Supplement to Request for License Amendment Technical Specification 5.6.3.d
ML090510137
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/12/2009
From: Burton C
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HNP-09-014, TAC MD8508
Download: ML090510137 (2)


Text

Christopher L. Burton

~ Progress Energy VHarisce Lpresident Harris Nuclear Plant Progress Energy Carolinas, Inc.

Serial: HNP-09-014 FEB -

10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 DOCKET NO. 50-400/LICENSE NO. NPF-63 SUPPLEMENT TO REQUEST FOR LICENSE AMENDMENT TECHNICAL SPECIFICATION 5.6.3.d

References:

1. Letter from M. Vaaler (Nuclear Regulatory Commission) to C. L.

Burton (Progress Energy), "Issuance of Amendment Regarding the use of Metamic as a Neutron Absorbing Material and Revised Loading Patterns in the Spent Fuel Pool (TAC NO. MD8508)," dated January 29, 2009

2. Letter from R. J. Duncan (Progress Energy) to the Nuclear Regulatory Commission (Serial: HNP-08-01 8), "Request for License Amendment Technical Specification 5.6.3.d," dated April 03, 2008 Ladies and Gentlemen:

On January 29, 2009, the NRC issued its approval (Reference 1) for a License Amendment Request regarding Technical Specification section 5.6.3.d for the Shearon Harris Nuclear Power Plant, Unit No. 1 (HNP). The original request was conveyed via Serial: HNP-08-018 (Reference 2).

An additional calculation for this review is provided as an Enclosure to this letter.

This document contains no new Regulatory Commitment.

Please refer any question regarding this submittal to Mr. Dave Corlett at (919) 362-3137.

I declare under pInalty of perjury that the foregoing is true and correct. Executed on FEB 2069 e Sincerely, Christoper L. Burton Vice President Harris Nuclear Plant N

Hl.

Box 165 New Hill, NC 27562

,A

  • .f' T> 919.362.2502 F> 919.362.2095

Serial: HNP-09-014 Page 2 CLB/kms

Enclosure:

Holtec International Report No. HI-971760 Revision 3 (non-proprietary)

Cc:

Mr. J. D. Austin, NRC Sr. Resident Inspector, HNP (w/o Enclosure)

Ms. B. 0. Hall, N.C. DENR Section Chief Mr. L. A. Reyes, NRC Regional Administrator, Region II (w/o Enclosure)

Ms. M. G. Vaaler, NRC Project Manager, HNP (w/o Enclosure)