ML090790404
| ML090790404 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 03/20/2009 |
| From: | Beltz T Plant Licensing Branch III |
| To: | Scarpello M American Electric Power Co, Indiana Michigan Power Co |
| beltz T, NRR/DORL/LPL3-1, 301-415-3049 | |
| References | |
| TAC ME0770 | |
| Download: ML090790404 (2) | |
Text
ADAMS Accession No.: ML090790404 From:
Terry Beltz Sent:
Friday, March 20, 2009 10:25 AM To:
mkscarpello@aep.com Cc:
'pgschoepf@aep.com'; 'rsptacek@aep.com'; 'jazwolinski@aep.com'; Marshall David; Karl Feintuch
Subject:
Donald C. Cook Nuclear Plant, Unit 2 - Acceptance Review re: Relief Request ISIR-30
Dear Mr. Scarpello:
By letter dated February 27, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090630055), Indiana Michigan Power Company submitted a relief request for the Donald C. Cook Nuclear Plant, Unit 2. The proposed relief request (ISIR-30) pertains to extending the inservice inspection interval for visual examinations of the reactor pressure vessel interior attachments beyond the beltline region and core support structure.
Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations, the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
The purpose of this letter is to provide the final results of the NRC staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
Should you have any questions regarding this review, please contact me at (301) 415-3049.
Sincerely, Terry A. Beltz, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
(301) 415-3049 Terry.Beltz@nrc.gov E-mail Properties Mail Envelope Properties ()
Subject:
Donald C. Cook Nuclear Plant, Unit 2 - Acceptance Review re: Relief Request ISIR-30 Sent Date: 3/20/2009 10:10:25 AM Received Date: 3/20/2009 10:25:00 AM From: Terry Beltz Created By: Terry.Beltz@nrc.gov Recipients:
mkscarpello@aep.com (mkscarpello@aep.com)
Tracking Status: None pgschoepf@aep.com ('pgschoepf@aep.com')
Tracking Status: None rsptacek@aep.com ('rsptacek@aep.com')
Tracking Status: None jazwolinski@aep.com ('jazwolinski@aep.com')
Tracking Status: None Marshall.David@nrc.gov (Marshall David)
Tracking Status: None Karl.Feintuch@nrc.gov (Karl Feintuch)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 11178 3/20/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: