MONTHYEARML23341A2002023-12-0707 December 2023 Email - Indian Point Energy Center Generating Units 1, 2, and 3 Implementation Notice of Amendment No. 67, 300 and 276 to Independent Spent Fuel Storage Installation Only Emergency Plan (Ioep) ML23332A0802023-11-0808 November 2023 Email from State of New York on the Revised License Amendment for Indian Point Energy Center ISFSI Only Emergency Plan ML23325A1632023-11-0808 November 2023 State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23331A9542023-11-0808 November 2023 Email - State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23144A3452023-05-25025 May 2023 Adam Kahn of Monsey, New York Email Against Treated Water Release from Indian Point Site ML23144A3442023-05-25025 May 2023 Peggy Kurtz of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23144A3392023-05-25025 May 2023 David Morris of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3502023-05-25025 May 2023 Dan Kwilecki of Montebello, New York Email Against Treated Water Release from Indian Point Site ML23144A3422023-05-25025 May 2023 Peter Duda of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3382023-05-25025 May 2023 Dawn Giambalvo of Jersey City, New Jersey Email Against Treated Water Release from Indian Point Site ML23136B1622023-05-15015 May 2023 Town of North Salem, County of Westchester, New York Board Resolution Letter Regarding Treated Water Release from Indian Point Site ML23109A0632023-04-17017 April 2023 Email Acceptance Review for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML23055A1112023-02-23023 February 2023 Alyse Peterson Email- NYSERDA No Comments on Indian Point Unit 2 - Regarding Holtec License Amendment Request to Revise Permanently Defueled Technical Specifications and Staffing Requirements with Spent Fuel Transfer to ISFSI (Dockets 50-24 ML23049A0032023-02-14014 February 2023 NRC Acceptance Email to Holtec for License Amendment Request for Approval of New ISFSI-Only Emergency Plan and Associated EAL Scheme ML22313A1682022-11-0909 November 2022 NRC Response to Updates to the Proposed Amended IP2 Master Trust ML22308A0912022-11-0303 November 2022 Email Acknowledgement for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML22276A1642022-09-29029 September 2022 New York State Revised Draft EA Response E-Mail ML22271A8492022-09-28028 September 2022 E-Mail Transmitting Revised Indian Point Exemption Draft EA ML22269A3452022-09-22022 September 2022 Email Objection to Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2, EPID L-2022-LLA-0072 ML22259A1992022-09-0202 September 2022 Acceptance for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22265A0142022-08-31031 August 2022 Email Acknowledgement for Amended and Restated Holtec IP3 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 3 ML22242A2592022-08-19019 August 2022 E-mail from K. Sturzebecher, NRC, to B. Noval, HDI, Acknowledgement for Amended and Restated Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2 ML22228A1332022-08-0909 August 2022 Acknowledgement for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22215A0432022-08-0101 August 2022 E-Mail Transmitting NYS NSA Exemption Comments & Draft EA Review Completion ML22208A0292022-07-19019 July 2022 E-Mail Transmitting Indian Point Exemption Draft EA ML22168A0072022-06-16016 June 2022 Acceptance Review for License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22112A0102022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 50.54(w)(1) Concerning Indian Point Energy Center Onsite Property Damage Insurance ML22112A0122022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance for Indian Point Energy Center ML22103A2432022-04-13013 April 2022 E-mail - Request for Additional Information - License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme for Permanently Defueled Condition for Indian Point Energy Center ML22104A0342022-04-13013 April 2022 E-mail from Z. Cruz, NRC to J. Fleming, Holtec - Request for Additional Information Related to Request for Exemption from Portions of 10 CFR 50.47 and Part 50 Appendix E for Indian Point Energy Center ML22038A2572022-02-0707 February 2022 E-mail from Z. Cruz, NRC, to J. Fleming, HDI - Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition for Indian Point Energy Center ML22035A1862022-02-0404 February 2022 E-mail to J. Fleming, Holtec, from Z. Cruz Perez, NRC - Acceptance Review: Exemption Requests from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E, Section IV for Indian Point Energy Center ML22028A1032022-01-28028 January 2022 E-mail Dated 1/28/2022, Transmittal of Draft Safety Evaluation for Proposed License Amendment Revision to Licensing Basis to Incorporate the Installation and Use of of New Auxiliary Lifting Device ML22038A1592022-01-24024 January 2022 NRR E-mail Capture - (External_Sender) 2021 IPEC Annual Sturgeon Impingement Report ML22006A0442022-01-0505 January 2022 Email from Z Cruz to J Fleming Request for Additional Information - HDI Indian Point Post-Shutdown Decommissioning Activities Report ML21337A2952021-12-0303 December 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (E-mail Dated 12/3/2021) ML21335A3692021-12-0101 December 2021 Acceptance Review: Indian Point Energy Center - Exemption Request from 10 CFR Part 20 App G Section Iii.E ML21266A2972021-08-18018 August 2021 8/18/2021 E-mail from H. Specter to R. Guzman Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting on July 29, 2021 ML21225A6142021-08-0909 August 2021 Email from NRC to the Tuscarora Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5682021-08-0909 August 2021 Email from NRC to the Stockbridge-Munsee Community Band of Mohican Indians Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5012021-08-0909 August 2021 Email from NRC to the Shinnecock Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21224A3032021-08-0909 August 2021 Email from NRC to the Mashantucket Pequot Tribe of Connecticut Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4252021-08-0909 August 2021 Email from NRC to the Oneida Nation of Wisconsin Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A3142021-08-0606 August 2021 Email from NRC to the Oneida Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4402021-08-0606 August 2021 Email from NRC to the Onondaga Nation of Wisconsin Announcing the IPEC PSDAR Meeting on August 18, 2021 ML21225A5462021-08-0606 August 2021 Email from NRC to the St. Regis Mohawk Tribe Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5352021-08-0606 August 2021 Email from NRC to the Tonawanda Band of Seneca Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21266A2942021-07-25025 July 2021 E-mail from Paul Blanch to NRC (N. Sheehan, D. Screnci) Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting, July 29, 2021 ML21197A2002021-07-16016 July 2021 (E-mail 7/16/2021) NRC Staff Assessment and RAI Closeout HDI Fleet Decommissioning Quality Assurance Program and Indian Point Energy Center Quality Assurance Program Manual ML21194A4082021-07-13013 July 2021 (7-13-2021) E-mail NRR Review Hour Estimate Change Supporting the Hi-Lift Crane Proposed License Amendment Request Review 2023-05-25
[Table view] |
Text
James Noggle From: Sandike, Steven Richard [SSandik@entergy.com]
Sent: Wednesday, September 17, 2008 4:30 PM To: James Noggle
Subject:
Info on U1 pool draining; Attachments: pool-inst.pdf; OIR-2008-004.pdf Jim ....
I have attached a steplist we are using with chemtechs to ensure adequate sampling at the compositors.... And a drawing to give you the big picture. The effluent line taps into the normal Distillate Tank (liquid waste) effluent line for compliance with SPDES. We have a floor supervisor from U1 projects stationed near the skid 24x7. He makes rounds once every 30 minutes. A chemtech collects samples from the second compositor once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. We have separate routines for collection of PCB samples. If needed, we have a tap off the line near the final totalizer to divert the entire stream to liquid waste processing.
The large Mixed Bed has 25 cubic feet of media, and the 4 beds that follow (GAC, CAT, MB, and another GAC) are all 12.5 cubic feet.
- We are limiting flow to 40 gpm or lower. We have two flowmeters on the stream, and a final calibrated totalizer on the outlet for quantification of total gallons released.
