NUREG-0053, Suppl. 12, Safety Evaluation Report Related to the Operation of North Anna Power Station Unit 2
ML090720817
Person / Time
Site: North Anna Dominion icon.png
Issue date: 08/31/1980
From:
Office of Nuclear Reactor Regulation, Virginia Electric & Power Co (VEPCO)
To:
References
FOIA-2024-000060 NUREG-0053 S12
Download: ML090720817 (20)


Text

NUREG-0053 Supplement No. 12 Safety Evaluation Report related to the operation of North Anna Power Station, Unit 2 Docket No. 50-339 Virginia Electric and Power Company Supplement No. 12 August 1980 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission

Available from GPO Sales Program Division of Technical Information and Document U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Printed copy price: §1.75 and National Technical Information Service Springfield, Virginia

NUREG-0053 Supplement No. 12 Safety Evaluation Report

-related to the operation of North Anna Power Station, Unit 2 Docket No. 50-339 Virginia Electric and Power Company Supplement No. 12 August 1980 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission

TABLE OF CONTENTS

1.0 INTRODUCTION

AND GENERAL DISCUSSION 1.1 Introduction........

22.0 TMI-2 REQUIREMENTS 22.2 Full Power Requirements III.

Emergency Preparation and Radiation Preparedness III.A.1.1 Upgrade Emergency Preparedness.

23.0 CONCLUSION

S...................

Appendix A Continuation of Chronology of Radiological Review iii 1-1 1-1 l2-1 22-1 22-1 22-1 23-1 A-I

1.0 INTRODUCTION

AND GENERAL DISCUSSION 1.1 Introduction On June 4, 1976, the Nuclear Regulatory Commission (Commission) issued its Safety Evaluation Report regarding the application by the Virginia Electric and Power Company (VEPCO, licensee) for licenses to operate the North Anna Power Station, Units 1 and 2.

The Safety Evaluation Report was supplemented by Supplement No.1 through 11 which documented the resolution of several outstanding issues in further support of the licensing activities.

On November 26, 1977, the Facility Operating License NPF-4 was issued for North Anna Power Station, Unit 1.

The license permitted fuel to be loaded into Unit 1 and was subsequently amended [Amendment No. 3J on April 1, 1978 to permit Unit 1 to operate at 100 percent power.

On April 10, 1980, the Commission issued Supplement No. 10 to the Safety Evaluation Report related to the issuance of an operating license for North Anna Power Station, Unit 2.

This action permitted VEPCO to load fuel and to achieve criticality, and to operate Unit 2 at power levels not to exceed five percent of full power, i.e., low power operation in accordance with require-ments developed from the lessons learned from the TMI-2 accident.

Subsequently on July 3, 1980, authorization was granted by the NRC to VEPCO to conduct its special low power test program.

The program consisted of conducting seven special tests involving conditions for natural circulation heat removal.

Training was provided for the operators during the conduct of the tests. Further 1-1

details of the program and the results are given in Section 22.2 Item I.G.1 of Supplement No. 11 to the Safety Evaluation Report.

In August, 1980 we issued Supplement No. 11 to the Safety Evaluation Report.

In Supplement No. 11 we concluded that subject to resolving matters related to emergency preparedness, the operating license can be issued to allow power operation at full rated power (2775 megawatts thermal).

The purpose of this supplement is to update the safety evaluation presented in Section 22.2 (Item III.A.l.l) of Supplement No. 11 to the Safety Evaluation Report related

(

to emergency preparedness.

In this report we stated that prior to authorizing full power a successful emergency exerCise had to be Rerformed. This was accomJ)lished on August 16, 1980.

Secti-on 22.2 (Item III.A.l.I) is supplementary to and not in lieu of the discussion in the Safety Evaluation Report and the supplements thereto, except where specifically noted. Appendix A is a continuation of the chronology of any principal actions related to the processing of the application.

On the basis of staff review including a letter from FEMA d-ated August 19, 1980, we conclude that the North Anna, Unit 2 facility may be operated safely at full power in accordance with the facility Technical Specifications without undue risk to the health and safety of the general public.

