ML091070195

From kanterella
Jump to navigation Jump to search
Requalification Program Inspection - Oyster Creek Nuclear Generating Station
ML091070195
Person / Time
Site: Oyster Creek
Issue date: 04/17/2009
From: Hansell S
Operations Branch I
To: Pardee C
Exelon Generation Co, Exelon Nuclear
Shared Package
ML083120023 List:
References
Download: ML091070195 (5)


Text

April 17, 2009 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Rd.

Warrenville, IL 60555

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - OYSTER CREEK NUCLEAR GENERATING STATION

Dear Mr. Pardee:

In a telephone conversation on April 13, 2009, Mr. Todd Fish, Sr. Operations Engineer, and Mr. Corey Goff, Operations Training Manager, made arrangements for the U. S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Oyster Creek facility. The inspection is planned for the week of June 1, 2009, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations and operating test scheduled for the week of the inspection to the NRC by May 25, 2009. Mr. Goff has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2009.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S.

Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C.

20503.

C.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC=s document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Fish at (610) 337-5369.

Sincerely,

/RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No.

50-219 License No.

DPR-16

C. G. Pardee The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC=s document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Fish at (610) 337-5369.

Sincerely,

/RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No.

50-219 License No.

DPR-16 SUNSI Review Complete: SLH (Reviewer=s Initials)

ADAMS PKG: ML083120023 ADAMS ACC#ML091070195 DOCUMENT NAME: G:\\DRS\\Operations Branch\\FISH\\Requal FY09-OC Jun09\\60dayrpi.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/DS/CB TFish/TF SLHansell/SLH DATE 4/15/09 4/16/09 4/17/09 OFFICIAL RECORD COPY

C. G. Pardee Cc:

C. Crane, President and Chief Operating Officer, Exelon Corporation M. Pacilio, Chief Operating Officer, Exelon Nuclear T. Rausch, Site Vice President, Oyster Creek Nuclear Generating Station P. Orphanos, Plant Manager, Oyster Creek Generating Station J. Barstow, Regulatory Assurance Manager, Oyster Creek J. Grimes, Acting Senior Vice President, Mid-Atlantic Operations K. Jury, Vice President, Licensing and Regulatory Affairs G. Ludlam, Director, Training P. Cowan, Director, Licensing B. Fewell, Associate General Counsel, Exelon Correspondence Control Desk, Exelon Nuclear Mayor of Lacey Township P. Mulligan, Chief, NJ Dept of Environmental Protection R. Shadis, New England Coalition Staff E. Gbur, Chairwoman - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance P. Baldauf, Assistant Director, NJ Radiation Protection Programs

C.

E-Mail Distribution:

S. Collins, RA M. Dapas, DRA D. Roberts, DRS P. Wilson, DRS D. Lew, DRP J. Clifford, DRP R. Bellamy, DRP S. Barber, DRP C. Newport, DRP M. Ferdas, DRP, SRI J. Kulp, DRP, RI J. DeVries, DRP, OA S. Campbell, RI OEDO H. Chernoff, NRR R. Nelson, NRR E. Miller, PM, NRR J. Hughey, NRR, Backup T. Fish, DRS Examiner, DRS L. Vick, NRR/ADRO/DIRS/IOLB S. Hansell, DRS Distribution:

C. Bixler, DRS (OL Facility File)