Inspection / Activity Plan Page 1 of 2 03/04/2009 10:32:30 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Farley EB3-ISI

- UNIT 1 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 04/06/2009 04/10/2009 EB3TI172

- REACTOR COOLANT SYSTEM DISSIMILIAR METAL 1

1 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 04/06/2009 04/10/2009 PSB1-RP

- RADIATION PROTECTION ACCESS (OUTAGE) 1 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 04/06/2009 04/10/2009 1, 2 IP Access Control to Radiologically Significant Areas 7112101 04/06/2009 04/10/2009 1, 2 IP Performance Indicator Verification 71151 04/06/2009 04/10/2009 PSB1EP

- EP REVIEW PI AND PLAN CHANGES 1

1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 04/27/2009 05/01/2009 1, 2 IP Performance Indicator Verification 71151 04/27/2009 05/01/2009 ISFSI

- ISFSI OPERATIONAL INSPECTION 2

1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 07/01/2009 12/31/2009 PSB1-RP

- RADIATION PROTECTION PUBLIC CORNERSTONE 3

1, 2 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 08/10/2009 08/14/2009 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 08/10/2009 08/14/2009 1, 2 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 08/10/2009 08/14/2009 1, 2 IP Performance Indicator Verification 71151 08/10/2009 08/14/2009 PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

1, 2 IP Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 2515/175 09/14/2009 09/18/2009 1, 2 IP Alert and Notification System Testing 7111402 09/14/2009 09/18/2009 1, 2 IP Emergency Response Organization Augmentation Testing 7111403 09/14/2009 09/18/2009 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 09/14/2009 09/18/2009 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 09/14/2009 09/18/2009 1, 2 IP Performance Indicator Verification 71151 09/14/2009 09/18/2009 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 5

1 IP Identification and Resolution of Problems 71152B 11/02/2009 11/06/2009 1

IP Identification and Resolution of Problems 71152B 11/16/2009 11/20/2009 INSP

- MODS/50/59 INSPECTION 3

1 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 01/25/2010 01/29/2010 1

IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 02/01/2010 02/05/2010 OL RQ

- REQUAL INSPECTION 2

1, 2 IP Licensed Operator Requalification Program 7111111B 02/01/2010 02/06/2010 INIT

- INITIAL EXAM PREP 5

1 FARLEY/MARCH 2010 EXAM AT POWER FACILITIES V23323 02/08/2010 02/12/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 03/04/2009 10:32:30 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Farley OL EXAM

- INITIAL EXAM - WEEK 1 6

1 FARLEY/MARCH 2010 EXAM AT POWER FACILITIES V23323 03/01/2010 03/05/2010 OL EXAM

- INITIAL EXAM - WEEK 2 6

1 FARLEY/MARCH 2010 EXAM AT POWER FACILITIES V23323 03/15/2010 03/19/2010 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 3

1, 2 IP Exercise Evaluation 7111401 04/05/2010 04/09/2010 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 04/05/2010 04/09/2010 1, 2 IP Performance Indicator Verification 71151 04/05/2010 04/09/2010 PSB1-RP

- RP OCCUPATIONAL BASELINE WEEK1 2

1, 2 IP Access Control to Radiologically Significant Areas 7112101 04/12/2010 04/16/2010 1, 2 IP ALARA - Required 7112102-7112102R 04/12/2010 04/16/2010 1, 2 IP Radioactive Material Processing and Transportation 7112202 04/12/2010 04/16/2010 1, 2 IP Performance Indicator Verification 71151 04/12/2010 04/16/2010 PSB1-RP

- RP OCCUPATIONAL BASELINE WEEK 2 2

1, 2 IP Access Control to Radiologically Significant Areas 7112101 04/26/2010 04/30/2010 1, 2 IP ALARA - Required 7112102-7112102R 04/26/2010 04/30/2010 1, 2 IP Radioactive Material Processing and Transportation 7112202 04/26/2010 04/30/2010 1, 2 IP Performance Indicator Verification 71151 04/26/2010 04/30/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.