidsNrrDpr RidsNrrDprPspb RidsNrrPMMHoncharik RidsNrrLADBaxley RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNrrDci RidsNrrDciCvib SRosenberg (HardCopy)

ADAMS ACCESSION NOs.: Cover letter ML091100139 Final SE ML091100117 Package ML091110060

  • No major changes to SE input.

NRR-043 OFFICE PSPB/PM PSPB/LA CVIB/BC*

PSPB/BC DPR/DD NAME MHoncharik DBaxley (GLappert For)

MMitchell SRosenberg (MHoncharik for)

TBlount DATE 04/24/09 04/23/09 2/18/09 04/24/09 04/27/09 OFFICIAL RECORD COPY

BWR Owners= Group Project No. 691 Mr. Richard Libra Executive Vice Chair, BWR Owners= Group Exelon Generation Co, LLC 200 Exelon Way Mail Code KSA 2-N Kennett Square, PA 19348 Rick.libra@exeloncorp.com Mr. Richard Anderson BWROG, Executive Chair FPL Energy (DAEC)

Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 rich.anderson@fpl.com Mr. James F. Klapproth GE-Hitachi Nuclear Energy M/C A50 3901 Castle Hayne Road Wilmington, NC 28401 james.klapproth@ge.com Mr. Joseph E. Conen, Vice Chair Regulatory Response Group BWR Owners= Group DTE Energy-Fermi 2 200 TAC 6400 N. Dixie Highway Newport, MI 48166 conenj@dteenergy.com Dennis Madison, Hatch Vice President Southern Nuclear Operating Co.

11028 Hatch Parkway North Baxley, GA 31515-2010 drmadiso@southernco.com Frederick Emerson BWROG, Project Manager Frederick.emerson@ge.com Mr. Ken A. McCall, Program Manager GE-Hitachi Nuclear Energy M/C F12 3901 Castle Hayne Road Wilmington, NC 28401 kenneth.mccall@ge.com Oscar Limpias Entergy Nuclear Northeast 1340 Echelon Parkway.

Jackson, MS 39213-8202 olimpia@entergy.com Joe Donahue Progress Energy Inc.

410 S. Wilmington St.

PEB 6A Raleigh, NC 27601-1849 joe.w.donahue@pgnmail.com Paul J. Davison Hope Creek Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 paul.davison@pseg.com Mr. Ted Schiffley Vice Chairman, BWROG Exelon Generation Co., LLC.

Cornerstone II at Cantera 4300 Winfield Road Warrenville, IL 60555 frederick.schiffley@exeloncorp.com Mr. Randy C. Bunt, Chair Regulatory Response Group Southern Nuclear Operating Company 40 Inverness Center Parkway/Bin B057 Birmingham, AL 35242 rcbunt@southernco.com