The system has been in recirc for months on the 24x7 mixed bed, and for about 5 days (with a few interruptions) through the other four beds as well. No PCBs were detected on the effluent of the skid while on recirc, and we're seeing about "L 00 kAq 1E-6 Cs-137 and some Kr-85. No other gammas. The last Sr-90 and Ni-63 analyses on the pool were about 2E 'ý-,(-
ILt-'uCi/ml, but this value is expected to be lower on the new completed skid effluent. I ran some calcs on the total effluent impact of this release and project it to be roughly equivalent to 4 distillate tank releases. (Fewer gamma's but conservatively including higher Sr/Ni). H-3 is consistently around 1E-4 uCi/ml. This info and standard ODCM release criteria were applied in the attache ODCM Ilnpact Review for the temp mod. (we attached this as part of the 50.59 process).,k oo000 OL We initiated draindown at 13:30 on Tuesday afternoon. We are writing permits in the unit 2 control room, updated every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from Chemistry data.
We expect the duration to be about 11-12 days, or less, depending on what we see for a d/p on the mixed bed inlet filter.
We will stop at 3 feet in the pool.
At some point after that, Don will initiate the sludge cleanup phase, but this will NOT go out through this pathway!
I believe Don and Chris are planning special collection processing for the sludge via a vendor and truck....
Don Mayer, Chris English, Mike Donegan, Dara Gray and myself, along with a host of others, are watching this evolution very carefully.
We'll certainly keep you posted if anything changes. One of us should be around if you'd like to call.
<<pool-inst.pdf>> <<OIR-2008-004.pdf>>
Effluents / RMS ENN Indian Point Energy Center Buchanan, NY 10511-0308 phone: 914-736-8455 fax: 914-734-6010 email: ssandikl8,enterqy.com CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and/or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access 1
I CHEMISTRY WORK STEP LIST SamplingRequirements for Unit 1 FuelPoolDraining RP WORK STEP LIST # CH-W,L.-CH-30 TITLES NECESSARY FOR APPROVAL: Chemistry Supervisor PRECAUTIONS/LIMITATIONS: Standard safety practices SHALL be observed at ALL times.
REFERENCES:
GLS Sampler Instruction Manual EQUIPMENT: GLS Samplers 1 liter PCB Sample bottles 500 cc poly bottles INSTRUCTIONS:
- 1. Initial Conditions a Purification system in service on recirc for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to start of release a Sample compositors setup at the outlet of each carbon bed 0 Composite samples set up to start sample collection with the following frequency:
Compositor 1 (Outlet of first charcoal (GAC) bed)
Sample size 500 cc
> Sampling frequency is approx every 360 minutes Compositor 2 (Outlet of 24x7 skid, after second GAC bed)
> Sample size 500 cc
> Sampling frequency is approximately every 30 minutes
- 2. The system will be operated in recirc for at least 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to draining. During that recirc period, obtain a sample from Compositor 1 & 2 by manually activating the sampler until sufficient sample has been obtained.
- 3. During the recirc, obtain a samples for PCB, and separately, another sample for gamma spec and boron, from both compositors. Then dump any remaining sample in the compositor bottles back into the pool. The release will start after Ops clears the tagout.
- 4. After the release has started, sample the stream as follows:
" Compositor 1: Every 3 days for PCB, gamma spec activity, and H-3.
- Compositor 2: Every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for gamma spec activity (with ADC at least daily),
Daily for PCB sample (plus a duplicate). Daily for Boron.
Record flow totalizer reading.
- After collecting a sample from the compositors, dump the remaining water back into pool.
Use the Waste Distillate counting sequence for gamma spectroscopy analysis.
- 5. After counting, acidify compositor 2 samples with 5 mls of nitric acid, label and save.
- 6. Weekly a composite will be made from the saved acidified samples for SPDES boron and off-site beta analyses (Sr-90/Ni-63).
- 7. Enter results of compositor 2 (Activity, ADC, and. Boron) in WinCDMS spent"fuel pool-west demin out, and also log in CCR. This information will be needed by Operations for the release permit.