Summary of Category 1 Public Meeting with Calvert Cliffs Nuclear Power Plant, Inc. and Areva to Discuss Transitioning from Westinghouse to Areva Fuel
ML090850229
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/30/2009
From: Pickett D
Plant Licensing Branch 1
To:
Pickett D
References
TAC ME0887, TAC ME0888
Download: ML090850229 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 M3rch .:n, 2['('A LICENSEE: Calvert Cliffs Nuclear Power Plant, Inc.

FACILITY: Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2

SUBJECT:

SUMMARY

OF MARCH 19,2009, CATEGORY 1 PUBLIC MEETING WITH CALVERT CLIFFS NUCLEAR POWER PLANT, INC. AND AREVA TO DISCUSS TRANSITIONING FROM WESTINGHOUSE TO AREVA FUEL (TAC NOS.

ME0887 AND ME0888)

On March 19, 2009, a public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives of Calvert Cliffs Nuclear Power Plant, Inc. and AREVA at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, MD. The purpose of the meeting was to discuss the licensee's planned transition from Westinghouse to AREVA fuel.

The licensee stated their intention to transition from Westinghouse to AREVA fuel citing superior fuel performance. They intend to start loading AREVA fuel in Unit NO.2 beginning in the spring 2011 refueling outage and complete transitioning by spring 2015. Similarly, Unit NO.1 will begin loading AREVA fuel in spring 2012 and complete transitioning by spring 2016. Calvert Cliffs will be the last of the Combustion Engineering plants with 14x14 fuel assemblies to switch to AREVA fuel (the others being Millstone Unit No.2, Fort Calhoun, and St Lucie Unit No.1).

The licensee cited recent experience using AREVA lead fuel assemblies (LFAs) at Calvert Cliffs. Four AREVA LFAs with M5' cladding have been twice burned in Unit NO.2. All four LFAs were inspecting during the spring 2007 refueling outage and two LFAs are currently located in high burnup regions in Unit NO.1 for a third cycle to evaluate fuel performance beyond the current limit of 60 GWD/MTU up to a projected peak pin burnup of 70 GWD/MTU.

The licensee plans to make a single submittal no later than January 2010. The submittal will include technical specification changes, a proposed permanent exemption to use AREVA fuel with M5' cladding, and 2 of the 13 analyses from the Updated Final Safety Analysis Report (UFSAR) that will be reanalyzed by AREVA. The 2 analyses will be the realistic large-break loss-of-coolant accident and the loss of forced reactor coolant flow. The licensee provided their schedule for completing the remaining analyses which will be available for NRC audit.

Discussions with the NRC staff focused on the level of detail necessary in the upcoming submittal and included the following comments and observations:

  • The staff pointed out that AREVA has not submitted topical reports on their fuel similar to other fuel vendors. The staff will expect the submittal to include fuel descriptions and design criteria similar to that found in topical reports.
  • The staff voiced concern about how the licensee intends to justify peak pin burnup from 60 to 62 GWD/MTU. All aspects of increased fuel burnup will need to be addressed.

Examples include dose calculations, fuel handling, mixed-core, and environmental concerns.

-2

  • Details of the proposed changes to the licensing basis were not included in the presentation. The licensee was reminded that all aspects of their licensing basis will need to be justified. An example of this concern is found on slide 8 where it is stated that "Calvert Cliffs fuel assemblies will be essentially the same design .... " (emphasis added).
  • The licensee plans to replace the incore monitoring system (CECORIBASSS) with the AREVA incore monitoring system (POWERTRAX). The staff notes that conversions of this type typically occur over several years with an ongoing comparison of the uncertainties associated with the various core parameters being monitored. The submittal should discuss the time frame and method (i.e., 10 CFR 50.59 versus 10 CFR
90) of the planned conversion.
  • As discussed above, 11 of the 13 UFSAR safety analyses to be re-performed by AREVA will not be included in the submittal. If the computer codes to be used in these analyses are currently known, it would desirable to identify them in the submittal.
  • The staff requested that justification be provided for any UFSAR safety analysis that is not re-performed.

Members of the public representing Westinghouse and Mitsubishi were in attendance. Public Meeting Feedback forms were available but comments were not received.

A list of meeting attendees is enclosed. A copy of the licensee's handouts can be found at Agencywide Documents Access and Management System Accession No. ML090780272.

Please direct any inquiries to me at 301-415-1364, or Douglas.Pickett@nrc.gov.

Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactors Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318

Enclosure:

As stated Distribution via Listserv

LIST OF ATrENDEES MARCH 19,2009, MEETING WITH CALVERT CLIFFS NUCLEAR POWER PLANT, INC.

AND AREVA TRANSITION FROM WESTINGHOUSE TO AREVA FUEL Calvert Cliffs Nuclear Power Plant. Inc. AREVA Pat Furio Rod Kliewer Kevin Neitmann Bob Baxter Tim Schearer Gayle Elliott Philip Wengloski John Link NRC Mark Kowal Shih-Liang Wu Ben Parks Paul Clifford Mathew Panicker Doug Pickett Members of the Public Leslie Collins (Westinghouse)

Jin Chung (Mitsubishi)

Enclosure

- 2

  • Details of the proposed changes to the licensing basis were not included in the presentation. The licensee was reminded that all aspects of their licensing basis will need to be justified. An example of this concern is found on slide 8 where it is stated that "Calvert Cliffs fuel assemblies will be essentially the same design .... " (emphasis added).
  • The licensee plans to replace the incore monitoring system (CECOR/BASSS) with the AREVA incore monitoring system (POWERTRAX). The staff notes that conversions of this type typically occur over several years with an ongoing comparison of the uncertainties associated with the various core parameters being monitored. The submittal should discuss the time frame and method (Le., 10 CFR 50.59 versus 10 CFR
90) of the planned conversion.
  • As discussed above, 11 of the 13 UFSAR safety analyses to be re-performed by AREVA will not be included in the submittal. If the computer codes to be used in these analyses are currently known, it would desirable to identify them in the submittal.
  • The staff requested that justification be provided for any UFSAR safety analysis that is not re-performed.

Members of the public representing Westinghouse and Mitsubishi were in attendance. Public Meeting Feedback forms were available but comments were not received.

A list of meeting attendees is enclosed. A copy of the licensee's handouts can be found at Agencywide Documents Access and Management System Accession No. ML090780272.

Please direct any inquiries to me at 301-415-1364, or Douglas.Pickett@nrc.gov.

IRA!

Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactors Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318

Enclosure:

As stated Distribution via Listserv DISTRIBUTION:

PUBLIC LPLI-1 r/f RidsAcrsAcnw_MailCTR Resource RidsNrrPMDPickett RidsNrrLAS Little RidsOgcRp Resource RidsRgn1 MailCenter Resource CTucci, NRR LTrocine, EDO RidsNrrDssSrxb RidsNrrDssSnpb BParks, SRXB PClifford, DSS SWu, SRXB MPanicker, SNPB GDentel, R1 ADAMS Accession No. PKG ML090850244 Meeting Notice ML090500152 Meeting Summary ML090850229 Handou~ML090780272 OFFICE LPL1-1/PM LPL1-1/LA LPL1-1/BC NAME DPickett SLittie JBoska for MKowal DATE 3/30/09 3/30/09 3/30/09 OFFICIAL RECORD COpy