1-2

22.0 TMI-2 REQUIREMENTS 22.2 FULL POWER REQUIREMENTS III.

Emergency Preparations and Radiation Protection III.A.l.l Upgrade Emergency Preparedness POSITION

a. Provide an emergency response plan in substantial compliance with NUREG-0654, IICriteria for Preparation and Evaluation of Radiological Response Plans and Preparedness in Support of Nuclear Power Plants" (which may be modified after May 13, 1980, based on public comments) except that only a description of a completion schedule for the means for providing prompt notification to the population (App. 3), the staffing for emergencies in addition to that already required (Table B.l), and an upgraded meteorological program (App. 2) need be provided.

NRC will give substantial weight to FEMA findings on offsite plans in judging the adequacy against NUREG-0654.

b.

Perform an emergency reponse exercise to test the integrated capability and a major portion of the basic elements existing within emergency preparedness plans and organizations.

DISCUSSION AND CONCLUSIONS In Section 22.2 (Item III.A.l.l) of Supplement No. 11 to the Safety Evaluation Report, we stated that we reviewed the applicant's revised emergency plan and found that it is in substantial comoliance witb NUREG-0654 and meets the requirements of 10 CFR 50, Appendix E.

We also stated that, the Federal Emergency Management Agency was reviewing the State and local emergency plans and that we had not received their findings and determinations.

We also stated that 22-1

prior to authorizing full power operation, we would require a successful emergency response exercise to test the integrated capability and a major portion of the basic elements existing within emergency preparedness plans and organizations.

The Federal Emergency Management Agency (FEMA) has reviewed the State and local radiological emergency response plans and found them to be in substantial compliance with NUREG-0654.

Based on that review and the successful Joint Emergency Response Exercise conducted on August 16, 1980, FEMA stated in a letter dated August 19, 1980, that the State and local governments have successfully demonstrated the capability to respond to a radiological emergency.

Based on our review of the FEMAls findings on State and local radio-logical emergency preparedness and our ev_aluation of the successful Joint Emergency Response Exercise, we conclude that the emergency preparedness program for North Anna and the related emergency planning zones is acceptable, capable of being implemented and meets the regulatory requirements of 10 CFR 50, Appendix E.

23.0 CONCLUSION

S Based on our evaluation of the application as set forth in our Safety Evaluation Report issued on June 4, 1976 and Supplement Nos. 1 through 11 and our evaluation as set forth in this supplement, we conclude that the operating license can be issued to allow power operations at full rated power (2775 megawatts thermal) subject to license conditions which will require further Commission approval and license amendments before the stated condition can be removed.

We conclude that the construction of the facility has been completed in accordance with the requirements of Section 50.57(a)(I) of 10 CFR Part 50, and that construction of the facility has been monitored in accordance with the inspection program of the Commission's staff.

Subsequent to the issuance of the operating license for full rated power for the North Anna Power Station, Unit 2, the facility may then be operated only in accor-dance with the Commission's regulations and the conditions of the operating license under the continuing surveillance of the Commission's staff.

We conclude that the activities authorized by the license can be conducted without endangering the health and safety of the public, and we reaffirm our conclusions as stated in our Safety Evaluation Report and its supplements.

23-1

July 16, 1980 July 18, 1980 July 22, 1980 July 22, 1980 July 23, 1980 July 25, 1980 July 28, 1980 July 28, 1980 July 30, 1980 July 30, 1980 July 31, 1980 August 4, 1980 August 12, 1980 August 12, 1980 August 18, 1980 APPENDIX A Continuation of Chronology of Radiological Review Letter from applicant concerning auxiliaryfeedwater system requirements.

Letter from applicant supporting their request for a full power license. Letter discusses emergency plan implementing procedures.

Letter to applicant concerning emergency preparedness program for a full power license.

Letter from applicant concerning mu1tiple structure ARS concern.

Representatives from PSE&G, VEPCO, TVA & NRC meet in Bethesda, Maryland to discuss matters related to TMI-2 dated requirements.

(Summary issued August 8, 1980.)

Letter from applicant concerning multiple structure ARS concern.

Letter from appl i cant concerning NUREG-0588 and concerning safety in start-up and operation of North Anna Unit 2.

Letter from applicant concerning Auxiliary Feedwater System Requirement.

Letter from Applicant concerning multiple structure ARS concern.

Letter from applicant concerning containment pressure boundary fracture toughness requirements.

Letter to applicant (generic) concerning interim criteria for shift staffing.

Letter to applicant concerning emergency action levels of Section 4 *..

Representatives from VEPCO, the State of Virginia and NRC Staff meet in Bethesda, Maryland to be briefed on the planned joint emergency exercise.

Letter to applicant transmitting 20 copies of Supplement No. 11 of the North Anna, Unit No. 2 Safety Evaluation Report.

Letter to applicant transmitting Amendment No.2 to License NPF-7 granting an exception to Technical Specification 8.1 of Appendix A to perform a water hammer demonstration test.

NRC FORM 335 U.S. NUCLEAR REGULATORV COMMISSION

1. REPORT N UMBE R (Assigned by DOC)

(7-77)

NUREG-0053 BIBLIOGRAPHIC DATA SHEET Supplement No. 12

4. TITLE AND SUBTITLE (Add Volume Np., if appropriate)
2. (Leave blank)

Safety Evaluation Report Relateq to the Operation of North Anna Power Station, Unit 2

3. RECIPIENT'S ACCESSION NO.
7. AUTHOR(S)
5. DATE REPORT COMPLETED MONTH I YEAR AUGUST 1980
9. PERFORMING ORGANIZATION NAME AND MAILING ADDRESS (Include Zip Code)

DATE REPORT ISSUED U. S. Nuclear Regulatory Commission MONTH I YFI' q Office of Nuclear Reactor Regulation AUGUST 1980 Washington, D. C.

20555

6. (Leave blank)
8. (Leave blank)
12. SPONSORING ORGANIZATION NAME AND MAILING ADDRESS (Include Zip Code)
10. PROJECT/TASK/WORK UNIT NO.

Same as 9, above.

11. CONTRACT NO.
13. TYPE OF REPORT I

PERIOD COVERED (Inclusive dates)

Safety Evaluation Report Supplement August 5, 1980 - August 21, 1980

15. SUPPLEMENTARY NOTfS
14. (Leave blank)

Docket No.: 50-339

16. ABSTR,tI.CT (200 words or less)

On June 4, 1976, the Nuclear Regulatory Commission issued its Safety Evaluation regarding the application for licenses to operate the North Anna Power Station, Units 1 & 2.

The application was filed by Virginia Electric and Power Company.

Supplement No.1 to the Safety Evaluation Report was issued on June 30, 1976; Supplement No.2 was issued August 2, 1976; Supplement No. 3 was issued on September 15, 1976; Supplement No. 4 was issued on December 8, 1976; Supplement No. 5 was issued on December 29, 1976; Supplement No. 6 was issued on February 2, 1977; Supplement No. 7 was issued on August 18, 1977; Supplement No. 8 was issued on December 14, 1977; Supplement No. 9 was issued on March 31, 1978; and Supplement No. 10 was issued on April 10, 1980. Supplements 1 through 9 documented the resolution of several outstanding items. Supplement No. 10 addresses the requirements for fuel loading and conducting low power testing of North Anna Unit 2.

Supplement No. 11 addresses the requirements which must be completed prior.to the issuance of a full power operating license for Unit 2. This Supplement, No. 12 addresses emergency preparedness.

17. KEY WORDS AND DOCUMENT ANALYSIS 17a. DESCRIPTORS 17b. IDENTIFIERS/OPEN-ENDED TERMS lB. AVAILABILITY STATEMENT
19. SECURITY CLASS (This report)
21. NO. OF PAGES lint"' 1 ;t c: cd of; ~rI Unlimited
20. SEC~lRITY 1fi~SiThiSpage)
22. PRICE line-.a~si 'i S

NRC FORM 335 (7-77)

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D, C.20555 OFFICIALfiuslNESS PENALTY FOR PRIVATE USE, $300 POSTAGE ANO FEES PAlO U.S. NUCLEAR REGULATORY COMMISSION

(/)2 Cc:

"tI:c

tim 2C) 06
  • 0

.... (J'1 N~W

(/)

m

c
c m

r-

~

m C

d

-t

z:

m o "tI m

c

~

5 2 o 2 o

c

-t

z: >>

2 2 >>

"tI o

E m
c

~

~

o 2

~

C 2

j N

C C)

C

~

U)

~