Text
Inspection / Activity Plan Page 1 of 2 03/04/2009 07:33:27 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site North Anna PSB1-RP
- RP INSPECTION ACCESS CONTROLS (OUTAGE) 2 1, 2 IP Access Control to Radiologically Significant Areas 7112101 03/09/2009 03/13/2009 EB3ISI
- UNIT 1 INSERVICE INSPECTION 3
1 IP Inservice Inspection Activities - PWR 7111108P 03/16/2009 03/20/2009 EB3SGISI
- UNIT 1 STEAM GENERATOR INSERVICE INSP 1
1 IP Inservice Inspection Activities - PWR 7111108P 03/16/2009 03/20/2009 EB3TI172
1 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 03/16/2009 03/20/2009 PSB1-RP
- RADIATION PROTECTION PUBLIC BASELINE 3
1, 2 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 06/22/2009 06/26/2009 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 06/22/2009 06/26/2009 1, 2 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 06/22/2009 06/26/2009 1, 2 IP Performance Indicator Verification 71151 06/22/2009 06/26/2009 ISFSI
- ISFSI OPERATIONAL INSPECTION 2
1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 07/01/2009 10/15/2009 PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 1
1, 2 IP Alert and Notification System Testing 7111402 07/06/2009 07/10/2009 1, 2 IP Emergency Response Organization Augmentation Testing 7111403 07/06/2009 07/10/2009 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 07/06/2009 07/10/2009 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 07/06/2009 07/10/2009 1, 2 IP Performance Indicator Verification 71151 07/06/2009 07/10/2009 TFPI
- TRIENNIEL FIRE PROTECTION INSPECTION 6
1, 2 IP Fire Protection [Triennial]
7111105T 09/14/2009 09/18/2009 1, 2 IP Fire Protection [Triennial]
7111105T 09/28/2009 10/02/2009 EB1-CDBI
- COMPONENT DESIGN BASIS INSPECTION 5
1, 2 IP Component Design Bases Inspection 7111121 10/19/2009 10/23/2009 1, 2 IP Component Design Bases Inspection 7111121 11/02/2009 11/06/2009 1, 2 IP Component Design Bases Inspection 7111121 11/16/2009 11/20/2009 1, 2 IP Component Design Bases Inspection 7111121 12/07/2009 12/11/2009 OL RQ
- REQUAL INSPECTION 2
1, 2 IP Licensed Operator Requalification Program 7111111B 01/11/2010 01/15/2010 OL EXAM
- INITIAL EXAM PREP 4
1 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES V23333 05/17/2010 05/21/2010 OL EXAM
- INITIAL EXAM - WEEK 1 4
1 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES V23333 06/07/2010 06/11/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Inspection / Activity Plan Page 2 of 2 03/04/2009 07:33:27 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site North Anna OL EXAM
- INITIAL EXAM - WEEK 2 4
1 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES V23333 06/21/2010 06/25/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.