From:
Jason Paige Sent:
Tuesday, March 31, 2009 4:01 PM To:
Tomonto, Bob; Olga_Hanek@fpl.com Cc:
Siva Lingam; Tom Boyce (NRR)
Subject:
Acceptance Letter RE LAR No. 195, Removal of TS 3.4.10 and to Extend the RCP Flywheel Inspection Interval
SUBJECT:
TURKEY PPOINT, UNITS 3 AND 4 - ACCEPTANCE LETTER RE LICENSE AMENDMENT REQUEST TO DELETE TS 3.4.10 AND TO IMPLEMENT TS IMPROVEMENT TO EXTEND THE INSPECTION INTERVAL FOR REACTOR COOLANT PUMP FLYWHEELS (TAC NOS. ME0701 AND ME0702)
Dear Mr. Nazar:
By letter dated February 16, 2009, Florida Power & Light submitted a license amendment for Turkey Point Units 3 and 4. The proposed amendment would remove the structural integrity requirements contained in TS 3.4.10 and the associated bases from the Turkey Point TSs. Also, the proposed amendment will also extend the reactor coolant pump motor flywheel examination frequency from the currently approved 10-year inspection interval, to an interval not to exceed 20 years. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact the Turkey Point Project Manager, Jason Paige, at (301) 415-5888.
Jason Paige, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: (301) 415-5888
E-mail Properties Mail Envelope Properties ()
Subject:
Acceptance Letter RE LAR No. 195, Removal of TS 3.4.10 and to Extend the RCP Flywheel Inspection Interval Sent Date: 3/31/2009 3:40:03 PM Received Date: 3/31/2009 4:01:00 PM From: Jason Paige Created By: Jason.Paige@nrc.gov Recipients:
Bob_Tomonto@fpl.com (Tomonto, Bob)
Tracking Status: None Olga_Hanek@fpl.com (Olga_Hanek@fpl.com)
Tracking Status: None Siva.Lingam@nrc.gov (Siva Lingam)
Tracking Status: None Tom.Boyce@nrc.gov (Tom Boyce (NRR))
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 11121 3/31/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: